Abstract
Safety (S) improvement of industrial installations leans on the optimal allocation of designs that use equipment that is more reliable and testing and maintenance activities to assure a high level of reliability, availability and maintainability (RAM) for their safety-related systems. However, this also requires assigning a certain amount of resources (C) that are usually limited. Therefore, the decision-maker in this context faces in general a multiple-objective optimization problem (MOP) based on RAMS+C criteria where the parameters of design, testing and maintenance act as decision variables. A general framework for such MOP based on RAMS+C criteria was proposed in [1]. There, a number of alternatives were proposed based on the use of a combination of RAMS+S formulation and Genetic Algorithms (GAs) based optimization to solve the problem of testing and maintenance optimization based only on system unavailablity and cost criteria. The results showed the capabilities and limitations of alternatives. Based on them, challenges were identified in this field and guidelines were provided for further research. In [2], a full scope application of RAMS+S based optimization using GAs was reported. Since then, the reliability and risk based optimization of design and operation of equipment and facilities has evolved into a set of technical documents, conference contributions and technical papers published elsewhere. Many of them have already addressed to some extent the effect of both random and epistemic uncertainties within this reliability and risk informed decision-making framework. This paper discusses the importance of appropriate formulation, treatment and analysis of model and parameter uncertainties in reliability and risk informed decision-making. It faces on how treatment and analysis of uncertainties should be integrated within an approach for evaluation of reliability and risk impact of safety issues, i.e. equipment design, operational requirements, etc. The approach would consist of modeling, assessment and analysis of the safety concern, which is intended to be used within an optimization context to support the decision-making on the most effective safety requirements. The paper focuses on Reliability and Risk of Nuclear Installations, where particular attention is paid to address the effect of uncertainties in the reliability and risk informed optimization of testing and maintenance of safety related equipment. Similar challenges can be observed for many other complex installations, such as energy generation and distributions, process industry, aeronautics, etc.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Martorell S, Sánchez A, Carlos S, Serradell V (2004) Alternatives and challenges in optimizing industrial safety using genetic algorithms. Reliab Eng Syst Saf 86(1):25–38
Martorell S, Villanueva JF, Carlos S, Nebot Y, Sánchez A, Pitarch JL, Serradell V (2005) RAMS+C informed decision-making with application to multi-objective optimization of technical specifications and maintenance using genetic algorithms. Reliab Eng Syst Saf 87(1):65–75
RG 1.174 (2011) An approach for using probabilistic risk assessment in risk-informed decisions on plant-specific changes to the licensing basis, Revision 2, USNRC
NUREG 1855 (2009) Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking, Vol 1, USNRC (see also NUREG 1855 Draft Report, Revision 1, for Comment March 2013)
NUREG/CR-6141 (1995) Handbook of methods for risk-based analyses of technical specifications, USNRC
NUREG-0800 (2007) Review of risk information used to support permanent plant-specific changes to the licensing basis: general guidance, Section 19.2, USNRC
RG 1.177 (2011) An approach for plant-specific, risk-informed decision making: technical specifications, Revision 1, USNRC
RG 1.200 (2009) An approach for determining the technical adequacy of probabilistic risk assessment results for risk-informed activities, Revision 2, USNRC
RG 1.201 (2005) Guidance for categorizing structures, systems, and components in nuclear power plants according to their safety significance, Revision 1, USNRC
Cepin M (2005) Analysis of truncation limit in probabilistic safety assessment. Reliab Eng Syst Saf 87:395–403
Martorell S, Sánchez A, Carlos S (2007) A tolerance interval based approach to address uncertainty for RAMS+C optimization. Reliab Eng Syst Saf 92:408–422
Martorell S, Sánchez A, Villanueva JF, Carlos S, Serradell V (2008) A multi-objective genetic algorithm for RAMS+C optimization with uncertain decision variables. In: Proceedings of IMechE, Vol 222 Part O: J Risk Reliab. JRR140. IMechE 2008, pp 153–160
Martorell S, Villanueva JF, Nebot Y, Carlos S, Serradell V (2004) Current trends in risk-informed changes to limiting conditions for operation. In: Proceedings of 15th European safety and reliability conference (ESREL 2004), Berlin
Sánchez A, Carlos S, Martorell S, Villanueva JF (2009) Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization. Reliab Eng Syst Saf 94:22–32
Smith CL, Knudsen JK, Calley MB (1999) Calculating and addressing uncertainty for risk-based allowable outage times. Reliab Eng Syst Saf 66:41–47
Volkanovski A, Cepin M (2011) Implication of PSA uncertainties on risk-informed decision making. Nucl Eng Des 241:1108–1113
EPRI Report (2012) Practical guidance on the use of pra in risk-informed applications with a focus on the treatment of uncertainty. EPRI-1026511, Draft report, August 2012
EPRI-1016737 (2008) Treatment of parameter and model uncertainty for probabilistic risk assessments. EPRI, Palo Alto
Martorell S, Villamizar M, Villanueva JF, Carlos S, Sanchez AI (2010) Risk-informed decision-making on changes to allowed outage times addressing uncertainties. In: Proceedings of European safety and reliability conference (ESREL 2010), pp 2278–2286
Martorell S, Villamizar M, Villanueva JF, Carlos S, Sanchez AI (2011) Importance analysis in risk-informed decision-making of changes to allowed outage times addressing uncertainties. In: Proceedings of European safety and reliability conference (ESREL 2011), pp 2143–2151
Martorell S, Villamizar M, Villanueva JF, Serradell V, Sanchez AI (2009) Addressing uncertainties in risk-informed decision-making of changes to nuclear power plant technical specifications. In: Proceedings of European safety and reliability conference (ESREL 2009), pp 353–359
Kim IS, Martorell S, Vesely WE, Samanta PK (1992) Quantitative evaluation of surveillance test intervals including test-caused risks. NUREG/CR-5775, BNLNUREG-52296, Feburary 1992
Kim IS, Martorell SA, Vesely WE, Samanta PK (1994) Risk analysis of surveillance requirements including their adverse effects. Reliab Eng Syst Saf 45(3):225–234
Aven T (2010) On the use of uncertainty importance measures in reliability and risk analysis. Reliab Eng Syst Saf 95(2010):127–133
Borgonovo E, Apostolakis GE, Tarantola S, Saltelli A (2003) Comparison of global sensitivity analysis techniques and importance measures in probabilistic safety assessment. Reliab Eng Syst Saf 79(2):175–185
Torres-Echeverria AC, Martorell S, Thompson HA (2009) Modelling and optimization of proof testing policies for safety instrumented systems. Reliab Eng Syst Saf 94(4):838–854
International Electrotechnical Commission (1998–2005) IEC 61508. Functional safety of electri-cal/electronic/programmable electronic safety-related systems. Parts 1–7. Geneva, Switzerland
International Electrotechnical Commission (2003) IEC 61511 Functional safety–safety instrumented systems for the process industry sector. Parts 1–3. Switzerland
Reinert JM, Apostolakis GE (2006) Including model uncertainty in risk-informed decision making. Ann Nucl Energy 33:354–369
Villanueva JF, Sanchez AI, Carlos S, Martorell S (2008) Genetic algorithm-based optimization of testing and maintenance under uncertain unavailability and cost estimation: a survey of strategies for harmonizing evolution and accuracy. Reliab Eng Syst Saf 93(12):1830–1841
Acknowledgments
Authors are grateful to the Spanish Ministry of Science and Innovation for the financial support of this work (Research Project ENE2010-17449).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Martorell, S., Villamizar, M., Martón, I., Sánchez, A., Carlos, S. (2015). New Challenges and Opportunities in Reliability and Risk Based Optimization. In: Greiner, D., Galván, B., Périaux, J., Gauger, N., Giannakoglou, K., Winter, G. (eds) Advances in Evolutionary and Deterministic Methods for Design, Optimization and Control in Engineering and Sciences. Computational Methods in Applied Sciences, vol 36. Springer, Cham. https://doi.org/10.1007/978-3-319-11541-2_28
Download citation
DOI: https://doi.org/10.1007/978-3-319-11541-2_28
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-11540-5
Online ISBN: 978-3-319-11541-2
eBook Packages: EngineeringEngineering (R0)