Skip to main content

GUI of GMS Simulation Tool Using Fuzzy Methods

  • Conference paper
  • First Online:
Advances in Intelligent Information Hiding and Multimedia Signal Processing (IIH-MSP 2017)

Part of the book series: Smart Innovation, Systems and Technologies ((SIST,volume 82))

  • 1145 Accesses

Abstract

This study used the fuzzy theory for creating preventive maintenance scheduling of generator (GMS). GMS simulation tool is developed in optimum by the CO2 emission, probabilistic production cost, and reliability criteria LOLE(Loss of load expectation), EENS(Expected energy not served) in the objective functions. GMS has shown in graphical user interface (GUI) for the user-friendliness of the generator. It can be resulted in generator maintenance scheduling, reliability indices of power system, total probabilistic production costs and each power company probabilistic production costs.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Choi, J.S.: A study on the generator maintenance scheduling considering load uncertainty & multi-criterion function. EESRI, Final Report (1995)

    Google Scholar 

  2. Lee, B.Y., Shim, K.B.: A comparative study on optimal generation maintenance scheduling with marginal maintenance cost and levelized risk method. KIEE 41(1), 9–17 (1992) (written in Koeran)

    Google Scholar 

  3. Khatib, H.: Economic Evaluation of Projects in the Electricity Supply Industry. IEEE Power & Energy Series, vol. 44. MPG Books Limited (2003)

    Google Scholar 

  4. Kim, H.S., Moon, S.P., Do, D.H., Choi, J.S., Lee, S.Y., Shin, H.K., Kim, S.H., Kim, Y.S.: Generator maintenance scheduling considering air pollution. In: Proceedings on Autumn Meeting of Western Gyeongnam Area of KIEE, pp. 57–60 (1998) (written in Koeran)

    Google Scholar 

  5. Park, J., Wu, L., Choi, J., Baek, U.-K., Cho, W., Song, K., Cha, J., Lee, K.Y.: Fuzzy set theory based flexible generator maintenance scheduling. In: ISME 2009 (2009)

    Google Scholar 

  6. Park, J., Wu, L., Choi, J., Cha, J., Lee, K.Y.: Fuzzy set theory based on generator maintenance scheduling. In: ISME 2009. Dalian University of Technology, Dalian, China (2009)

    Google Scholar 

  7. Park, J., Wu, L., Choi, J., Baek, U.-K., Cho, W., Song, K., Cha, J., Lee, K.Y.: Fuzzy set theory based flexible generator maintenance scheduling. In: ISME 2009, August 5–7 (2009)

    Google Scholar 

  8. Oh, T., Park, J., Cho, K., Choi, J., Baek, U., El-Keib, A.A.: Generators maintenance scheduling using combined fuzzy set theory and GA. In: ICEE 2010, Paradise Hotel, Busan, Korea (2010)

    Google Scholar 

  9. Hwang, B., Lee, H., Park, K., Shin, Y.: A case study for determining system marginal price in Korea electricity market. In: KIEE 2011, Yongpyong Resort, Korea (2011) (written in Koeran)

    Google Scholar 

  10. Lee, Y., Lim, J., Oh, U., Do, D.P.N., Choi, J.: A study on the various objective functions based optimal generator maintenance scheduling in KOSEP. In: IGSC 2015, October 12–14 (2015)

    Google Scholar 

  11. Choi, J.: Visual system of probabilistic generator maintenance scheduling considering the various objective functions. In: PMAPS 2016, China (2016)

    Google Scholar 

Download references

Acknowledgment

This work was supported by the Korean National Research Foundation (NRF) (No.#2012R1A2A2A01012803) and Korea South-East Power Co. (KOEN)

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jaeseok Choi .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG

About this paper

Cite this paper

Lee, Y., Choi, J., Jung, M., Watada, J. (2018). GUI of GMS Simulation Tool Using Fuzzy Methods. In: Pan, JS., Tsai, PW., Watada, J., Jain, L. (eds) Advances in Intelligent Information Hiding and Multimedia Signal Processing. IIH-MSP 2017. Smart Innovation, Systems and Technologies, vol 82. Springer, Cham. https://doi.org/10.1007/978-3-319-63859-1_42

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-63859-1_42

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-63858-4

  • Online ISBN: 978-3-319-63859-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics