Abstract
The optimal operation level of a run-off river hydropower plant which receives water from two supply channels is the task in Chapter 21.
Chapter PDF
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Open Access This chapter is licensed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
The images or other third party material in this chapter are included in the chapter's Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the chapter's Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder.
Copyright information
© 2024 The Author(s)
About this chapter
Cite this chapter
Rapp, C. (2024). Optimisation of the operation level at Uppenbornwerk 1. In: Hydraulics in Civil Engineering. Springer, Cham. https://doi.org/10.1007/978-3-031-54860-4_21
Download citation
DOI: https://doi.org/10.1007/978-3-031-54860-4_21
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-031-54859-8
Online ISBN: 978-3-031-54860-4
eBook Packages: EngineeringEngineering (R0)