Abstract
In this paper a finite planning horizon, production–inventory model with rework, is considered. During the production process defective items are produced. These items, after the end of the production process, are repaired and converted into items of perfect quality. The demand for the item is assumed to be time varying. The objective is the determination of the production–reworking schedule that minimizes the total cost over the planning horizon. A procedure is proposed for the determination of such schedule.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsReferences
F.W. Harris, How many parts to make at once. Fact. Mag. Manage. 10, 135–136, 152 (1913)
M.J. Rosenblatt, H.L. Lee, Economic production cycles with imperfect production processes. IIE Trans. 18, 48–55 (1986)
M. Hariga, M. Ben-Daya, Note: the economic manufacturing lot-sizing problem with imperfect production processes: bounds and optimal solutions. Nav. Res. Log. 45, 423–433 (1998)
I. Moon, B.C. Giri, K. Choi, Economic lot scheduling problem with imperfect production processes and setup times. J. Oper. Res. Soc. 53, 620–629 (2002)
C.H. Wang, Integrated production and product inspection policy for a deteriorating production system. Int. J. Prod. Econ. 95, 123–134 (2005)
S.S. Sana, S.K. Goyal, K. Chaudhuri, An imperfect production process in a volume flexible inventory model. Int. J. Prod. Econ. 105, 548–559 (2007)
L.E. Cardenas-Barron, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput. Ind. Eng. 57, 1105–1113 (2009)
P.A. Hayek, M.K. Salameh, Production lot sizing with the reworking of imperfect quality item produced. Prod. Plan. Control. 12, 584–590 (2001)
Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Eng. Optim. 35, 427–437 (2003)
A.M.M. Jamal, B.R. Sarker, S. Mondal, Optimal manufacturing batch size with rework process at a single stage production system. Comput. Ind. Eng. 47, 77–89 (2004)
L.E. Cardenas–Barron, Optimal manufacturing batch size with rework in a single–stage production system–a simple derivation. Comput. Ind. Eng. 55, 758–765 (2008)
P. Biswas, B. Sarker, Optimal batch quantity models for a lean production system with in-cycle rework and scrap. Int. J. Prod. Res. 46, 6585–6610 (2008)
Y.S.P. Chiu, K.K. Chen, F.T. Cheng, M.F. Wu, Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown. Comput. Math. Appl. 59, 919–932 (2010)
C.J. Chung, G.A. Widyadana, H.M. Wee, Economic production quantity model for deteriorating inventory with random machine unavailability and shortage. Int. J. Prod. Res. 49, 883–902 (2011)
H.M. Wee, W.T. Wang, P.C. Yang, A production quantity model for imperfect quality items with shortage and screening constraint. Int. J. Prod. Res. 51, 1869–1884 (2013)
A.H. Tai, Economic production quantity models for deteriorating/imperfect products and service with rework. Comput. Ind. Eng. 66, 879–888 (2013)
B. Pal, S.S. Sana, K. Chaudhuri, Maximising profits for an EPQ model with unreliable machine and rework of random defective items. Int. J. Syst. Sci. 44, 582–594 (2013)
B. Sarkar, L.E. Cardenas–Barron, M. Sarkar, M.L. Singgih, An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J. Manuf. Syst. 33, 423–435 (2014)
C.K. Sivashankari, S. Panayappan, Production inventory model with reworking of imperfect production, scrap and shortages. Int. J. Manag. Sci. Eng. Manag. 9, 9–20 (2014)
E.A. Silver, D.F. Pyke, R. Peterson, Inventory Management and Production Planning and Scheduling (Wiley, New York, 1998
Z.T. Balkhi, On a finite production lot size inventory model for deteriorating items: an optimal solution. Eur. J. Oper. Res. 132, 210–223 (2001)
S. Sana, S.K. Goyal, K.S. Chaudhuri, Production–inventory model for a deteriorating item with trended demand and shortages. Eur. J. Oper. Res. 157, 357–371 (2004)
A. Roy, S. Kar, M. Maiti, Volume flexible production-policy for randomly deteriorating item with trended demand and shortages. Int. J. Prod. Econ. 128, 188–199 (2010)
H.-L. Yang, A partial backlogging production-inventory lot-size model for deteriorating items with time-varying production and demand rate over a finite time horizon. Int. J. Syst. Sci. 42, 1397–1407 (2011)
L. Benkherouf, D. Boushehri, Optimal policies for a finite-horizon production inventory model. Adv. Oper. Res. Article ID 768929, 16 p. (2012). doi:10.1155/2012/768929
D. Das, M.B. Kar, A. Roy, S. Kar, Two-warehouse production inventory model for a deteriorating item with time-varying demand and shortages: a genetic algorithm with varying population size approach. Optim. Eng. 15, 889–907 (2014)
L. Benkherouf, K. Skouri, I. Konstantaras, Optimal control of production remanufacturing and refurbishing activities in a finite planning horizon inventory system. J. Optim. Theory Appl. 168, 677–698 (2016)
L. Benkherouf, M.A. Omar, Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model. RAIRO Oper. Res. 51 (1), 173–187 (2017)
T.M. Al-Khamis, L. Benkherouf, M.A. Omar, Optimal policies for a finite-horizon batching inventory model. Int. J. Syst. Sci 45, 2196–2202 (2014)
S. Dharmadhikari, J.D. Kumar, Unimodality, convexity, and applications, in Probability and Mathematical Statistics (Academic, Boston, 1988)
H. Rau, B.C. Ouyang, A general and optimal approach for three inventory models with a linear trend in demand. Comput. Ind. Eng. 52, 521–532 (2007)
L. Benkherouf, B.H. Gilding, On a class of optimization problems for finite time horizon models. SIAM J. Control Optim. 48, 993–1030 (2009)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing AG
About this chapter
Cite this chapter
Benkherouf, L., Skouri, K., Konstantaras, I. (2017). Optimal Batch Production with Rework Process for Products with Time-Varying Demand Over Finite Planning Horizon. In: Daras, N., Rassias, T. (eds) Operations Research, Engineering, and Cyber Security. Springer Optimization and Its Applications, vol 113. Springer, Cham. https://doi.org/10.1007/978-3-319-51500-7_3
Download citation
DOI: https://doi.org/10.1007/978-3-319-51500-7_3
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-51498-7
Online ISBN: 978-3-319-51500-7
eBook Packages: Mathematics and StatisticsMathematics and Statistics (R0)