Skip to main content

Measuring Labour Productivity in Labour Intensive Works on the Road Construction in Ghana

  • Conference paper
  • First Online:
Advances in Human Factors, Sustainable Urban Planning and Infrastructure (AHFE 2018)

Abstract

Reports from earlier studies indicate that low productivity is common in the construction industry in developing countries like Ghana and this could be attributed to poor labour productivity. The aim of this research is to develop a model for estimating the optimal Construction Labour Productivity (CLP) which can aid construction industry in determining and measuring labour productivity in labour intensive public works in Ghana. The objective are to identify the trend in measuring labour productivity; to identify the factors that affect construction labour Productivity on the site and to evaluate the effect of identified factors that affect construction labour productivity in Ghana. Content analysis was adopted to measure the productivity and the factors that affect productivity of labour during labour intensive works. The findings indicated that productivity; profitability; performance; efficiency and effectiveness contributed to the tipple model and productivity from literature was measured under work measurement which included time study; work sampling and activity sampling. The factors identified were grouped into five components, Management and control component; Work characteristics component; Equipment component; Materials component and workers component.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Amaoh Mensah, K.: Building Estimating Manual for West African Construction Practices. Parcom Ghana limited, Kumasi (1995)

    Google Scholar 

  2. Bamfo-Agyei, E., Kotey, S.: Establish the labour output constants for rendering, painting and terrazzo works using Activity Sampling technique. In: Commonwealth of Polytechnic Conference, Accra, Ghana, 23 November 2009

    Google Scholar 

  3. Cornwell, J.R., Cornwell, R.W.: You Can’t Manage What You Can’t Measure – Assessment of Learning in a Connected World (2006). http://tcfir.org/opinionretrieved. Accessed 20 May 2015

  4. Dozzi, S.P., AbouRizk, S.: Productivity in construction. Institute for Research in Construction, National Research Council, Ottawa (1993)

    Google Scholar 

  5. Fitzgerald, B.: Open source software implementation: anatomy of success and failure. Int. J. Open Source Softw. Process. 1(1), 1–19 (2009). http://www.brian-fitzgerald.com/publications/journal-paperse. Accessed 10 February 2015

  6. Freivalds, A.: Niebles Standards Methods and Work Design. McGraw Hill, New York (2009). http://tcfir.org/opinionretrieved. Accessed July 2015

  7. Goodrum, P., Haas, C.: Partial factor productivity and equipment technology change at activity level in US construction industry. J. Constr. Eng. Manag. 128(6), 463–472 (2002)

    Article  Google Scholar 

  8. Han, S.H., Park, S.H., Jin, E.J., Kim, H., Seong, Y.K.: Critical issues and possible solutions for motivating foreign construction workers. J. Manag. Eng. 24(4), 217–226 (2008)

    Article  Google Scholar 

  9. Hanna, A.S., Taylor, C.S., Sullivan, K.T.: Impact of extended overtime on construction labor productivity. J. Constr. Eng. Manag. 131(6), 734–739 (2005)

    Article  Google Scholar 

  10. Hanna, A.S., Russell, J.S., Nordheim, E.V., Bruggink, M.J.: Impact of change orders on labor efficiency for electrical construction. J. Constr. Eng. Manag. 125(4), 224–232 (1999)

    Article  Google Scholar 

  11. Jackson, M.: An analysis of flexible and reconfigurable production systems. Dissertation No. 640, Linköping University, Sweden, pp. 85–104 (2000). (Chap. 6)

    Google Scholar 

  12. Jang, H., Kim, K., Kim, J., Kim, J.: Labour productivity model for reinforced concrete construction projects. Constr. Innov. 11(1), 92–113. http://www.emeraldinsight.com/doi/abs/10.1108/14714171111104655. Accessed 5 May 2016

    Article  Google Scholar 

  13. Jarkas, A., Bitar, C.: Factors affecting construction labor productivity in Kuwait. J. Constr. Eng. Manage. 138(7), 811–820 (2012)

    Article  Google Scholar 

  14. Kim, S., Kim, Y.: A study on the construction labor productivity model using neuro-fuzzy network. In: Conference of the Architectural Institute of Korea, Ansan, Korea, vol. 21, no. 1, pp. 493–496 (2001)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Emmanuel Bamfo-Agyei .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer International Publishing AG, part of Springer Nature

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Bamfo-Agyei, E., Aigbavboa, C., Didibhuku, T.W. (2019). Measuring Labour Productivity in Labour Intensive Works on the Road Construction in Ghana. In: Charytonowicz, J., Falcão, C. (eds) Advances in Human Factors, Sustainable Urban Planning and Infrastructure. AHFE 2018. Advances in Intelligent Systems and Computing, vol 788. Springer, Cham. https://doi.org/10.1007/978-3-319-94199-8_50

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-94199-8_50

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-94198-1

  • Online ISBN: 978-3-319-94199-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics