A Simulation of Project Completion Probability Using Different Probability Distribution Functions

  • Conference paper
Afro-European Conference for Industrial Advancement

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 334))

Abstract

Estimation of time in project that involves several activities requires expert’s knowledge to give an accurate estimation of project duration. In most project, Program Evaluation and Review Technique (PERT) are used to estimate completion time of project with the basic assumption of normality. This assumption is accepted by many scholars without assessing the errors in the result. Thus, this paper examines the validity of this assumption for activities with different probability distribution functions. The effect on the project’s completion time is addressed by considering a single probability distribution for the entire activities of a network and mixed probability distribution functions within the network, using a computer based simulation called ARENA in Villa house construction project. The findings show that the project completion time for activities that follow different probability distribution function do not follow normality.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. AbouRizk, S.M., Halpin, D.W.: Statistical properties of construction duration data. J. Constr. Eng. Manage. 111(4), 525–544 (1992)

    Article  Google Scholar 

  2. Adlakha, V., Kulkarni, V.G.: A classified bibliography of research on stochastic PERT networks. Infor. 27(3), 272–296 (1989)

    MATH  Google Scholar 

  3. Dong-Eun Lee, D.A.-B.: The Probability Distribution of Project Completion Times in Simulation-based Scheduling. KSCE Journal of Civil Engineering 17(4), 638–645 (2013)

    Article  Google Scholar 

  4. Elmaghraby, S.E.: Activity Networks: Project Planning and Control by Network Models. Wiley, New York (1977)

    MATH  Google Scholar 

  5. Fente, J., Knutson, K., Schexnayder, C.: Defining a beta distribution function for construction simulation. In: Proc. 1999 Winter Simulation Conference, pp. 1010–1015. IEEE, Piscataway (1999)

    Google Scholar 

  6. Ang, A.H.-S., Tang, W.H.: Probability concepts in engineering planning and design: Volume I - basic principles. Wiley, New York (1975)

    Google Scholar 

  7. Halpin, D.W., Riggs, L.S.: Planning and analysis of construction operations. Wiley, New York (1992)

    Google Scholar 

  8. Taha, H.A.: Operations Research: An Introduction, 7th edn. Prentice Hall (2010)

    Google Scholar 

  9. Loostsma, F.A.: Network Planning with Stochastic Activity Durations: An Evaluation of PERT. Statistica Neerlandica 20, 43–69 (1966)

    Article  MathSciNet  Google Scholar 

  10. Lu, M., AbouRizk, S.M.: Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management 126(4), 219–226 (2000)

    Article  Google Scholar 

  11. William, J., Cosgrove, W.: Simplifying PERT Network Simulation with ARENA. California Journal of Operations Management 6(1), 61–68 (2008)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Erimas Tesfaye .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this paper

Cite this paper

Tesfaye, E., Girma, K., Berhan, E., Beshah, B. (2015). A Simulation of Project Completion Probability Using Different Probability Distribution Functions. In: Abraham, A., Krömer, P., Snasel, V. (eds) Afro-European Conference for Industrial Advancement. Advances in Intelligent Systems and Computing, vol 334. Springer, Cham. https://doi.org/10.1007/978-3-319-13572-4_11

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-13572-4_11

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-13571-7

  • Online ISBN: 978-3-319-13572-4

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics