A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)

  • Conference paper
  • First Online:
Operations Research Proceedings 2016

Part of the book series: Operations Research Proceedings ((ORP))

Abstract

Multi-Mode Resource-Constrained Multi-Project Scheduling Problems (MRCMPSP) with large solution search spaces cannot be optimized in an acceptable computation time. In this paper, we have focused on decomposition strategies for such large scale problems. Based on literature review a time-based decomposition approach was adopted for the present problem. With time-based decomposition approaches a schedule is divided into several time periods. All activities in a time period describe an independent problem, termed as a sub-problem. Due to the independent optimization of these sub-problems project information regarding the relationships among activities in different time periods is not considered. This loss of information has a negative impact on the overall solution quality. We developed a decomposition strategy to improve the interactions between the sub-problems for a better target performance while reducing the computation time. Based on an initial solution the sub-problems are created and sequentially optimized in a concept similar to rolling horizon heuristics. We introduce a transition stage with a constant and a variable component at the end of each partial schedule to improve the interactions among sub-problems and thus taking the volatile nature of the examined problems into account. In comparison, our approach proved to provide significant improvements in runtime and target performance.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Angelidis, E., Bohn, D., Rose, O., Carl, S.: Simulation-based optimization for complex assembly lines with workforce constraints. Simulation in Produktion und Logistik (2013)

    Google Scholar 

  2. Blazewicz, J., Lenstra, J., Kan, A.: Scheduling subject to resource constraints: classification and complexity. Discrete Appl. Math. 5(1), 11–24 (1983)

    Article  Google Scholar 

  3. Can, A., Ulusoy, G.: Multi-project scheduling with two-stage decomposition. Ann. Oper. Res. 217(1), 95–116 (2014)

    Article  Google Scholar 

  4. Hartmann, S., Briskorn, D.: A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207, 1–14 (2010)

    Article  Google Scholar 

  5. Kolisch, R., Padman, R.: An integrated survey of deterministic project scheduling. Omega 29(3), 249–272 (2001)

    Article  Google Scholar 

  6. Ovacik, I.M., Uzsoy, R.: Decomposition Methods for Complex Factory Scheduling Problems. Springer Science & Business Media (1997)

    Google Scholar 

  7. Toffolo, T., Santos, H.G., Carvalho, M.A.M., Soares, J.A.: An integer programming approach to the multimode resource-constrained multiproject scheduling problem. J. Sched. 19(3), 295–307 (2016)

    Google Scholar 

  8. Wauters, T., Kinable, J., Smet, P., Vancroonenburg, W., Berghe, G.V., Verstichel, J.: The multi-mode resource-constrained multi-project scheduling problem. J. Sched. 19(3), 271–283 (2016)

    Google Scholar 

Download references

Acknowledgements

The presented work is a result of the research project Simulationsbasierte dynamische Heuristik zur verteilten Optimierung komplexer Mehrziel-Multiprojekt-Multiressourcen-Produktionsprozesse (Founded by the Deutsche Forschungsgemeinschaft (DFG), Duration 04/2014-03/2017). The authors would like to thank Evangelos Angelidis and Daniel Bohn for providing the software SBOP and the constructive discussions.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mathias Kühn .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG

About this paper

Cite this paper

Kühn, M., Dirkmann, S., Völker, M., Schmidt, T. (2018). A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP) . In: Fink, A., Fügenschuh, A., Geiger, M. (eds) Operations Research Proceedings 2016. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-319-55702-1_69

Download citation

Publish with us

Policies and ethics