Skip to main content

Planning Production and Workforce in a Discrete-Time Financial Model: Optimizing Cash-Flows Released

  • Conference paper
Computational Management Science

Part of the book series: Lecture Notes in Economics and Mathematical Systems ((LNE,volume 682))

Abstract

Production planning interacts with a number of functional aspects within the entire system of a company. Two of those aspects involve workforce and financial planning. In effect, growing production amounts may demand further workforce, which increases financial costs. On the contrary, lower levels of production may decrease workforce needs, while possibly resulting in lower financial incomes. So, there should exist an adequate balance on the production levels such that the cash-flows can generate the highest returns, along the entire financial stream. This suggests that these three elements of the system (production, workforce and cash-flows) are tightly connected, and that they should be planned together. This paper discusses this interaction, proposing a mixed integer linear programming formulation for a general outline of this three elements system. In order to simplify the discussion, while focusing in the interaction, we consider a single-product in a capacitated production process. Decisions involving cash-flows released along the planning horizon are also incorporated, including dividends payments, allowing the system to decide when and how much should be released outwards such that a given sustainability condition or a final outcome condition is met.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Absi, N., Detienne, B., Dauzère-Pérès, S.: Heuristics for the multi-item capacitated lot-sizing problem with lost sales. Comput. Oper. Res. 40(1), 264–272 (2012)

    Article  Google Scholar 

  2. Fisk, J.: An interactive game for production and financial planning. Comput. Oper. Res. 7(3), 157–168 (1980)

    Article  Google Scholar 

  3. Kirka, Ö., Köksalan, M.: An integrated production and financial planning model and an application. IIE Trans. 28, 677–686 (1996)

    Google Scholar 

  4. Loparic, M., Pochet, Y., Wolsey, L.A.: The uncapacitated lot-sizing problem with sales and safety stocks. Math. Program. 89, 487–504 (2001)

    Article  Google Scholar 

  5. Martins, P., Quelhas, A.P.: Workforce planning and financing on a production/capital discrete-time model. International Transactions in Operational Research (2015), in press (DOI: 10.1111/itor.12181)

    Google Scholar 

  6. Muñoz, M.A., Ruiz-Usano, R., Framiñán, E.A.: A mathematical programming model for the integration of aggregate production planning with short-term financial planning. In: Proceedings of the First World Conference on Operations Management (POM 2000), Sevilla (2000)

    Google Scholar 

  7. Pastor, R., Altimiras, J., Mateo, M.: Planning production using mathematical programming: the case of a woodturning company. Comput. Oper. Res. 36(7), 2173–2178 (2009)

    Article  Google Scholar 

  8. Pochet, Y.: Mathematical programming models and formulations for deterministic production planning problems. In: Jünger, M., Naddef, D. (eds.) Computational Combinatorial Optimization. Lecture Notes in Computer Science, vol. 2241, pp. 57–111. Springer, Berlin/Heidelberg (2001)

    Chapter  Google Scholar 

Download references

Acknowledgements

We thank the reviewers for the valuable comments and suggestions. This work was partially supported by FCT (project PEst-OE/MAT/UI0152).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Pedro Martins .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Springer International Publishing Switzerland

About this paper

Cite this paper

Martins, P. (2016). Planning Production and Workforce in a Discrete-Time Financial Model: Optimizing Cash-Flows Released. In: Fonseca, R., Weber, GW., Telhada, J. (eds) Computational Management Science. Lecture Notes in Economics and Mathematical Systems, vol 682. Springer, Cham. https://doi.org/10.1007/978-3-319-20430-7_15

Download citation

Publish with us

Policies and ethics