Advertisement

Minisymposium: 10 Years of Portuguese Study Groups with Industry

  • Manuel Cruz
  • Pedro Freitas
  • João Nuno Tavares
Conference paper
Part of the Mathematics in Industry book series (MATHINDUSTRY, volume 26)

Abstract

This minisymposium provided an overview of the implementation and evolution of European Study Groups (ESGI) in Portugal, describing our experience and some industrial problems dealt with, the challenges that had to be overcome and examples of successful and less successful stories.

References

  1. 1.
    AMPL Optimization LLC: AMPL: A Modeling Language for Mathematical Programming (2012). Available from: http://www.ampl.com. Cited 10 Feb 2017
  2. 2.
    Burkard, R., Dell’Amico, M., Martello, S.: Assignment Problems. Society for Industrial and Applied Mathematics, Philadelphia (2009)Google Scholar
  3. 3.
    Cerdeira, J.O., Cruz, M., Moura, A.: A Routing/Assignment Problem in Garden Maintenance Services. In: Almeida, J.P., Oliveira, J.F., Pinto, A. (eds.) Operational Research, IO 2013 - XVI Congress of APDIO, Bragança, June 3–5, 2013. CIM Series in Mathematical Sciences, vol. 4, pp. 145–155, Springer, Berlin (2015)Google Scholar
  4. 4.
    Clarke, G.,Wright, J.W.: Scheduling of vehicles from a central depot to a number of delivery points. Oper. Res. 169(4), 568–581 (1964)Google Scholar
  5. 5.
    Desaulniers, G., Madsen, O.B.G., Ropke, S.: Vehicle routing problems with time windows. In: Toth, P., Vigo, D. (eds.) Vehicle Routing: Problems, Methods, and Applications, 2nd edn. MOS-SIAM Series on Optimization, pp. 119–159, SIAM, Philadelphia (2014)Google Scholar
  6. 6.
    Dolan, E.: The NEOS Server 4.0 Administrative Guide. Mathematics and Computer Science Division, Argonne National Laboratory (2001)Google Scholar
  7. 7.
    Gurobi Optimization, Inc.: Gurobi Optimizer Reference Manual, 2015. Available from: http://www.gurobi.com. Cited 10 Feb 2017
  8. 8.
    Hurink, J., Jurisch, B., Thole, M.: Tabu search for the job-shop scheduling problem with multi-purpose machines. Oper. Res. Spektrum 15(4), 205–215 (1994)MathSciNetCrossRefzbMATHGoogle Scholar
  9. 9.
    Manne, A.: On the job shop scheduling problem. Oper. Res. 8, 219–223 (1960)MathSciNetCrossRefGoogle Scholar
  10. 10.
    Nash, A., Sofer, A.: Linear and Nonlinear Programming. McGraw-Hill, New York (1996)Google Scholar
  11. 11.
    Pinedo, L.M.: Planning and Scheduling in Manufacturing Services. Springer, New York (2005)zbMATHGoogle Scholar
  12. 12.
    Ralphs, T.K., Kopman, L., Pulleyblank, W.R., Trotter, L.E.: On the capacitated vehicle routing problem. Math. Program. 94, 343–359 (2003)MathSciNetCrossRefzbMATHGoogle Scholar
  13. 13.
    Toth, P., Vigo, D.: The Vehicle Routing Problem. SIAM Monographs on Discrete Mathematics and Applications, Philadelphia (2002)CrossRefzbMATHGoogle Scholar

Copyright information

© Springer International Publishing AG, part of Springer Nature 2017

Authors and Affiliations

  • Manuel Cruz
    • 1
  • Pedro Freitas
    • 2
  • João Nuno Tavares
    • 3
  1. 1.LEMAPolytechnic of PortoPortoPortugal
  2. 2.Group of Mathematical PhysicsUniversity of LisbonLisbonPortugal
  3. 3.CMUPUniversity of PortoPortoPortugal

Personalised recommendations