Abstract
Whether the arrangement of the space maintenance mission is reasonable directly affects the work efficiency of the space mission and the work intensity of the astronauts. Aiming at the problem of lack of historical data, small sample size and non-repetitive task, based on the ground experimental data, the motion and time study on space maintenance mission is discussed. Motion study is processed base on motions and their objects. Forty one motion codes which are suitable for space maintenance mission are formulated. And these motions are classified. Based on time series, moment estimation method and Wilcoxon signed rank test respectively, three methods are proposed to determine observation time of motions and its accuracy. Taking a ground experiment as an example, the method can calculate all observation time of motions. And this can be the foundation for the calculation and forecast of the time of a space maintenance mission.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Teng, X., Chen, Q.: Research on strategies of on-orbit maintenance in foreign space stations and its enlightenments. Space Med. Med. Eng. 25(6), 475–478 (2012). (in Chinese)
Zhu, Y.: Lessons learned from ten-year construction of international space station. Spacecr Eng 19(1), 50–59 (2010). (in Chinese)
Fan, W.: Study on system characteristics of international space station. Spacecr. Eng. 21(2), 94–100 (2012). (in Chinese)
Jiao, J., Tseng, M.M.: A pragmatic approach to product costing based on standard time estimation. J. Syst. Sci. Syst. Eng. 19(2), 738–755 (2001). (in Chinese)
Christmansson, M., Falck, A.C., Amprazis, J., et al.: Modified method time measurements for ergonomic planning of production systems in the manufacturing industry. Int. J. Prod. Res. 38(17), 4051–4059 (2000)
Laurig, W., Kühn, F.M., Schoo, K.C.: An approach to assessing motor workload in assembly tasks by the use of predetermined-motion-time systems. Appl. Ergon. 16(2), 119–125 (1985)
Nakayama, S.I., Sakai, R.: An evaluation of work performance using a work achievement quotient. Int. J. Prod. Res. 23(5), 879–885 (1985)
Nakayama, S.I., Nakayama, K.I., Nakayama, H.: A study on setting standard time using work achievement quotient. J. Int. J. Prod. Res. 40(15), 3945–3953 (2002)
Zhang, W., Xia, Q.: Study on design and verification method of space station maintainability. J. Manned Spacefl. 20(2), 134–138 (2014). (in Chinese)
Baltagi, B.H.: Econometrics. Springer, Berlin (2008)
GB/T 4882-2001: Statistical interpretation of data-Normality tests (2001)
Acknowledgments
This paper is supported by Beijing Municipal Science & Technology Commission (Grant No. D161100000116002) and the foundation of National Key Laboratory of Human Factors Engineering (Grant No. SYFD18061610).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG
About this paper
Cite this paper
Qiu, H., Fang, W., Wang, L., Wang, B., Guo, B. (2018). Motion and Time Study on Space Maintenance Mission. In: Stanton, N. (eds) Advances in Human Aspects of Transportation. AHFE 2017. Advances in Intelligent Systems and Computing, vol 597. Springer, Cham. https://doi.org/10.1007/978-3-319-60441-1_13
Download citation
DOI: https://doi.org/10.1007/978-3-319-60441-1_13
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-60440-4
Online ISBN: 978-3-319-60441-1
eBook Packages: EngineeringEngineering (R0)