Skip to main content

Management Structure and Management Capacity

  • Chapter
Taming Giant Projects

Part of the book series: Organization and Management Innovation ((ORGMANAG))

  • 105 Accesses

Abstract

The importance of management structure and management capacity as success factors is undisputed and has been adequately shown by a literature survey (Wildemann 1982, pp.101, Kerzner 2001, pp.161, Cleland/King 1988, pp.269) as well as by our own empirical studies.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 54.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. “The first rule, therefore, is to keep the direct participants to an absolute minimum”. (Sykes 1982, p.143)

    Google Scholar 

  2. The consulting architect of the Montreal Games 1976 had a privileged position with the Major of Montreal. “He was thus able to interfere in many areas normally not the concern of a consulting architect: for example, the selection of contractors and professionals ... ” (Malouf et al. 1980, Vol. II, p.328).

    Google Scholar 

  3. See for Montreal: Malouf et al. (1980)

    Google Scholar 

  4. Larson/Goebel 1989 analyze the significance of project management structure (like functional/project matrix and project team) for the success of R&D projects.

    Google Scholar 

  5. “The Mayor of Montreal ... had neither the aptitude nor the knowledge necessary to take over the direction of an undertaking of such magnitude” (the Summer Olympics, note of the author). ... “The first magistrate of a city, and for that matter anyone holding public office, should not act as director of a project sponsored by public authority” (Malouf et al. 1980, Vol. II, pp.321, 323).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2004 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Grün, O. (2004). Management Structure and Management Capacity. In: Taming Giant Projects. Organization and Management Innovation. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-24818-7_10

Download citation

  • DOI: https://doi.org/10.1007/978-3-540-24818-7_10

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-05982-7

  • Online ISBN: 978-3-540-24818-7

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics