Scrum is an increasingly common approach to software development adopted by organizations around the world. However, as organizations transition from traditional plan-driven development to agile development with Scrum, the question arises as to which Scrum role (Product Owner, Scrum Master, or Scrum Team Member) corresponds to a Project Manager, or conversely which Scrum role should the Project Managers adopt?
In an attempt to answer this question, we adopted a mixed-method research approach comprising a systematic literature review and a case study of a commercial software development team. Our research has identified activities that comprise the Scrum Master role, and which additional roles are actually performed by Scrum Masters in practice.
We found ten activities that are performed by Scrum Masters. In addition, we found that Scrum Masters also perform other roles, most importantly as Project Managers. This latter situation results in tension and conflict of interest that could have a negative impact on the performance of the team as a whole.
These results point to the need to re-assess the role of Project Managers in organizations that adopt Scrum as a development approach. We hypothesize that it might be better for Project Managers to become Product Owners, as aspects of this latter role are more consistent with the traditional responsibilities of a Project Manager .
Keywords
This is a preview of subscription content, log in via an institution.
References
Schwaber, K.: SCRUM development process. In: Sutherland, J., Casanave, C., Miller, J., Patel, P., Hollowell, G. (eds.) Business Object Design and Implementation, OOPSLA 1995 Workshop Proceedings, pp. 117–134. Springer, London (1995)
Schwaber, K., Beedle, M.: Agile software Development with Scrum, vol. 1. Prentice Hall Upper Saddle River, NJ (2002)
VERSIONONE.COM: 11th annual state of agile™ survey. Technical report, VersionOne, Inc. (2017)
Schwaber, K.: Agile Project Management with Scrum. Microsoft press, WA (2004)
Cohn, M., Schwaber, K.: The need for agile project management. Agile Times, vol. 1, January 2003
Bass, J.M.: Scrum master activities: process tailoring in large enterprise projects. In: 2014 IEEE 9th International Conference on Global Software Engineering (ICGSE), pp. 6–15. IEEE (2014)
Schwaber, K., Sutherland, J.: The Scrum guide-the definitive guide to Scrum: The rules of the game (2016). http://www.scrum.org/storage/scrumguides/Scrum%20Guide
Gupta, R.K., Reddy, P.M.: Adapting agile in a globally distributed software development. In: 2016 49th Hawaii International Conference on System Sciences (HICSS), pp. 5360–5367, January 2016
ISO/IEC/IEEE: Systems and software engineering - developing user documentation in an agile environment. Technical report, International Standards Organization, March 2012
Tengshe, A., Noble, S.: Establishing the agile PMO: managing variability across projects and portfolios. In: Agile 2007 (AGILE 2007), pp. 188–193, August 2007
Paasivaara, M., Lassenius, C.: Scaling Scrum in a large distributed project. In: 2011 International Symposium on Empirical Software Engineering and Measurement, pp. 363–367, September 2011
Paasivaara, M., Lassenius, C.: Scaling Scrum in a large globally distributed organization: a case study. In: 2016 IEEE 11th International Conference on Global Software Engineering (ICGSE), pp. 74–83, August 2016
Stray, V.G., Lindsjorn, Y., Sjoberg, D.I.: Obstacles to efficient daily meetings in agile development projects: a case study. In: 2013 ACM/IEEE International Symposium on Empirical Software Engineering and Measurement, pp. 95–102. IEEE (2013)
Moe, N.B., Dingsyr, T., Dyb, T.: Understanding self-organizing teams in agile software development. In: 19th Australian Conference on Software Engineering (ASWEC 2008), pp. 76–85, March 2008
Shastri, Y., Hoda, R., Amor, R.: Does the project manager still exist in agile software development projects? In: 2016 23rd Asia-Pacific Software Engineering Conference (APSEC), pp. 57–64, December 2016
Berczuk, S., Lv, Y.: We’re all in this together. IEEE Softw. 27(6), 12–15 (2010)
Sutherland, J.V., Schwaber, K.: Business object design and implementation: OOPSLA 1995 workshop proceedings. The University of Michigan. Technical report (1995). ISBN 3-540-76096-2
Creswell, J.W.: Research Design: Qualitative, Quantitative, and Mixed Methods Approaches, 4th edn. SAGE Publications Inc., Thousand Oaks, California (2013)
Kitchenham, B., Charters, S.: Guidelines for performing systematic literature reviews in software engineering, v. 2.3. Technical report EBSE-2007-01, Software Engineering Group, School of Computer Science and Mathematics, Keele University (2007)
Beecham, S., Noll, J., Razzak, M.A.: Lean global project interview protocol (2017). http://www.lero.ie/sites/default/files/Lero_TR_2017_02_Beecham_Noll_Razzak-Lean%20Global%20Project%20Interview%20Protocol.pdf
Braun, V., Clarke, V.: Using thematic analysis in psychology. Qual. Res. Psychol. 3(2), 77–101 (2006)
Andriyani, Y., Hoda, R., Amor, R.: Reflection in agile retrospectives. In: Baumeister, H., Lichter, H., Riebisch, M. (eds.) XP 2017. LNBIP, vol. 283, pp. 3–19. Springer, Cham (2017). doi:10.1007/978-3-319-57633-6_1
Baumgart, R., Hummel, M., Holten, R.: Personality traits of Scrum roles in agile software development teams-a qualitative analysis. In: ECIS (2015)
Costa, N., Santos, N., Ferreira, N., Machado, R.J.: Delivering user stories for implementing logical software architectures by multiple Scrum teams. In: Murgante, B., et al. (eds.) ICCSA 2014. LNCS, vol. 8581, pp. 747–762. Springer, Cham (2014). doi:10.1007/978-3-319-09150-1_55
Dorairaj, S., Noble, J., Malik, P.: Understanding team dynamics in distributed agile software development. In: Wohlin, C. (ed.) XP 2012. LNBIP, vol. 111, pp. 47–61. Springer, Heidelberg (2012). doi:10.1007/978-3-642-30350-0_4
Alzoubi, Y.I., Gill, A.Q., Al-Ani, A.: Empirical studies of geographically distributed agile development communication challenges: a systematic review. Inf. Manag. 53(1), 22–37 (2016)
Maranzato, R.P., Neubert, M., Herculano, P.: Moving back to Scrum and scaling to Scrum of Scrums in less than one year. In: Proceedings of the ACM International Conference Companion on Object Oriented Programming Systems Languages and Applications Companion, pp. 125–130. ACM (2011)
Bless, M.: Distributed meetings in distributed teams. In: Sillitti, A., Martin, A., Wang, X., Whitworth, E. (eds.) XP 2010. LNBIP, vol. 48, pp. 251–260. Springer, Heidelberg (2010). doi:10.1007/978-3-642-13054-0_27
Cajander, Å., Larusdottir, M., Gulliksen, J.: Existing but not explicit - the user perspective in Scrum projects in practice. In: Kotzé, P., Marsden, G., Lindgaard, G., Wesson, J., Winckler, M. (eds.) INTERACT 2013. LNCS, vol. 8119, pp. 762–779. Springer, Heidelberg (2013). doi:10.1007/978-3-642-40477-1_52
Gulliksen Stray, V., Moe, N.B., Dingsøyr, T.: Challenges to teamwork: a multiple case study of two agile teams. In: Sillitti, A., Hazzan, O., Bache, E., Albaladejo, X. (eds.) XP 2011. LNBIP, vol. 77, pp. 146–161. Springer, Heidelberg (2011). doi:10.1007/978-3-642-20677-1_11
Drury, M., Conboy, K., Power, K.: Obstacles to decision making in agile software development teams. J. Syst. Softw. 85(6), 1239–1254 (2012)
Heikkilä, V.T., Paasivaara, M., Rautiainen, K., Lassenius, C., Toivola, T., Järvinen, J.: Operational release planning in large-scale Scrum with multiple stakeholders-a longitudinal case study at f-secure corporation. Inf. Softw. Technol. 57, 116–140 (2015)
Vlietland, J., van Vliet, H.: Towards a governance framework for chains of Scrum teams. Inf. Softw. Technol. 57, 52–65 (2015)
Chamberlain, S., Sharp, H., Maiden, N.: Towards a framework for integrating agile development and user-centred design. In: Abrahamsson, P., Marchesi, M., Succi, G. (eds.) XP 2006. LNCS, vol. 4044, pp. 143–153. Springer, Heidelberg (2006). doi:10.1007/11774129_15
Stray, V., Fægri, T.E., Moe, N.B.: Exploring norms in agile software teams. In: Abrahamsson, P., Jedlitschka, A., Nguyen Duc, A., Felderer, M., Amasaki, S., Mikkonen, T. (eds.) PROFES 2016. LNCS, vol. 10027, pp. 458–467. Springer, Cham (2016). doi:10.1007/978-3-319-49094-6_31
Daneva, M., Van Der Veen, E., Amrit, C., Ghaisas, S., Sikkel, K., Kumar, R., Ajmeri, N., Ramteerthkar, U., Wieringa, R.: Agile requirements prioritization in large-scale outsourced system projects: an empirical study. J. Syst, Softw. 86(5), 1333–1353 (2013)
Alaa, G., Samir, Z.: A multi-faceted roadmap of requirements traceability types adoption in Scrum: an empirical study. In: 2014 9th International Conference on Informatics and Systems (INFOS), p. SW-1. IEEE (2014)
Baskerville, R., Pries-Heje, J., Madsen, S.: Post-agility: what follows a decade of agility? Inf. Softw. Technol. 53(5), 543–555 (2011)
Caballero, E., Calvo-Manzano, J.A., San Feliu, T.: Introducing scrum in a very small enterprise: a productivity and quality analysis. In: O‘Connor, R.V., Pries-Heje, J., Messnarz, R. (eds.) EuroSPI 2011. CCIS, vol. 172, pp. 215–224. Springer, Heidelberg (2011). doi:10.1007/978-3-642-22206-1_19
Santos, R., Flentge, F., Begin, M.-E., Navarro, V.: Agile technical management of industrial contracts: scrum development of ground segment software at the european space agency. In: Sillitti, A., Hazzan, O., Bache, E., Albaladejo, X. (eds.) XP 2011. LNBIP, vol. 77, pp. 290–305. Springer, Heidelberg (2011). doi:10.1007/978-3-642-20677-1_21
Bass, J.M.: How product owner teams scale agile methods to large distributed enterprises. Empirical Softw. Eng. 20(6), 1525–1557 (2015)
Gren, L., Torkar, R., Feldt, R.: Group development and group maturity when building agile teams: a qualitative and quantitative investigation at eight large companies. J. Syst. Softw. 124, 104–119 (2017)
Hoda, R., Murugesan, L.K.: Multi-level agile project management challenges: a self-organizing team perspective. J. Syst. Softw. 117, 245–257 (2016)
Tuomikoski, J., Tervonen, I.: Absorbing software testing into the Scrum method. In: Bomarius, F., Oivo, M., Jaring, P., Abrahamsson, P. (eds.) PROFES 2009. LNBIP, vol. 32, pp. 199–215. Springer, Heidelberg (2009). doi:10.1007/978-3-642-02152-7_16
Stray, V., Sjøberg, D.I., Dybå, T.: The daily stand-up meeting: a grounded theory study. J. Syst. Softw. 114, 101–124 (2016)
