Abstract
One of the main issues in cooperative enterprise planning and scheduling is how to re-assign tasks without involving too many components of every enterprise and implying too many changes in the whole system. We propose a new system that is able to re-schedule tasks in cooperative multisite production automatically avoiding one of the main problems that have schedule programmers that are in charge of two or more cooperative enterprises. The system is based on making virtual groups of machines that perform the same tasks and establishes links between machines from different groups. We will describe the algorithm in detail and we will validate it using a case of study. Results show that our proposal gives better performance.
Preview
Unable to display preview. Download preview PDF.
References
Sherali, H.D., Van Goubergen, D., Van Landeghem, H.: A Quantitative Approach for Scheduling Activities to Reduce Set-Up in Multiple Machine Lines. European Journal of Operational Research 187, 1224–1237 (2008)
Nystrom, R.H., Franke, R., Harjunkoski, H., Kroll, A.: Production Campaign Planning Including Grade Transition Sequencing And Dynamic Optimization. Computers & Chemical Engineering 29, 2163–2179 (2005)
Chan, F.T.S., Au, K.C., Chan, P.L.Y.: A Decision Support System For Production Scheduling In An Ion Plating Cell. Expert Systems with Applications 30, 727–738 (2006)
Kampf, M., Kochel, P.: Simulation-Based Sequencing and lot Size Optimisation for a Production-and-Inventory System with Multiple Items. International Journal of Production Economics 104, 191–200 (2006)
Quadt, D., Kuhn, H.: A Conceptual Framework For Lot-Sizing And Scheduling Of Flexible Flow Lines. International Journal of Production Research 43, 2291–2308 (2005)
Moursli, O., Pochet, Y.: A Branch-And-Bound Algorithm For The Hybrid Flowshop. International Journal of Production Economics 64, 113–125 (2000)
Yokoyama, M.: Flow-Shop Scheduling with Setup and Assembly Operations. European Journal of Operational Research 187, 1184–1195 (2008)
Wu, S.D., Storer, R.H., Pei-Chann, C.: One-Machine Rescheduling Heuristics With Efficiency And Stability As Criteria. Computers & Operations Research 20, 1–14 (1993)
Author information
Authors and Affiliations
Editor information
Rights and permissions
Copyright information
© 2008 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Lloret, J., Garcia-Sabater, J.P., Marin-Garcia, J.A. (2008). Cooperative Multisite Production Re-scheduling. In: Luo, Y. (eds) Cooperative Design, Visualization, and Engineering. CDVE 2008. Lecture Notes in Computer Science, vol 5220. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-88011-0_20
Download citation
DOI: https://doi.org/10.1007/978-3-540-88011-0_20
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-88010-3
Online ISBN: 978-3-540-88011-0
eBook Packages: Computer ScienceComputer Science (R0)