Abstract
The paper presents selected issues in the area of modelling a complex technical system structure. We presented the main types of a real technical system reservation. We showed selected proposals of a component redundancy description. We presented a black-box model of the system and described our own concept of qualitative-quantitative analysis of the complex technical system component importance. We also showed a possibility of applying the AHP method to a multi-criteria importance analysis. Some research achievements in this area and propositions for further development of a multi-criteria component analysis have been shown.
Keywords
- Importance analysis
- Complex system
- Human-machine interfaces
- Machinery
- AHP
- Expert opinion
- Importance criteria
- Multicriteria analysis
This is a preview of subscription content, access via your institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Zolkiewski, S., Pioskowik D.: Robot control and online programming by human gestures using a kinect motion sensor. Advances in Intelligent Systems and Computing, Vol. 275. New Perspectives in Information Systems and Technologies. 593-605 (2014)
Zolkiewski, S.: Diagnostics and transversal vibrations control of rotating beam by means of Campbell diagrams. Key Engineering Materials, Vol. 588, 91-100. doi:10.4028/www.scientific.net/KEM.588.91 (2014)
Jaźwiński, J., Smalko, Z.: Rozważania na temat właściwości systemów nadmiarowych. Okrętownictwo i Oceanotechnika. WUPS, Szczecin (2006)
Chybowski, L.: Ważność elementów w strukturze złożonych systemów technicznych. ITE-PIB, Radom – Szczecin (2014)
Chybowski, L.: Application of External Events Vectors for Defining Reliability Structure of Fishing Vessels power, Propulsion and Technological Plant. PJoES, Vol. 18, No. 2A, 45–50 (2009)
Chybowski L., Zolkiewski S.:,Basic reliability structures of complex technical systems. New Contributions in Information Systems and Technologies. Advances in Intelligent Systems and Computing, Volume 354, Springer International Publishing, 333-342, doi: 10.1007/978-3-319-16528-8_31 (2015)
Karanta, I.: Importance measures for the dynamic flowgraph methodology. CHARISMA Project. Research report VTT-R-00525-11, Helsinki. (2011) http://www.vtt.fi/inf/julkaisut/muut/2011/VTT-R-00525-11.pdf [access: 01.06.2015]
Smalko, Z., Jaźwiński, J.: Domyślne nadmiary systemu działaniowego statku powietrznego. XXXII Zimowa Szkoła Niezawodności, KBM PAN, Szczyrk, 319–330 (2004)
The Juran’s Quality Handbook. Juran, M.J., Godfrey, A.B. (Eds.). Ed. V, McGraw-Hill (1999)
Woropay, M.: Metoda budowy wielopoziomowych systemów do badania niezawodności z elementów o wyznaczonej a piori istotności. Rozprawy nr 18. ATR, Bydgoszcz (1983)
Koziolek, S., Derlukiewicz, D., Ptak, M.: Design Process Innovation of Mechanical Objects with the Use of Design for Six Sigma Methodology. Solid State Phenomena., vol. 165, 274-279, doi: 10.4028/www.scientific.net/SSP.165.274 (2010)
Gawdzińska, K., Chybowski, L., Przetakiewicz, W.: Proper matrix-reinforcement bonding in cast metal matrix composites as a factor of their good quality. Archives of Civil and Mechanical Engineering, doi 10.1016/j.acme.2015.11.004 (2015)
Zolkiewski, S., Testing composite materials connected in bolt joints. Journal of Vibroengineering 13, 4 (2011) 817-822.
Chybowski, L., Laskowski, R., Gawdzińska, K.: An overview of systems supplying water into the combustion chamber of diesel engines to decrease the amount of nitrogen oxides in exhaust gas. Journal of Marine Science and Technology, Vol. 20, No. 3, Springer Japan, 393-405, doi: 10.1007/s00773-015-0303-8 (2015)
Espiritu, J.F., Coit, d.W., Prakash, U.: Component criticality importance measures for the power industry. Electric Power Systems Research 77, 407–420 (2007)
Brandowski, A., Grabski, F.: Zbiory rozmyte i prawdopodobieństwo subiektywne w zagadnieniach estymacji parametrów niezawodności i bezpieczeństwa. Teoretyczne podstawy badań niezawodności i bezpieczeństwa. T 2. ITWL, Warszawa, 49–58 (2001)
DeGroot, M.H.: Optymalne decyzje statystyczne. PWN, Warszawa (1981)
Laskowski, R., Chybowski, L., Gawdzińska, K.: An engine room simulator as a tool for environmental education of marine engineers. New Contributions in Information Systems and Technologies. Advances in Intelligent Systems and Computing, Volume 354, Springer International Publishing 311-322, doi: 10.1007/978-3-319-16528-8_29 (2015)
Marczyk, J.: A New Theory of Risk and Rating. New tools for surviving in a complex and turbulent economy. Editrice, Uni service, Trento (2011)
Saaty, T.L.: The Analytic Hierarchy Process. New York: McGraw Hill (1980)
Karliński, J., Ptak, M., Działak, P., Rusiński, E.: Strength analysis of bus superstructure according to Regulation No. 66 of UN/ECE. Archives of Civil and Mechanical Engineering, 2014, vol. 14, 342-353, doi: 10.1016/j.acme.2013.12.001 (2014)
Zalewski, R., Szmidt, T.: Application of Special Granular Structures for semi-active damping of lateral beam vibrations. Engineering Structures 65, 13-20 (2014)
Bajkowski, J., M., Zalewski, R.: Transient response analysis of a steel beam with vacuum packed particles. Mechanics Research Communications 60, 1-6 (2014)
Kuo, W., Zhu, X.: Importance measures in reliability, risk, and optimization. Principles and application. John Wiley & Sons, Ltd. (2012)
Gawdzińska, K.: Quality Features of Metal Matrix Composite Castings. Archives of Metallurgy and Materials 58, Issue 3 (2013) 659-662, doi: 10.2478/amm-2013-0051
Pahl, G., Beitz, W.: Nauka Konstruowania. WNT (1984)
Dietrych, J.: System i Konstrukcja. WNT (1985)
Matulja, T., Fafandjel, N., Zamarin, A.: Methodology for Shipyard Production Areas Optimal Layout Design. Journal of Shipbulding, Vol. 60, No. 4, 369-377 (2009)
Saaty, T.: The Analytic Hierarchy Process. McGraw-Hill, Inc. USA, (1980)
Hadjina, M., Fafandjel, N., Matulja. T.: Shipbuilding Production Process Design Methodology Using Computer Simulation. Journal of Shipbulding, Vol. 66, No. 2, 77-91 (2015)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2016 Springer International Publishing Switzerland
About this paper
Cite this paper
Chybowski, L., Gawdzińska, K. (2016). On the Possibilities of Applying the AHP Method to a Multi-criteria Component Importance Analysis of Complex Technical Objects. In: Rocha, Á., Correia, A., Adeli, H., Reis, L., Mendonça Teixeira, M. (eds) New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing, vol 445. Springer, Cham. https://doi.org/10.1007/978-3-319-31307-8_71
Download citation
DOI: https://doi.org/10.1007/978-3-319-31307-8_71
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-31306-1
Online ISBN: 978-3-319-31307-8
eBook Packages: EngineeringEngineering (R0)