Turkey – Istanbul - Third Bosporus Bridge

Issues Related to the 305 Meters Tower Erection
Conference paper
Part of the Lecture Notes in Civil Engineering book series (LNCE, volume 10)

Abstract

The aim of the article is to describe the construction method and the difficulties encountered for the execution of an exceptional and unique work within the 3rd Bosphorus Bridge: the erection of the A-shaped towers. The erection of the A-shaped towers was a highly challenging activity due to their geometry and to the two different methods of construction: the slip forming system and an automatic climbing formwork system.

Keywords

Towers’ leg Slip-forming system Automatic climbing system Mix design Geometry 

References

  1. 1.
    BB3 Concrete Works – SpecificationsGoogle Scholar
  2. 2.
    BB3 Technical Specifications steel worksGoogle Scholar
  3. 3.
    BB3 Design BasisGoogle Scholar
  4. 4.
    BB3 Monitoring specificationsGoogle Scholar
  5. 5.
    BB3 Method Statement for Construction of the Towers (until at EL+208.0 m)Google Scholar
  6. 6.
    BB3 Method Statement for ACS OperationsGoogle Scholar
  7. 7.
    BB3 Material Approval – Concrete Mix DesignGoogle Scholar
  8. 8.
    BB3 Precamber and Target Coordinate ReportGoogle Scholar
  9. 9.
    BB3 Method Statement for Mock-up TestGoogle Scholar
  10. 10.
    BB3 T-ENG Design Report Concrete Pylon SectionsGoogle Scholar
  11. 11.
    BB3 T-ENG Technical report – Concreting TechnologyGoogle Scholar
  12. 12.
    T-ENG BB3 Slipform difficulties – Acceptance of repairs on the damaged bottom partGoogle Scholar
  13. 13.
    T-ENG BB3 Slipform difficulties – Designer remarks on work plan for recommencing and conclusion reportGoogle Scholar
  14. 14.
    BB3 Surface Treatment and Repair Method for Tower ConcreteGoogle Scholar
  15. 15.
    BB3 Acceptance Criteria for Tower Concrete ReparationsGoogle Scholar

Copyright information

© Springer International Publishing AG, part of Springer Nature 2018

Authors and Affiliations

  • G. Fiscina
    • 1
  • C. J. Garrone
    • 2
  • R. Sorge
    • 3
    • 4
  • M. Mancini
    • 5
  1. 1.Astaldi S.p.A., Direttore di CostruzioneIstanbulTurkey
  2. 2.Astaldi S.p.A., Astaldi, Assistente Direttore di CostruzioneIstanbulTurkey
  3. 3.Astaldi S.p.A., Responsabile dell’Ingegneria CorporateRomeItaly
  4. 4.Astaldi S.p.A., Responsabile della ProgettazioneIstanbulTurkey
  5. 5.Astaldi S.p.A., Servizio Ingegneria, Responsabile Comunicazione Tecnica di ProgettoIstanbulTurkey

Personalised recommendations