Abstract
The fuzzy modified net present value (Fuzzy MNPV) method for evaluation of non-conventional investment projects under uncertainty explicitly provided for the use of the opportunity costs associated with the interim cash flows of an investment project and eliminated the major problems of traditional capital budgeting methods. Based on the same assumptions that guided the development of that method, the current paper presents a unified capital budgeting solution, consisting of the modified internal rate of return (Fuzzy MIRR), the modified profitability index (Fuzzy MPI), and the modified total payback (Fuzzy MTPB). These methods are MNPV-consistent, maximize shareholder wealth and always lead to the same conditions of acceptance or rejection of investment projects.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
de Souza Sampaio Filho, A.C., Vellasco, M.M.B.R., Tanscheit, R.: Modified net present value under uncertainties: an approach based on fuzzy numbers and interval arithmetic. In: Greco, S., Bouchon-Meunier, B., Coletti, G., Fedrizzi, M., Matarazzo, B., Yager, R.R. (eds.) IPMU 2012. CCIS, vol. 300, pp. 10–19. Springer, Heidelberg (2012). https://doi.org/10.1007/978-3-642-31724-8_2
de Souza Sampaio Filho, A.C.: Métodos Modificados de Avaliação de Investimentos em Condições de Incerteza: Uma Abordagem Baseada em Números Fuzzy [Modified Capital Budgeting Methods under Uncertainties: An Approach Based on Fuzzy Numbers], doctoral thesis. Rio de Janeiro: Pontifícia Universidade Católica do Rio de Janeiro [in Portuguese language] (2014)
McClure, K.G., Girma, P.B.: Modified net present value (MNPV): a new technique for capital budgeting. Zagreb Int. Rev. Econ. Bus. 7, 67–82 (2004)
Lin, S.A.Y.: The modified internal rate of return and investment criterion. Eng. Econ. 21(4), 237–247 (1976)
Beaves, R.G.: Net present value and rate of return: implicit and explicit reinvestment assumptions. Eng. Econ. 33(4), 275–302 (1988)
Shull, D.M.: Overall rates of return: investment bases, reinvestment rates and time horizons. Eng. Econ. 39(2), 139–163 (1994)
Vélez-Pareja, I.: Ranking and optimal selection of investments with internal rate and benefit-cost ratio. A Revision. Contaduría y Administración 57(1), 29–51 (2012)
Plath, D.A., Kennedy, W.F.: Teaching return-based measures of project evaluation. Finan. Pract. Educ. 4, 77–86 (1994)
Solomon, E.: The arithmetic of capital-budgeting decisions. J. Bus. 29(2), 124–129 (1956)
Zadeh, L.A.: Fuzzy sets. Inf. Control 8, 338–353 (1965)
Kahraman, C. (ed.): Fuzzy Engineering Economics with Applications. Springer, Heidelberg (2008). https://doi.org/10.1007/978-3-540-70810-0
Ulukan, Z., Ucuncuoglu, C.: Economic analyses for the evaluation of is projects. J. Inf. Syst. Technol. Manag. 7(2), 233–260 (2010)
Chiu, C.Y., Park, C.S.: Fuzzy cash flow analysis using present worth criterion. Eng. Econ. 39(2), 113–137 (1994)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG, part of Springer Nature
About this paper
Cite this paper
de Souza Sampaio Filho, A.C., Vellasco, M.M.B.R., Tanscheit, R. (2018). Modified Methods of Capital Budgeting Under Uncertainties: An Approach Based on Fuzzy Numbers and Interval Arithmetic. In: Medina, J., et al. Information Processing and Management of Uncertainty in Knowledge-Based Systems. Theory and Foundations. IPMU 2018. Communications in Computer and Information Science, vol 853. Springer, Cham. https://doi.org/10.1007/978-3-319-91473-2_65
Download citation
DOI: https://doi.org/10.1007/978-3-319-91473-2_65
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-91472-5
Online ISBN: 978-3-319-91473-2
eBook Packages: Computer ScienceComputer Science (R0)