Contract Organization

  • Alberto De Marco
Chapter

Abstract

Project Management primarily consists on managing a contract between the owner and the entities charged with the higher-level portions of the project scope, namely: financing, design and development. To this end, this chapter illustrates some of the most used delivery systems and presents the tradeoffs involved in different contracting mechanisms, with focus on risk-sharing and incentive issues. The various contract architectures are depicted as decomposed into three main components: a delivery system, a payment mechanism, and an award method. At the end, the way that these elements can be put together to form a suitable contract for diverse situations is discussed.

References and Additional Resources

  1. American Management Association (1986) The contracts management deskbook, revised edn. New YorkGoogle Scholar
  2. Anderson S, Oyetunji A (2003) Selection procedure for project delivery and contract strategy. In: Construction research, pp 1–9Google Scholar
  3. Bakatjan S, Arikan M, Tiong RLK (2003) Optimal capital structure model for BOT power projects in Turkey. J Constr Eng Manag 129(1):89–97CrossRefGoogle Scholar
  4. Bennet J (1991) International construction project management: general theory and practice. Butterworth-Heinemann, pp 351–353, 356–377Google Scholar
  5. Clough RH, Sears GA (1994) Construction contracting, 6th edn. Wiley, New York, NYGoogle Scholar
  6. De Marco A, Rafele C (2008) Aligning construction project participants on appropriate contract arrangement. In: Proceedings of 22nd IPMA world congress, Rome, 9–11 Nov 2008, vol 1, pp 195–200Google Scholar
  7. De Marco A, Mangano G, Cagliano AC, Grimaldi S (2012) Public financing into build-operate-transfer hospital projects in Italy. J Constr Eng Manag 138(11):1294–1302CrossRefGoogle Scholar
  8. Dorsey RW (1997) Project delivery systems for building construction. Associated General Contractors of America, New York, NYGoogle Scholar
  9. Finnerty JD (2007) Project financing: asset-based financial engineering, 2nd edn. Wiley, Hoboken, New JerseyGoogle Scholar
  10. Gordon CM (1991) Compatibility of construction contracting methods with projects and owners, MIT MsThesis. http://hdl.handle.net/1721.1/12955
  11. Gordon CM (1994) Choosing appropriate construction contracting method. J Constr Eng 120(1):196–210CrossRefGoogle Scholar
  12. Hendrickson C (2008) Project management for construction, 2nd edn. Carnegie Mellon University, Pittsburgh, PA. http://www.ce.cmu.edu/pmbook/
  13. Macomber JD (1989) You Can manage construction risk. Harvard Bus Rev 67(2)Google Scholar
  14. Nicolas JM, Steyn H (2008) Project management for business, engineering, and technology, 3rd edn. Elsevier, Burlington, MAGoogle Scholar
  15. Oyetunji A, Anderson S (2002) Project delivery and contract strategy. Research Report 165-12. Construction Industry Institute, Austin, TXGoogle Scholar
  16. Schaufelberger JE, Wipadapisut I (2003) Alternate financing strategies for build-operate-transfer projects. J Constr Eng Manag 129(2):205–213CrossRefGoogle Scholar
  17. Thompson L (2004) Mind and heart of the negotiator. Pearson Academic, Upper Saddle River, NJGoogle Scholar
  18. Zhang X (2005) Financial viability analysis and capital structure optimization in privatized public infrastructure projects. J Constr Eng Manag 131(6):656–668CrossRefGoogle Scholar

Copyright information

© Springer International Publishing AG, part of Springer Nature 2018

Authors and Affiliations

  1. 1.Department of Management and Production EngineeringPolitecnico di TorinoTurinItaly

Personalised recommendations