Moe, N.B., Dingsøyr, T.: Scrum and team effectiveness: theory and practice. In: Abrahamsson, P., Baskerville, R., Conboy, K., Fitzgerald, B., Morgan, L., Wang, X. (eds.) XP 2008. LNBIP, vol. 9, pp. 11–20. Springer, Heidelberg (2008). doi:10.1007/978-3-540-68255-4_2
Díaz, J., Pérez, J., Garbajosa, J.: Agile product-line architecting in practice: a case study in smart grids. Inf. Softw. Technol. 56(7), 727–748 (2014)
Sekitoleko, N., Evbota, F., Knauss, E., Sandberg, A., Chaudron, M., Olsson, H.H.: Technical dependency challenges in large-scale agile software development. In: Cantone, G., Marchesi, M. (eds.) XP 2014. LNBIP, vol. 179, pp. 46–61. Springer, Cham (2014). doi:10.1007/978-3-319-06862-6_4
Diebold, P., Ostberg, J.-P., Wagner, S., Zendler, U.: What do practitioners vary in using Scrum? In: Lassenius, C., Dingsøyr, T., Paasivaara, M. (eds.) XP 2015. LNBIP, vol. 212, pp. 40–51. Springer, Cham (2015). doi:10.1007/978-3-319-18612-2_4
Garbajosa, J., Yagüe, A., Gonzalez, E.: Communication in agile global software development: an exploratory study. In: Meersman, R., Panetto, H., Mishra, A., Valencia-García, R., Soares, A.L., Ciuciu, I., Ferri, F., Weichhart, G., Moser, T., Bezzi, M., Chan, H. (eds.) OTM 2014. LNCS, vol. 8842, pp. 408–417. Springer, Heidelberg (2014). doi:10.1007/978-3-662-45550-0_41
Li, J., Moe, N.B., Dybå, T.: Transition from a plan-driven process to Scrum: a longitudinal case study on software quality. In: Proceedings of the 2010 ACM-IEEE international symposium on empirical software engineering and measurement, p. 13. ACM (2010)
Galster, M., Angelov, S., Meesters, M., Diebold, P.: A multiple case study on the architect’s role in Scrum. In: Abrahamsson, P., Jedlitschka, A., Nguyen Duc, A., Felderer, M., Amasaki, S., Mikkonen, T. (eds.) PROFES 2016. LNCS, vol. 10027, pp. 432–447. Springer, Cham (2016). doi:10.1007/978-3-319-49094-6_29
Alahyari, H., Svensson, R.B., Gorschek, T.: A study of value in agile software development organizations. J. Syst. Softw. 125, 271–288 (2017)
Vlaanderen, K., van Stijn, P., Brinkkemper, S., van de Weerd, I.: Growing into agility: process implementation paths for Scrum. In: Dieste, O., Jedlitschka, A., Juristo, N. (eds.) PROFES 2012. LNCS, vol. 7343, pp. 116–130. Springer, Heidelberg (2012). doi:10.1007/978-3-642-31063-8_10
Leffingwell, D.: Scaling software agility: Best practices for large enterprises. Addison Wesley, Boston (2007)
Acknowledgments
We thank the members of TeamA and members of the Project Management Team for their generous and thoughtful collaboration on this study, and PracMed, for allowing us to study their software development efforts. This work was supported, in part, by Science Foundation Ireland grants 10/CE/I1855 and 13/RC/2094 to Lero - the Irish Software Research Centre (www.lero.ie).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing AG
About this paper
Cite this paper
Noll, J., Razzak, M.A., Bass, J.M., Beecham, S. (2017). A Study of the Scrum Master’s Role. In: Felderer, M., Méndez Fernández, D., Turhan, B., Kalinowski, M., Sarro, F., Winkler, D. (eds) Product-Focused Software Process Improvement. PROFES 2017. Lecture Notes in Computer Science(), vol 10611. Springer, Cham. https://doi.org/10.1007/978-3-319-69926-4_22
Download citation
DOI: https://doi.org/10.1007/978-3-319-69926-4_22
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-69925-7
Online ISBN: 978-3-319-69926-4
eBook Packages: Computer ScienceComputer Science (R0)