Keywords

1 Introduction

This work aims to analyze factors influencing the flexibility of the production of commercial vehicles and propose a prioritization model for industrial productivity enablement projects. The research was performed in a truck & bus manufacturing plant located in Brazil, which produces vehicles in high-volume/high variety operation under a production concept model in which the suppliers interact directly on the final product assembly line, sharing physical space, responsibilities, and standard control [1].

According to Sheffi [2], organizations are threatened by short product cycles and subglobal supply chains, putting them under pressure to develop a greater capacity to confront risk with some resilience.

In this context, the automotive industry is offering wide range of products, but new models generally require new parts, which in turn, are incorporated and managed in the supply chain, along with parts of vehicles already underway.

In the commercial vehicle sector, i.e.: trucks and buses, the scenario is even more challenging: such market is characterized by high-volume production and high variety, delivering vehicles customized for specific applications, levering the manufacturing operation complexity up to uncontrollable levels.

Naga and Kodali [3] state that the complexity of automotive industry models corresponds to the variety in which the production system is based on the quantity of different platforms, bodies and models produced in their assembly lines. By the other side, complexity of components is caused by the existence of optional features offered to customers, but mainly the impact of product development and supply chain boundary conditions, i.e., one of the factor that causes complexity in carmakers’ manufacturing and supply chain systems is the number of pieces combinations and its management.

Modrak et al. [4] correlate the growth of complexity with performance decrease. Their study indicates that larger variety of products in an automotive plant, higher the effort to deliver high-quality products at the desired time and at low cost.

Slack [5] suggests flexibility as solution for demands of quick responses and product variety in a fierce competition scenario, allowing high-performance manufacturing, with reliability, speed, and low costs. Flexibility results in better design and products developed in competitive contexts with high levels of uncertainty [6].

For those involved on tight schedules, consumer preference constant changes, and high uncertainty, manufacturing flexibility is not only desirable, but also a requirement for organizational survival [7,8,9,10].

Therefore, a question that emerges in this context is: How to evaluate the choice of relevant projects to improve flexibility in the production of commercial vehicles? How to prioritize these improvement projects forward the interests of different areas? There is a need for development of a model to rank and prioritize productivity improvement projects, considering lean thinking, agility, and mass customization, to support company’s managerial decisions.

The next paper sections are as follows: Section “Theoretical Background” comprises the fundamentals of Lean production & Lean administration, Agility, Flexibility, and Mass Customization; Section “Procedures and Techniques” presents the research methodology; Section “Results and discussion” highlights the research results and findings. Finally, at the Section “Conclusions and Remarks”, findings are assessed and discussed, while proposals for additional researches are made.

2 Theoretical Background

The concepts of Lean Thinking, Flexibility, Agility, and Mass Customization are discussed in this topic, while some related literature is also referenced.

Holweg [11] states that the Lean Thinking changed the paradigms of mass production, helped to change the relationship between the automobile industry productivity and quality and created a new way of thinking about operations, focused on waste source detection and elimination.

Intriguingly, Baines et al. [12] claim that Toyota’s Lean manufacturing system is actually an extension of their product development philosophy and not the reverse, but most western manufacturers are focusing their Lean initiatives at operations with few attempts to adopt Lean in design-related activities, what could explain why all too often lean projects add little or no value, even though similar methods work very well at Toyota. Qudrat-Ullah et al. [13] stated that the Lean product development process can successfully be applied to improve the operations of a high variable-low volume product mix business.

Gupta and Buzacott [14] define flexibility as the property to be capable of responding or conforming to changing or new situations. Needs that lead to flexibility are, as per Kara and Kayis [15], related to the market (demand variability, short life cycle of products and technologies, great product variety, increased customization, and reduced delivery times) and/or related to the manufacture process (uncertainties in relation to machines and material in processes shortfalls, change in the delivery time of raw materials, and manpower variations).

Agarwal et al. [16] define agility as the ability of companies to cope with the uncertainties of the market and deliver goods and services with high level of service, concept which is directly related to flexibility and process speed.

Boyton et al. [17] define Mass Customization (MC) as the capacity to produce product variety rapidly and inexpensively, in direct contradiction of the assumption that cost and variety are tradeoffs. MC refers to fast, low cost, and varied production companies, fulfilling a large proportion of consumers through a large variety of products and innovations. As a result, organizations increase process efficiencies in clearly conditions of stable process change.

The concept of mass customization can be approached as a development strategy and production boosted primarily by sales teams and marketing that are in contact with the demands of customized products, bringing and discussing the information for development teams and production enterprises. MC goal is to create individually customized products, with mass production volumes, costs and competitive efficiencies [18].

3 Procedures and Techniques

The methodology used to carry out the present research went through the steps listed below, along an eight-month period (Jul/2015-Mar/2016):

  1. 1.

    Literature analysis, encompassing the conceptual basis of Lean Thinking, Lean Manufacturing, Lean Administration/Lean Office, Flexibility, Agility, and Mass Customization;

  2. 2.

    Research planning and managerial granting, i.e., data collection processes; identification of people to be interviewed, questionnaire development, research proposal submission, negotiation and approval; data analysis and results screening, etc.

  3. 3.

    Semistructured interviews with selected executive managers/directors involved to Operations (Production & Logistics, Quality, Finance, Information Technology, and Sales, Marketing & After-sales), having the following open-ended questions as an interview basis (C1 questionnaire): How does the company materials’ planning process work?: Is a reduction in production planning horizon feasible? Which are the opportunities and impacts? Would it impact flexibility? Would it cause any impact on costs?: Is a reduction in purchase order planning horizon feasible? Which are the opportunities and impacts? Would it impact flexibility? Would it cause any impact on costs?: What would be the impact to reduce waste and make the supply chain lean?.

  4. 4.

    Interview content compilation, through a content analysis process, in order to get the understanding about the complexity/flexibility managerial perceptions and decisions, and also to identify elements that affect vehicles production flexibility, which were, then, classified as “dimensions” or “factors”;

  5. 5.

    Those elements and their classification were used to develop a closed-ended questionnaire (C2 questionnaire), purposed to validate such elements and to identify correlations among them. This step aims to get a project prioritization matrix to be used by the studied company to establish an implementation plan for production flexibility improvement high-impact projects.

The questions were base on level of importance pair comparisons between elements: each element was compared with each other and respondents would rate them in a 1–9 scale, being: (1) same importance; (3) low importance; (5) mid importance; (7) high importance; and (9) extreme importance;

  1. 1.

    The electronic questionnaire/spreadsheet was presented to the senior executives and, after that, deployed to their staff members, a total of 158 people. 88 responses (55.7%) were received: one VP, six executive managers, ten managers, 20 supervisors, one specialist, one coordinator, and 49 technical staff/engineers;

  2. 2.

    Data was analyzed to rank elements based on respondent perception through Incomplete Pairwise Comparison (IPC), a variation of the Analytic Hierarchy Process (AHP), multicriteria decision method, which allows the comparison of pairs of factors and sort them by relevance, allowing decision-making based on responses that keep the accuracy of the results [19]; and

  3. 3.

    Results from the IPC step were used to define the scope of planning and execution of the suggested projects for flexibility alternatives as a pilot project. The execution of such project would provide a feedback in regards to production flexibility variance through lean thinking.

4 Results and Discussion

Out of the C1 questionnaire, the following elements that affect vehicles production flexibility were identified (Fig. 1):

Fig. 1.
figure 1

Out of the C1 questionnaire

  • Factors: Lean Manufacturing (32.6%), Agility (27.2%), Mass Customization (25.3%), and Lean Office (14.8%).

  • Manufacturing flexibility: supplier’s additional flexibility (FAS), materials frozen sensitivity analysis (ASF) and supplier continuous improvement (MCF).

  • Materials ordering flexibility: ordering value stream analysis (VSM) and high-profitability products (PAL).

Those elements were used to feed the C2 questionnaire and, then, applied, as described in the previous section. For further detailing, Nascimentos’s [20] dissertation shall be accessed.

From such analysis, the following elements were selected/validated: FAS (31.4%), PAL (20.2%), VSM (16.5%), MCF (16.2%), and ASF (15.7%). However, in regards to project prioritization, the sequence and level of agreement were different: MCF (29%), VSM (27%), FAS (23%), ASF (20%), and PAL (1%). Breaking them down, the following lean thinking projects were proposed and submitted for appraisal: (1) Make Product Development Faster; (2) Reduce Ordering Lead Time; and (3) Increase Administrative Service Level.

As it can be seen, project implementation priority is related to administrative/managerial activities, therefore, related to lean office (a.k.a. lean administration). Upon discussion, it was detected that even though the lean office factor had lower priority when compared with lean manufacturing, agility, and mass customization, such response conflicts with proposed projects’ prioritization. Lean office low priority can be understood by the fact that the major focus has, so far, been given to increase value-added value in production environment.

Based on that assumption, the choice to pursue an implementation based on the research’s results was the lean office application project, contained in the analysis of alternative applications of value stream. The rationale to such choice was: (1) several lean production projects were/are developed in the studied company since 2008: therefore, it is a known subject and results have proved their effectiveness. Besides that, the principles of agility are also present in the organization by focusing service tailored to customer needs, the pursuit of satisfaction in specific niches, resulting in time reduction activities, mainly in its supply chain. The mass customization was recently implemented in product development; and (2) the studied company had never tried to analyze/implement lean office techniques.

Implementation counted with the support of Shingijutsu Global Consulting (SGC), a global company specializing in performance increase efficiency in manufacturing, logistics and processes. SGC consultants attended to three kaizen events focused on logistics, production, and administrative processes, in which former performance jeopardizing the company competitiveness.

The results obtained with the implementation of the mapped improvements, discussed with the team and moderated by SGC consultants created the conditions to reduce 30% the firm horizon of order placement, reducing the time-to-market and leading customer to have a higher product value-added perception, levering company’s service level and competitiveness.

5 Final Considerations

The research highlighted the importance of lean manufacturing factors, speed, mass customization, and lean office to improve the flexibility. It also established a model for productivity enablement projects ratting and prioritization, based on managers and technical staff perception.

Even though the company started lean implementation in 2008, it was, since then, focused on manufacturing activities. The initiation of lean office approach has proven to be able to unveil hidden waste-avoidance opportunities, uplifting performance in time-to-market, reducing overall manufacturing throughput time and planning horizon, which levered production flexibility.

Even though results are preliminary (complete implementation is still ongoing), favorable impacts are already perceived by senior managers. Future researches are to monitor results from now on and, upon adhering to actual trend, should be applied to other products and plants.