Abstract
QoS-constrained policy has an advantage to guarantee QoS requirements requested by users. Quorum systems can ensure the consistency and availability of replicated data despite the benign failure of data repositories. We propose a Quorum based resource management scheme, which resource Quorum includes middleware entity and network entity, both can satisfy requirements of application QoS. We also suggest a heuristic configuration algorithm in order to optimize performance and usage cost of Resource Quorum. We evaluate both simulations and experiments based on the electrocardiogram (ECG) application for health care, because this application requires transferring giga-bytes of data and analyzing complicated signal of ECG. Simulation results show that network capabilities are more important than computing capabilities, as both sizes of transferred data and computation task increases. Experimental results show that our scheme can reduce the total execution time of ECG application by using proposed heuristic algorithm compared to policy based management scheme.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Douglis, F., Foster, I.: The Grid Grows Up. In: Internet Computing IEEE 2003, pp. 24–26 (2003)
Foster, I., Kesselman, C.: Globus: A Metacomputing Infrastructure Toolkit. International J. Supercomputing Applications 11(2), 115–128 (1997)
Wolski, R.: Dynamically Forecasting Network Performance to Support Dynamic Scheduling Using the Network Weather Service. In: Proceedings of the 6th High-Performance Distributed Computing Conference (August 1997)
Yang, K., Galis, A., Todd, C.: A Policy-based Active Grid Management Architecture. In: Proceedings of 10th IEEE International Conference on Networks (ICOIN 2002), August 2002, pp. 243–248. IEEE Press, Los Alamitos (2002)
Liabotis, I., et al.: Self-organising management of Grid environments
Malkhi, D., Reiter, M.: Byzantine quorum systems. In: Proceedings of the 29th ACM Symposium on Theory of Computing (STOC) (May 1997)
Golberger, A., Amaral, L., Glass, L., Hausdorff, J.M., et al.: PhysioBank, PhysioToolkit, and PhysioNet:Component of a New Research Resource for Complex Physiologic Signals. Circulation 101(23) (June 2000)
Casanova, H.: Simgrid: A Toolkit for the Simulation of Application Scheduling. In: Proceedings of the First IEEE/ACM International Symposium on Cluster Computing and the Grid (CCGrid 2001), Brisbane, Australia, May 15-18 (2001)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2004 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Nam, D.S., Youn, CH., Lee, B.H., Clifford, G., Healey, J. (2004). QoS-Constrained Resource Allocation for a Grid-Based Multiple Source Electrocardiogram Application. In: Laganá, A., Gavrilova, M.L., Kumar, V., Mun, Y., Tan, C.J.K., Gervasi, O. (eds) Computational Science and Its Applications – ICCSA 2004. ICCSA 2004. Lecture Notes in Computer Science, vol 3043. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-24707-4_44
Download citation
DOI: https://doi.org/10.1007/978-3-540-24707-4_44
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-22054-1
Online ISBN: 978-3-540-24707-4
eBook Packages: Springer Book Archive