Project Monitoring and Control

  • Alberto De Marco
Chapter

Abstract

As engineering and construction activities unfold, the project actual status may diverge from the planned one, with discrepancies in expenditures, productivity and work pace. This chapter highlights the principles of accurate cost and schedule performance monitoring and control. First, it illustrates the method for measuring the actual progress of work. Second, the Earned Value Analysis is quantitatively explained together with the introduction of the Earned Schedule notion. Third, various available methods for estimating the final cost and schedule at completion are given. Then, various project reporting practices are shown. Finally, the possible control actions to bring the project back on track are discussed.

References and Additional Resources

  1. Bennet J (1985) Construction project management. Butterworths, LondonGoogle Scholar
  2. CII Construction Industry Institute (2004) Project control for construction. CII, Austin, TX, RS6-5Google Scholar
  3. Christensen DS, Antolini RC, McKinney JW (1995) A review of estimate at completion research. J Cost Anal Manag 41–62. SpringerGoogle Scholar
  4. Christensen DS (1999) Using the earned value cost management report to evaluate the contractor’s estimate at completion. Acquisition Rev Quart Summer 1999:283–295Google Scholar
  5. De Marco A, Briccarello D, Rafele C (2009) Cost and schedule monitoring of industrial building projects: case study. J Constr Eng Manag 9(1):853–862CrossRefGoogle Scholar
  6. Hendrickson C (2008) Project management for construction. Online Ed., http://www.ce.cmu.edu/pmbook/
  7. Holm L, Schaufelberger J (2002) Management of construction projects. Prentice Hall, Upper Saddle River, NJGoogle Scholar
  8. Jung Y, Woo S (2004) Flexible work breakdown structure for integrated cost and schedule control. J Constr Eng Manage 130(5):616–625CrossRefGoogle Scholar
  9. Eldin NN (1989) Measurement of work progress: quantitative technique. J Constr Eng Manage 115(3):462–474CrossRefGoogle Scholar
  10. Fleming QW (1991) Cost/schedule control systems criteria: the management guide to C/SCSC, Rev edn. Probus Publishing Company, Chicago, ILGoogle Scholar
  11. Lipke W (2003) Schedule is different. The Measurable News, Summer, pp 31–34Google Scholar
  12. Lipke W (2005, June) Connecting earned value to the schedule. Crosstalk J Defense Softw EngGoogle Scholar
  13. Meredith JR, Mantel SJ Jr (2006) Project management a managerial approach, 6th edn. Wiley, Hoboken, NJGoogle Scholar
  14. Narbaev T, De Marco A (2014) Combination of a growth model and earned schedule to forecast project cost at completion. J Constr Eng Manage 140(1)Google Scholar
  15. Pierce DR Jr (2004) Project scheduling and management for construction, 3rd edn. Reed Construction Data, Kingston, MAGoogle Scholar
  16. Project Management Institute (2016) A guide to the project management body of knowledge, 6th edn. Project Management Institute, Newtown Square, PAGoogle Scholar
  17. Project Management Institute (2008) A guide to earned value management. Project Management Institute, Newtown Square, PAGoogle Scholar
  18. Ritz GJ (1994) Total construction project management. McGraw-Hill, New York, NYGoogle Scholar
  19. U.S. Department of Energy (DoE) (1980, May) Cost & schedule control systems criteria for contract performance measurement. Implementation Guide. DoE, MA-0087Google Scholar
  20. Yang YC, Park CJ, Kim JH, Kim JJ (2007) Management of daily progress in a construction project of multiple apartment buildings. J Constr Eng Manage 133(3):242–253CrossRefGoogle Scholar
  21. Winch GM (2002) Managing construction projects. Blackwell Publishing, Oxford, UKGoogle Scholar
  22. Woodward JF (1997) Construction project management getting it right first time. Thomas Telford, LondonCrossRefGoogle Scholar

Copyright information

© Springer International Publishing AG, part of Springer Nature 2018

Authors and Affiliations

  1. 1.Department of Management and Production EngineeringPolitecnico di TorinoTurinItaly

Personalised recommendations