Advertisement

A MILP Event Based Formulation for a Real-world Multimode RCSP with Generalized Temporal Constraints

  • Tamara Borreguero-Sanchidrián
  • Álvaro García-Sánchez
  • Miguel Ortega-Mier
Conference paper
Part of the Lecture Notes in Management and Industrial Engineering book series (LNMIE)

Abstract

Scheduling is becoming much more important in every industry. However, the standard RCSP usually does not cover all the characteristics of real world problems. In this work, we present an Event Based MILP formulation for a Multimode Resource Constraint Scheduling Problem of direct application for some industries, as aeronautical assembly lines. Taking as a starting point one of the last MILP formulations for standard RCSP, our contribution is to provide a formulation which covers the multimode case and more general temporal constraints than the ones usually referred to in the literature.

Keywords

Scheduling Multimode Event based formulation Temporal constraints MILP 

References

  1. 1.
    Artigues C, Michelon P, Reusser S (2003) Insertion techniques for static and dynamic re-source-constrained project scheduling, Eur J Oper Res 149:249–267Google Scholar
  2. 2.
    Brucker P, Drexl A, Mhring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: Notation, classification, models and methods. Eur J Oper Res 112(1):3–11Google Scholar
  3. 3.
  4. 4.
    Koné O, Artigues C, Lopez P, Mongeau M (2011) Event-based MILP models for resource-constrained project scheduling problems. Comput Oper Res 38(1):3–13Google Scholar

Copyright information

© Springer International Publishing Switzerland 2014

Authors and Affiliations

  • Tamara Borreguero-Sanchidrián
    • 1
  • Álvaro García-Sánchez
    • 1
  • Miguel Ortega-Mier
    • 1
  1. 1.Grupo IOL, Dpto. Ingeniería de Organización, Administración de Empresas y Estadística. ETSIIUPM MadridMadridSpain

Personalised recommendations