Abstract
In accordance with the purpose of the study, the stages of the formation of network planning methods taking into account risk factors up to modern technologies, powerfully supported by computer tools for calculations and visualization, are considered in the work. The main approaches to the classification of network models according to various criteria are analyzed and comparative results are obtained. It has been established that even at the present stage, the use of probabilistic and even more so alternative network models is associated with time-consuming routine operations. Microsoft Project and other similar systems support setting time estimates, but their capabilities are severely limited in the case of multicriteria tasks. As for the software for alternative models, we can state its deficiency. The stages of analysis for each task are given in detail and conclusions are drawn. Despite the shortcomings of each type of model, the following statement can be made. When performing the practical part, an estimate was made of the number of steps, calculations, and elementary operations. It has been established that manual optimization by the GERT method is characterized by high time costs. Therefore, the question of software tools for GERT analysis is acute.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Lopez-Alcarria, A., Olivares-Vicente, A., Poza-Vilches, F.: A systematic review of the use of agile methodologies in education to foster sustainability competencies. Sustainability 11(10), 2915 (2019). https://doi.org/10.3390/su11102915
McGee, T.: Going agile? How to reduce your risk of failure. Paper presented at PMI® Global Congress 2014—North America, Phoenix, AZ. Newtown Square, PA: Project Management Institute. Project Management Institute. https://www.pmi.org/learning/library/going-agile-how-reduce-risk-failure-9531. Accessed 26 Sept 2022
Rafeek, M.A., Arbain, A.F., Sudarmilah, E.: Risk mitigation techniques in agile development processes. Int. J. Supply Chain Manage. 8(2), 1123–1127 (2019)
Hofman, M., Grela, G.: Project portfolio risk identification – application of Delphi method. J. Bus. Econ. 6(11), 1857–1867 (2015). https://doi.org/10.12821/ijispm060403
Taroun, A.: Towards a better modelling and assessment of construction risk: Insights from a literature review. Int. J. Project Manage. 32(1), 101–115 (2014). https://doi.org/10.1016/j.ijproman.2013.03.004
Samman, T.A.S.A., Brahemi, R.M.R.A.: Fuzzy pert for project management. Int. J. Adv. Eng. Technol. 7(4), 1150–1159 (2014)
Madhuni, K.U., Siresha, S., Shamkar, N.R.: A new approach for solving fuzzy critical path problem using L-L fuzzy numbers. Appl. Math. Sci. 6(27), 1303–1324 (2012)
Berthod, O., Grothe-Hammer, M., Sydow, J.: Network ethnography: a mixed-method approach for the study of practices in interorganizational settings. Organ. Res. Methods 20(2), 299–323 (2017)
Singh, S.: Project management and strategic objectives of the organization. Univ. J. Industr. Bus. Manage. 5(1), 10–11 (2017). https://doi.org/10.13189/ujibm.2017.050102
Tomomitsu, H.T.A., Carvalho, M.M.D., Moraes, R.D.O.: The evaluation of the relationship between project management and knowledge management: a bibliometric study. Gestão Produção 25(2), 354–369 (2018). https://doi.org/10.1590/0104-530x3150-16
Feldman, M., Worline, M.: The practicality of practice theory. Acad. Manage. Learn. Educ. 15(2), 304–324 (2016). https://doi.org/10.5465/amle.2014.0356
Shrivastava, S.V., Rathod, U.: A risk management framework for distributed agile projects. Inform. Softw. Technol. 85, 1–15 (2017). https://doi.org/10.1016/j.infsof.2016.12.005
Buganová, K., Šimíčková, J.: Risk management in traditional and agile project management. Transp. Res. Procedia 40, 986–993 (2019). https://doi.org/10.1016/j.trpro.2019.07.138
Salama, M.: Event project management. In: Salama, M. (ed.) Risk Management and Agile Project Management, Chapter 4, pp. 73–76. Goodfellow Publishers, Oxford (2021). http://dx.doi.org/10.23912/9781911635734-4781
Kischelewski, B., Richter, J.: Implementing large-scale agile – an analysis of challenges and success factors. In: Proceedings of the 28th European Conference on Information Systems (ECIS): An Online AIS Conference, 15–17 July 2020, Marrakech, Morocco (2020). https://aisel.aisnet.org/ecis2020_rp/176. Accessed 26 Sept 2022
Baudrit, C., Taillandier, F., Tran, T.T.P., Breysse, D.: Uncertainty processing and risk monitoring in construction projects using hierarchical probabilistic relational models. Comput.-Aided Civ. Infrastruct. Eng. 34(2), 97–115 (2019). https://doi.org/10.1111/mice.12391
Panwar, A., Jha, K.N.: A many-objective optimization model for construction scheduling. Constr. Manage. Econ. 37(12), 727–739 (2019). https://doi.org/10.1080/01446193.2019.1590615
Riahi, Y.: Project management: techniques and methodologies. Int. J. Sci. Res. 6(2), 465–469 (2019)
Pradeepa Veerakumari, K., Resmi, R.: Designing optimum plan parameters for continuous sampling plan of type (CSP-2) through GERT analysis. J. Stat. Manage. Syst. 19(2), 303–311 (2016). https://doi.org/10.1080/09720510.2015.1116207
Salama, M.: Risk Management and Agile Project Management, pp. 73–76. Goodfellow Publishers, Oxford (2021). http://dx.doi.org/10.23912/9781911635734-4781
Prasad, V.C.: Compact form of Mason’s gain formula for signal flow graphs. Int. J. Electr. Eng. Educ. 47(4), 393–403 (2010)
Wyrozebski, P.: Research on the needs of methodological support in project management. Organ. Manage. 5(148), 193–213 (2011)
Ali, M.M., Elazouni, A.: Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Constr. Manage. Econ. 27(9), 839–856 (2009). https://doi.org/10.1080/01446190903191764
Leyman, P., Vanhoucke, M.: Payment models and net present value optimization for resource-constrained project scheduling. Comput. Industr. Eng. 91, 139–153 (2016). https://doi.org/10.1016/j.cie.2015.11.008
Klimek, M., Łebkowski, P.: Financial optimisation of the scheduling for the multi-stage project. Bull. Pol. Acad. Sci.: Tech. Sci. 65(6), 899–908 (2017)
Braun, T.: Configurations for interorganizational project networks: the interplay of the PMO and network administrative organization. Proj. Manag. J. 49(2), 1–10 (2018)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2023 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this paper
Cite this paper
Druzhinin, E., Haidabrus, B., Psarov, O., Cheranovskiy, V. (2023). Analysis of Project Implementation Methods and Models Throughout Risk Management. In: Nechyporuk, M., Pavlikov, V., Kritskiy, D. (eds) Integrated Computer Technologies in Mechanical Engineering - 2022. ICTM 2022. Lecture Notes in Networks and Systems, vol 657. Springer, Cham. https://doi.org/10.1007/978-3-031-36201-9_49
Download citation
DOI: https://doi.org/10.1007/978-3-031-36201-9_49
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-031-36200-2
Online ISBN: 978-3-031-36201-9
eBook Packages: EngineeringEngineering (R0)