Abstract
The Grand Ethiopian Renaissance Dam (GERD) is expected to create a reservoir of 73 bcm (billion cubic meter) covering an area of 1883 km2 stretching 246 km upstream. The reservoir will be half the size of the upstream Lake Tana . After the surprise launching of the construction of GERD , the controversy around GERD quickly evolved from its engineering design and construction aspect to the impact of filling on the Sudan and Egypt . One of the controversies with Egypt is the number of years for initial reservoir filling, as shorter filling time requires more flow reduction and higher investment return from the dam. Longer filling time requires lower flow reduction and lower investment return from the dam. In this chapter, reported and synthetically generated stream flow data were used to estimate required period of time for initial reservoir filling. Results suggest that eight to nine years is likely required to fill the reservoir with 20% of the annual flow of each year held back. With a historical average Nile annual flow of 84 bcm at Aswan, the 132 bcm volume of the High Aswan Dam took six years (1971–1976) to reach full capacity with full river flow. Historical average Nile annual flow at Aswan is 84 bcm.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Abdehaleem FS, Hatat EY (2015) Impacts of Grand Ethiopian Renaissance Dam on different water usage in Upper Egypt. Br J Appl Sci Technol 8:461–483
Abtew W, Melesse AM (2014) Chapter 2: The Nile River Basin. In: Melesse AM, Abtew W, Setegn S (eds) Nile River Basin: ecohydrological challenges, climate change and hydropolitics. Springer, New York
Abtew W, Moras RG, Campbell KL (1990) Synthetic precipitation data generation. In: Proceedings of the 12th annual conference on computers and industrial engineering. Computers and industrial engineering 19:582–586
Abu-Zeid MA, El-Shibini FZ (2010) Egypt’s high Aswan Dam. Int J Water Resour Dev 13:209–218. https://doi.org/10.1080/07900629749836
Berhanu B, Seleshi Y, Melesse AMR (2014) Surface water and groundwater resources of Ethiopia: potentials and challenges of water resources development. In: Melesse AM, Abtew W, Setegn S (eds) Nile River Basin ecohydrological challenges, climate change and hydropolitics. Springer, New York
Betrie GD, Mohamed YA, van Griensven A, Srinivasan R (2011) Sediment management modelling in the Blue Nile basin using SWAT model. Hydrol Earth Syst Sci 15(3):807–818
Cascão AE, Nicol A (2016) GERD: new norms of cooperation in the Nile Basin? Water Int 41:550–573. https://doi.org/10.1080/02508060.2016.1180763
Conway D (2000) The climate and hydrology of the Upper Blue Nile River Geogr J 49–62
Engdayehu G, Fisseha G, Mekonnen M, Melesse AM (2016) Evaluation of technical standards of physical soil and water conservation practices and their role in soil loss reduction: the case of Debre Mewi watershed, north-west Ethiopia. In: Melesse AM, Abtew W (eds) Landscape dynamics, soils and hydrological. Springer, New York processes in varied climates. Springer, New York
FAO (Accessed 24 March 2018) Hydrologic regime in the Nile Basin. http://www.fao.org/docrep/015/an530e/an530e.pdf
Gessesse GD (2014) Assessment of soil erosion in the Blue Nile basin. In: Melesse AM, Abtew W, Setegn S (eds) Nile River Basin ecohydrological challenges, climate change and hydropolitics. Springer, New York
Hassen M (2013) Evaporation estimation for Lake Nasser based on remote sensing technology. Ain Shams Eng J 4(4):593–304
Hussein MF (1981) Dams, people and development: the high Aswan Dam case. Pergamon Press Inc., New York
IPoE (2013) International panel of experts on grand Ethiopian Renaissance Dam Project. Final Report, Addis Ababa, Ethiopia
Keith B, Epp K, Houghton M, Lee J, Mayville R (2014) Water as a conflict driver: estimating the effects of climate change and hydroelectric dam diversion on the Nile River stream flow during the 21st century. Center for Nation Reconstruction and Capacity Development, United States Military Academy, West Point, New York
King AM (2013) An assessment of reservoir filling policies under changing climate for Ethiopia’s Grand Renaissance Dam. Masters Thesis, Drexel University
McCartney MP, Girma MM (2012) Evaluating the downstream implications of planned water resource development in the Ethiopian portion of the Blue Nile River. Water Int 37:362–379
Mulat AG, Moges SA, Ibrahim Y (2014) Chapter 27 Impact and benefit study of Grand Ethiopian Renaissance Dam (GERD) during impounding and operation phases on downstream structures in the Eastern Nile. In: Melesse AM, Abtew W, Setegn S (eds) Nile River Basin ecohydrological challenges, climate change and hydropolitics. Springer, New York
Omar MH, El-Bakry MM (1981) Estimation of evaporation from the lake of the High Aswan Dam (Lake Nasser) based on measurements over the lake. Agric Meteorol 23:293–308
Peppersack J (2015) Seepage loss standards for ponds and reservoirs. Application Processing Memorandum No. 76. Idaho department of Water Resources. Idaho
Sadek MF, Shahin MM, Stigter CJ (1997) Evaporation from the reservoir of the High Aswan Dam, Egypt: a new comparison of relevant methods with limited data. Theoret Appl Climatol 56(1):57–66
Shahin M (1985) Hydrology of the Nile basin. Elsevier, New York
Strzepek KM, Yohe GW, Tol RSJ, Rosegrant MW (2008) The value of the high Aswan Dam to the Egyptian economy. Ecol Econ 66:117–126. https://doi.org/10.1016/j.ecolecon.2007.08.019
Tammo SS, Tilahun SA, Tesemma ZK, Tebebu TY, Moges M, Zimale FA, Worqlul AW, Alemu ML, Ayana EK, Mohamed YA (2014) Soil erosion in the Blue Nile basin: trends and challenges. In: Melesse AM, Abtew W, Setegn S (eds) Nile River Basin ecohydrological challenges, climate change and hydropolitics. Springer, New York
Tesemma ZK (2009) Long term hydrologic trends in the Nile basin. Masters thesis, Cornell University
Tesemma ZK, Mersha A, Wheeler K (2014) Reservoir filling options assessment for the Grand Ethiopian Renaissance Dam using a probabilistic approach. Grand Ethiopian Renaissance Dam Workshop. Abdul Latif Jamal World Water and Food Security Lab, MIT, MA, 13–14 Nov 2014
Wheeler KG, Basher M, Mekonnen ZT, Eltoum SO, Mersha A, Abdo GM (2016) Cooperative filling approaches for the Grand Ethiopian Renaissance Dam. Water Int 41:611–634. https://doi.org/10.1080/02508060.2016.1177698
Whittington D, Waterbury J, Jeuland M (2015) The Grand Renaissance Dam and prospects for cooperation on the Eastern Nile. Water Policy 16(4):595–608
Zhang Y, Block P, King A (2015) Ethiopia’s Grand Renaissance Dam: implications for downstream riparian countries. J Water Resour Plann Manage 141(9):1–18
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2019 Springer International Publishing AG, part of Springer Nature
About this chapter
Cite this chapter
Abtew, W., Dessu, S.B. (2019). Grand Ethiopian Renaissance Dam Reservoir Filling. In: The Grand Ethiopian Renaissance Dam on the Blue Nile. Springer Geography. Springer, Cham. https://doi.org/10.1007/978-3-319-97094-3_7
Download citation
DOI: https://doi.org/10.1007/978-3-319-97094-3_7
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-97093-6
Online ISBN: 978-3-319-97094-3
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)