Skip to main content

Managing the Risks of a Large-Scale Infrastructure Project: The Case of Spoorzone Delft

  • Chapter
  • First Online:
Infranomics

Part of the book series: Topics in Safety, Risk, Reliability and Quality ((TSRQ,volume 24))

Abstract

Risk management in large-scale infrastructure projects is attracting the attention of academics and practitioners alike. After a brief summary of the theoretical background, this chapter describes how the risk analysis and risk management shapes up in a current large-scale infrastructure project in the Netherlands. The project in question is Spoorzone Delft, which involves the construction of a railway tunnel, the demolition of a railway viaduct, and the realisation of some 1,500 housing units, 20,000 m2 of office space, covered parking lots, bicycle sheds, new civic offices and a ticket hall in a railway station. ProRail and Ontwikkelingsbedrijf Spoorzone Delft B.V. drew up a risk management plan to identify potential risks and to present strategies for controlling or reducing them. It emerged that risks were determined and quantified largely based on subjective estimates. The risk inventories exhibit strong dynamics from quarter to quarter. The findings indicate that it would be sensible to concentrate more closely on the insurability of risks and to differentiate between risks at system level and component level. The academic theory advises a stronger orientation towards flexibility and the identification of options.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Black F, Scholes M (1974) From theory to a new financial product. J Finan 29(8):399–412

    Article  Google Scholar 

  2. Brockner J, Rubin JZ (1985) Entrapment in escalating conflicts: a social psychological analysis. Springer, New York

    Book  Google Scholar 

  3. Commissie Versnelling Besluitvorming Infrastructurele Projecten (Commisie-Elverding) (2008) Sneller en beter. Advies Commissie Versnelling Besluitvorming Infrastructurele Projecten (Faster and Better. Recommendations by the Commission for Accelerating Decision-making in Infrastructural Projects). Ministry of Infrastructure and the Environment, The Hague

    Google Scholar 

  4. Dixit AK, Pindyck RS (1995) The options approach to capital investment. Harvard Bus Rev 73(3):105–116

    Google Scholar 

  5. Flyvbjerg B (2009) Public planning of mega-projects: overestimation of demand and underestimation of costs. In: Priemus H, Flyvbjerg B, van Wee B (eds) Decision-making on mega-projects: cost–benefit analysis, planning and innovation. Edward Elgar, Cheltenham, pp 120–144

    Google Scholar 

  6. Flyvbjerg B (2004) COWI (2004) procedures for dealing with optimism bias in transport planning: guidance document. UK Department for Transport, London

    Google Scholar 

  7. Flyvbjerg B, Bruzelius N, Rothengatter W (2003) Mega-projects and risk: an anatomy of ambition. Cambridge University Press, Cambridge

    Google Scholar 

  8. Huisman, Robert (2010) Risicomanagementplan Projectbeheersing Ontwikkelingsbedrijf Spoorzone Delft (Risk management plan project control Ontwikkelingsbedrijf Spoorzone Delft). OBS, Delft 14 Dec 2010

    Google Scholar 

  9. Janis IL (1982) Groupthink. Psychological studies of policy decisions and fiascos. Houghton Mifflin, Boston

    Google Scholar 

  10. Lovallo D, Kahneman D (2003) Delusions of success: how optimism undermines executives decisions. Harvard Business Review, July: 56–63

    Google Scholar 

  11. Miller R, Floricel S (2005) Understanding risks and shaping large engineering projects. In: Manseau A, Shields R (eds) Building tomorrow: innovation in construction and engineering. Ashgate, Aldershot, pp 101–121

    Google Scholar 

  12. Miller R, Lessard D (2008) Evolving strategy: risk management and the shaping of mega-projects. In: Priemus H, Flyvbjerg B, van Wee B (eds) Decision-making on mega-projects:cost-benefit analysis, planning and innovation. Edward Elgar, Cheltenham, pp 145–172

    Google Scholar 

  13. Nederlands Adviesbureau voor Risicomanagement (2010) Rapportage Onderzoek Spoorzone Project Delft (Report Investigation on the Spoorzone Project, Delft). NAR, Enschede

    Google Scholar 

  14. Nederlandse Spoorwegen (NS) (1988) Toekomstvisie Rail 21 (Rail 21 vision for the future) NS, Utrecht

    Google Scholar 

  15. Priemus H (2004) Delftse Spoorzone: onbetrouwbare overheid (Delftse Spoorzone: unreliable government). Building Business, 6, August: 42–47

    Google Scholar 

  16. Priemus H, Flyvbjerg B, van Wee B (2008) Decision-making on mega-projects: Cost–benefit analysis, planning and innovation. Edward Elgar, Cheltenham

    Book  Google Scholar 

  17. Hoogerwerf J (2011) Risicomanagementplan Spoorzone Delft. Projectbeheersing, ProRail, Delft , 3 Feb

    Google Scholar 

  18. Robert van T (2004) De strijd om een spoortunnel (The struggle around a railway tunnel) Vastgoed 79(1):56–58

    Google Scholar 

  19. Tijdelijke Commissie Infrastructuurprojecten (TCI) (2004) Grote projecten uitvergroot. Een infrastructuur voor besluitvorming (Large projects magnified: an infrastructure for decision-making), Tweede Kamer 2004–2005, 29.283 nos. 5–6 Sdu Uitgevers, The Hague

    Google Scholar 

  20. Trigeorgis L (1996) Real options: managerial flexibility and strategy in resource allocation. MIT Press, Cambridge

    Google Scholar 

  21. Wachs M (1989) When planners lie with numbers. APA J 55(4):476–479

    MathSciNet  Google Scholar 

  22. Wachs M (1990) Ethics and advocacy in forecasting for public policy. Bus Prof Ethics J 9(1&2):141–157

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Hugo Priemus .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Priemus, H. (2014). Managing the Risks of a Large-Scale Infrastructure Project: The Case of Spoorzone Delft. In: Gheorghe, A., Masera, M., Katina, P. (eds) Infranomics. Topics in Safety, Risk, Reliability and Quality, vol 24. Springer, Cham. https://doi.org/10.1007/978-3-319-02493-6_24

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-02493-6_24

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-02492-9

  • Online ISBN: 978-3-319-02493-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics