In each of the previous four chapters, each of the POMICS elements was extensively discussed in relation to the integration efforts taking place in the World of TUI. Interestingly enough, it has been shown that a large part of the analysis results apply to the entire sector as defined in the scope of this dissertation (i.e. large integrated tourism groups). The aim of this chapter is to bring all the results together and to clarify how they can be brought to action, while at the same time bringing forward the advantages of doing so.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Notes

  1. It may well be that such issues have been extensively discussed and researched. There is no evidence however, suggesting that decisions / consensus have been reached, formalised, and communicated

    Google Scholar 

  2. Large overlaps augment the advantages of common / pooled purchasing, while no overlaps render them minimal. In other words, the advantage of having ‘one face to supplier’ is of importance when referring to the’ same supplier’. Otherwise, purchasing together or separately makes no significant difference (except perhaps saving administration / coordination costs, which are by far offset by the costs of integrating anyway)

    Google Scholar 

  3. For those responsible for, committed to and long-involved in the integration effort, this scenario is extremely difficult to even consider, let alone openly discuss

    Google Scholar 

  4. Both Thomas Cook and TUI are currently preoccupied with slimming down their product portfolio, trimming down their workforces, reducing their flight and bed capacities, and in general redirecting their business models. During the last year, the integration taking place in parallel has very seldom been mentioned in the press, in interviews / corporate communication

    Google Scholar 

  5. TUI UK and TUI D both produce separate P&L accounts and their performance is controlled and measured by the holding on that basis. At the same time the cost and responsibility for synergies are split between the two companies, who are required to make them visible in their individual operational results. This may often create a prisoner’s dilemma” situation, when it comes to group synergies and / or benefits

    Google Scholar 

  6. Laartz, Sonderegger & Vinckier (2000). In relation to this point, Laartz, Monnoyer & Scherdin (2003), claim that during the 1990s many companies, especially those in information-intensive industries, who attempted such large-scale IT-landscape transformations have experienced enormous delays and costs, which offset the promised returns. As an alternative they offer the option of organising applications in business domains (e.g. product domain, channel domain) and then proceeding with standardisation / consolidation at domain level. The aim is a reduction of complexity at an acceptable cost and risk (conceptually this solution) stands midway between leaving the landscape / architecture as-is and between a full-scale architecture transformation

    Google Scholar 

  7. Laartz, Monnoyer, & Scherdin (2003) argue that IT-landscape transformation should be considered every time a business faces an urgent business challenge. (They place particular emphasis on post-merger integration)

    Google Scholar 

  8. Kiani-Kress (2003), Scharrer (2003b), Treuherz (2003), Knape (2003)

    Google Scholar 

  9. Schütz (2003), Bieker (2003), Eberle & Krummheuer (2003b), Krummheuer (2003a), Krummheuer (2003b)

    Google Scholar 

  10. Dzierzon & Bereszewski (2002) claim that 30–50% of outsourcing efforts fail to meet expectations. In that respect, the selection of appropriate outsourcing partners and management of the contractual relationship with the external supplier are essential capabilities. Nevertheless, this kind of competence is frequently missing

    Google Scholar 

  11. All Apollo project leaders and the programme director are employed by either TUI Germany or TUI UK

    Google Scholar 

  12. It should be noted that the various organisational parties developing and making those tools available, also have a vested interest in their widespread adoption and usage. Programme management and project leaders are likely to be receiving political pressure (coming from higher hierarchical levels demanding the utilisation of those tools) to adopt them. It may well be that each tool has advantages and is useful in its own right. The problems mentioned here are related to the multiplicity of reporting tools used

    Google Scholar 

  13. See relevant recommendation in section 8.1.2.2

    Google Scholar 

  14. Instead of performing a large-scale audit at the end of the year, a series of smaller-scale audits could be conducted at the end of each release, phase, or even iteration. The advantage is that methodology misapplication and / or lack of discipline could be revealed early enough to be effectively dealt with

    Google Scholar 

  15. Appendix C: SR 8001 to SR 8042 — From September 2001 to April 2003

    Google Scholar 

  16. The overall programme was meant to last for 2 years with an estimated cost of € 20 million [Gammel (2003)]

    Google Scholar 

  17. At this point it is important to note that the ‘weak spots’ may not originate from the current standard due diligence procedure / process of TUI itself, but from its actual implementation (i.e. lack of adherence to the standard). The importance of conducting due diligence in a disciplined manner is a prerequisite, almost a dogma, for any acquisition. The starting point for the recommendations made for this case study is that a due diligence process actually took place

    Google Scholar 

  18. As defined by the POMICS proposition

    Google Scholar 

  19. Appendix C: SR 8044

    Google Scholar 

  20. Appendix C: SR 8043

    Google Scholar 

  21. Appendix C: SR 8045

    Google Scholar 

  22. See interview with M&A respondent — Appendix D7

    Google Scholar 

  23. Appendix D7 — This is usually the case with direct sales tour operators, internet tour operators, and with software houses. In those cases, the business models contain a significant ICS component and therefore an ICS due diligence is compulsory

    Google Scholar 

Download references

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2004 Deutscher Universitäts-Verlag/GWV Fachverlage GmbH, Wiesbaden

About this chapter

Cite this chapter

Papathanassis, A. (2004). Synthesis and recommendations. In: Post-Merger Integration and the Management of Information and Communication Systems. Strategie, Marketing und Informationsmanagement. Deutscher Universitätsverlag. https://doi.org/10.1007/978-3-322-81879-9_8

Download citation

  • DOI: https://doi.org/10.1007/978-3-322-81879-9_8

  • Publisher Name: Deutscher Universitätsverlag

  • Print ISBN: 978-3-8244-8245-0

  • Online ISBN: 978-3-322-81879-9

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics