Abstract
The model leather products manufacturing factory of leather industry development institute (LIDI) suffers from poor performances due to various problems. The purpose of this study is, therefore, to improve the performance of the case company using scheduling techniques. Proper scheduling technique can result in dramatic improvements in layout, utilization, idle time, make span and tardiness reduction. The existing company performance and various another scenarios were analyzed by using different sequencing rules plus Johnson’s and Campbell’s algorithms. The analysis and discussion showed that the feasible scheduling was of flow shop and while product layout was seen most preferable that result in reduction of machine idle time & make span by 3.00 & 4.33 hours respectively. Total flow time was reduced by 82.9% and machine utilization was improved by 16.15% when compared with existing layout. Through production lines 1 or 2 of scenario-2 with the sequence of J1, J2, J3, J4 and J5, the company should make possible arrangements for such improvements.
Keywords
- performance
- scheduling
- manufacturing
- make-span
- leather industry
This is a preview of subscription content, access via your institution.
Buying options
Preview
Unable to display preview. Download preview PDF.
References
Intra health, n.d., performance improvement stages, steps and tools, http://www.intrahealth.org/sst/stage2.html (viewed August 13, 2014)
Gruenberg, T.: Performance Improvement: Towards a method for finding and Prioritizing potential performance improvement areas in manufacturing operations. International Journal of Productivity and Performance Management 53(1), 52–71 (2004)
Cherkos, T.: Performance Analysis and Improvement of Ethiopian Leather Footwear Factories: With Special Reference to Anbessa Shoe S.C. AAU (October 2011)
Sosimi, A., Ogunwolu, F.O., Adegbola, T.: A Makespan Optimization Scheme for NP-Hard Gari Processing Job Scheduling Using Improved Genetic Algorithm. Journal of Industrial Engineering 1(1), 1–5 (2014)
Braun, O.: Single-processor scheduling with time restrictions, University of Applied Sciences Trier (August 2013)
Mancilla, C., Storer, R.H.: Stochastic Sequencing and Scheduling of an Operating Rooms. Theses and Dissertations, Lehigh University, Department of Industrial and Systems Engineering (November 14, 2009)
Leather Industry Development Institute (LIDI), Leather Industry sector development plan, Performance Report 2010–20014, GTP1, Addis Ababa
Benchmark Implementation Plan for the Ethiopian leather products Sector, Pilot Project on Anbessa Shoe Share Company and Peacock Shoe Factory, prepared by ASSC (February 2009)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer International Publishing Switzerland
About this paper
Cite this paper
Habib, A., Jilcha, K., Berhan, E. (2015). Performance Improvement by Scheduling Techniques: A Case of Leather Industry Development Institute. In: Abraham, A., Krömer, P., Snasel, V. (eds) Afro-European Conference for Industrial Advancement. Advances in Intelligent Systems and Computing, vol 334. Springer, Cham. https://doi.org/10.1007/978-3-319-13572-4_21
Download citation
DOI: https://doi.org/10.1007/978-3-319-13572-4_21
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-13571-7
Online ISBN: 978-3-319-13572-4
eBook Packages: EngineeringEngineering (R0)