Skip to main content

Kaizen Control Phase Models: Activities and Benefits

  • Chapter
  • First Online:
Kaizen Planning, Implementing and Controlling

Abstract

Through the past chapters, we have discussed Kaizen implementation in its three phases—planning, execution, and control—and its impact on different Kaizen benefits (economic, competitive, and for human resources). Likewise, while Chap. 11 has assessed the impact of the Kaizen planning phase (and activities) on these benefits, Chap. 12 focused on the relationship between Kaizen execution phase (and activities) and the same Kaizen advantages. Therefore, in this last chapter, we still propose three structural equation models. However, they assess the impact of the Kaizen control phase on Kaizen benefits obtained by Mexican manufacturing companies. As in Chaps. 11 and 12, the first two models include latent variables associated with Kaizen control activities, whilst the third model integrates these latent variables into a single one.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Springer International Publishing AG

About this chapter

Cite this chapter

García-Alcaraz, J.L., Oropesa-Vento, M., Maldonado-Macías, A.A. (2017). Kaizen Control Phase Models: Activities and Benefits. In: Kaizen Planning, Implementing and Controlling. Management and Industrial Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-47747-3_13

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-47747-3_13

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-47746-6

  • Online ISBN: 978-3-319-47747-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics