Skip to main content

Lead Time Prediction Using Simulation in Leather Shoe Manufacturing

  • Conference paper
Afro-European Conference for Industrial Advancement

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 334))

Abstract

The purpose of this study is to acquire lead time prediction on the basis of actual data to optimize it. Most Manufacturing industries experiences problems of lead time prediction. The determination of planning values for manufacturing lead times has been viewed both as a problem of estimating independent, uncontrollable variables, and as a control problem, where emphasis is placed on managing the average lead times to match predetermined norms. Once a new order with specific and known processing requirements enters to manufacturing system, an exact lead time estimate is assigned to it that is based on the manufacturing current status. Thus, the customers of the case company was being influenced by unpredictable lead time. As a result of this, the customers were unable to get the product of shoe on time due to indeterminate and fluctuating lead time. To come +up with acceptable lead time, Monte Carlo and Arena simulation tools were used to analyze optimal lead time. The finding of the tools simulation resulted in fixed lead time and order cycle numbers for the products order over specified periods (what is the final result reported by simulation?)

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Yahia, A.A.E.F.: Time Schedule Preparation By Predicting Production Rate Using Simulation

    Google Scholar 

  2. Arena Professional Reference Guide. Rockwell Software Inc. (2000)

    Google Scholar 

  3. Benkő, J.: Modeling Kanban Systemic Production with Arena Simulator. GépGyártás XLIX(4) (2009)

    Google Scholar 

  4. Bertrand, J.W.M.: The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management 3(2), 79–92 (1983)

    Article  MathSciNet  Google Scholar 

  5. Eilon, S., Chowdhury, I.G.: Due dates in job shop scheduling. International Journal of Production Research 14(2), 223–237 (1976)

    Article  Google Scholar 

  6. Enns, S.T.: A dynamic forecasting model for job shop flow time prediction and tardiness control. International Journal of Production Research 33(5), 1295–1312 (1995)

    Article  MATH  Google Scholar 

  7. Ho, J., Chang, Y.: An integrated MRP and JIT framework. Computers and Industrial Engineering 41, 173–185 (2001)

    Article  Google Scholar 

  8. Hopp, W.J., Sturgis, M.L.R.: Quoting manufacturing due dates subject to a service level constraint. IIE Transactions 32(9), 771–784 (2000)

    Google Scholar 

  9. Moodie, D.: Demand management: The evaluation of price and due date negotiation strategies using simulation. Journal of Production Operations Management Society 8(2), 151–162 (1999)

    Article  Google Scholar 

  10. Nyhuis, P., Wiendahl, H.P.: Logistische Kennlinien, pp. 81–94. Springer, Heidelberg (1999)

    Book  Google Scholar 

  11. Percentile (2006), http://en.wikipedia.org/wiki/Percentile

  12. Harrell, R.: Simulation using ProModel. McGraw-Hill, New York (2003)

    Google Scholar 

  13. Sargent, R.: Validation and Verification of Simulation Models. In: Winter Simulation Conference (1999)

    Google Scholar 

  14. Ragatz, G., Mabert, V.: A framework for the study of due date management in job shops. International Journal of Production Research 22(4), 685–695 (1984)

    Article  Google Scholar 

  15. Ruben, R.A., Mahmoodi, F.: Lead time prediction in unbalanced production systems (November 14, 2010)

    Google Scholar 

  16. Ruben, R.A., Mahmoodi, F.: Lead time prediction in unbalanced production systems. International Journal of Production Systems 38(7), 1711–1729 (2000)

    Article  MATH  Google Scholar 

  17. Chopra, S.: Designing the distribution network in a supply chain, pp. 123–140. Elsevier Science Ltd. (2003)

    Google Scholar 

  18. Smith, M.L., Siedman, A.: Due date selection procedures for job-shop simulation. Computers and Industrial Engineering 7(3), 199–207 (1983)

    Article  Google Scholar 

  19. Smith, M.L., Siedman, A.: Due date selection procedures for job-shop simulation. Computers and Industrial Engineering 7(3), 199–207 (1983)

    Article  Google Scholar 

  20. Tatsiopoulos, I.P., Kingsman, B.G.: Lead time management. European Journal of Operational Research 14(4), 351–358 (1983)

    Article  Google Scholar 

  21. Berlec, T., Starbek, M.: Predicting Order Due Date, doi:10.1007/s13369-012-02791

    Google Scholar 

  22. Veral, E.: Computer simulation of due-date setting in multi-machine job shops. Computers and Industrial Engineering 41(1), 77–94 (2001)

    Article  Google Scholar 

  23. Vig, M.M., Dooley, J.K.: Dynamic rules for due-date assignment. International Journal of Production Research 29(7), 1361–1377 (1991)

    Article  Google Scholar 

  24. Vig, M.M., Dooley, K.J.: Mixing static and dynamic flow time estimates for due date assignment. Journal of Operations Management 11, 67–79 (1993)

    Article  Google Scholar 

  25. Weeks, J.K.: A simulation study of predictable due-dates. Management Science 25(4), 363–373 (1979)

    Article  MATH  Google Scholar 

  26. Wiendahl, H.P.: Load-oriented Manufacturing Control, pp. 37–199. Springer, Berlin (1995)

    Book  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Hermela Solomon .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this paper

Cite this paper

Solomon, H., Jilcha, K., Berhan, E. (2015). Lead Time Prediction Using Simulation in Leather Shoe Manufacturing. In: Abraham, A., Krömer, P., Snasel, V. (eds) Afro-European Conference for Industrial Advancement. Advances in Intelligent Systems and Computing, vol 334. Springer, Cham. https://doi.org/10.1007/978-3-319-13572-4_23

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-13572-4_23

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-13571-7

  • Online ISBN: 978-3-319-13572-4

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics