Understanding and Modelling a Highly Ductile 25+ Years Old Active-Passive Landslide at Ok Tedi Mine in Papua New Guinea

  • Neil BarEmail author
  • Norbert Baczynski
Conference paper

Abstract

Open image in new window The Ok Tedi Copper-Gold Mine is located in a rugged, mountainous region of the Western Province of Papua New Guinea that receives exceptionally high rainfall and is prone to seismic activity. Geologic and geotechnical conditions in the region are also complex and often unfavorable and contribute to slope instability and landslide activity. Very few suitable areas exist around the mine for the construction of infrastructure facilities. Most of the existing infrastructure is located on terraced areas developed by cut-and-fill earthworks. This paper describes the most recent efforts undertaken in attempt to model and understand a highly ductile active-passive landslide that has deformed in the order of 30 m on New York Ridge in the northern part of Ok Tedi Mine for over 25 years.

Keywords

Active-passive landslides Slope stability Numerical modelling 

Notes

Acknowledgements

The authors acknowledge the efforts of Dr. John Read, Richard Mould, John Braybrooke, Simon Thomas, Robert Parker, Jason Elemunop and the late Dr Barry McMahon for their contributions to the New York Ridge project over the years.

References

  1. Baczynski NRP, Sheppard IK, Smith KJ, Simbina P, Sakail R (2008) Toppling slope failure: predicted versus actual—Ok Tedi, PNG. In: Proceedings of 1st southern hemisphere international rock mechanics symposium (SHIRMS), Perth, Australia, Australian Centre for GeomechanicsGoogle Scholar
  2. Baczynski NRP (2012) Ok Tedi Mine PNG. New York Mine Infrastructure Relocation Geotechnical Review, Internal OTML Report dated 27 April 2012, 32pGoogle Scholar
  3. Baczynski NRP (2014) Ok Tedi Mine PNG. New York Ridge Geotechnical Review, Internal OTML Report dated 20 Aug 2016, 2092pGoogle Scholar
  4. Bar N, Kuira P, Semi J (2014) Managing risk associated with erosion-driven slope instabilities with ground support and surface water management in a high rainfall environment at Ok Tedi Copper-Gold Mine. In: Mastering complex projects conference 2014, Melbourne. ACT, Australia, Engineers Australia, pp 191–202, 25–26 Nov 2014Google Scholar
  5. Bar N, Parker R, Thomas SJ (2016) Managing landslide risks associated with erosion-driven slope instabilities using near real-time deformation monitoring systems. In: ISRM international symposium on rock mechanics & rock engineering: from the past to the future (EUROCK 2016), Cappadocia, Turkey, 6p, 29–31 Aug 2016Google Scholar
  6. McMahon BK, Read JRL (1989) Review of Vancouver ridge landslide. Internal OTML report by Dames & Moore and Golder Associates Inc., dated 21 Sept 1989, 38pGoogle Scholar
  7. Parker R, Bar N, Kuira P, Semi J (2015) Erosion-driven slope instabilities. The AusIMM Bulletin, June 2015 edition, Melbourne, Australia. Retrieved 19 July 2016 from https://www.ausimmbulletin.com/feature/erosion-driven-slope-instabilities/
  8. Read JRL, Maconochie AP (1992) The Vancouver Ridge landslide, Ok Tedi Mine, Papua New Guinea. In: Proceedings of 6th international symposium on landslides (ed. DH Bell), Christchurch, New Zealand, Balkema, Rotterdam, pp 1317–1321Google Scholar

Copyright information

© Springer International Publishing AG 2017

Authors and Affiliations

  1. 1.Gecko Geotechnics Pty Ltd.CairnsAustralia
  2. 2.Prime Geotechnics Pty Ltd.BrisbaneAustralia

Personalised recommendations