Abstract
After installation of the instrument, it is necessary that collected monitoring data are verified to ensure that the instruments and data acquisition systems are operating properly. In many cases, verifications can be carried out based on initially collected zero reading after stabilization. However, some instruments required significant poll of data to verify the accuracy and precision of monitored data. These details together with monitoring frequency, monitoring process, data processing, data verification and presentation of monitored data are presented in this chapter. Automatic real-time monitoring system and recent development of data acquisition systems and visualization software are also discussed in this chapter.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Abbreviations
- P :
-
Pressure
- R 1 :
-
Current reading
- R 0 :
-
Initial zero reading obtained from manufacturer’s calibration sheet
- G :
-
Linear calibration factor obtained from manufacturer’s calibration sheet
- P T :
-
Temperature correction
- T 1 :
-
Current temperature
- T 0 :
-
Initial zero temperature
- K :
-
Thermal factor
- P B :
-
Barometric correction
- S 1 :
-
Current barometer
- S 0 :
-
Initial zero barometer
- F :
-
Conversion factor
- CRA:
-
Correction applied by user to account for errors along A axis
- A1:
-
1st guide reading in A axis
- A2:
-
2nd guide reading in A axis (opposite to 1st guide)
- CRB:
-
Correction applied by user to account for errors along B axis
- B1:
-
1st guide reading in B axis
- B2:
-
2nd guide reading in B axis (opposite to B1 guide)
- Dxmax:
-
Vector displacement
- a New :
-
Corrected reading in basic alpha axis
- a 1 :
-
Initial reading in alpha axis
- DELTA_A:
-
Alpha angle spiral – alpha inclinometer
- b New :
-
Corrected reading in basic beta axis (alpha +90deg)
- b 1 :
-
Initial reading in beta axis
- DELTA_B:
-
Beta angle spiral – Beta inclinometer
References
Bo, M. W., & Choa, V. (2004). Reclamation and ground improvement. Thomson Learning.
Bo, M. W., Chu, J., Low, B. K., & Choa, V. (2003). Soil improvement – Prefabricated vertical drain techniques. Thomson Learning.
Dunnicliff, J. (1988). Geotechnical instrumentation for monitoring field performance. Wiley.
Dunnicliff, J., Marr, W. A., & Standing, J. (2012, January). Chapter 94: Principles of geotechnical monitoring. In ICE manual of geotechnical engineering: Volume II (pp. 1363–1377).
Fornos, J. R. (2022). Human role and I & M automation projects. Canadian Geotechniques, 3(1), 65–66.
Kavvadas, Μ. (2012). Design of underground projects (Lecture notes, School of Civil Engineering). NTUA.
Mann, D. C., & Hamilton, D. C. (1990). Micros for embankment monitoring needn’t cost the earth- the Creetown experience. In Geotechnical instrumentation in practice, purpose, performance and interpretation, proceeding of the geotechnical instrumentation in civil engineering projects (pp. 1–24). Institution of Civil Engineers, Thomas Telford.
Mikkelsen, P. E. (1996a). Field instrumentation. In A. K. Turner & R. L. Schuster (Eds.), Landslides investigation and mitigation (Special Report 247) (pp. 278–316). Transportation Research Board, National Research Council.
Mikkelsen, P. E. (1996b). Field instrumentation. In A. K. Turner & R. L. Schuster (Eds.), Subsidence investigation and mitigation (Special Report 247) (pp. 278–316). Transportation Research Board, National Research Council.
Moller, B., Lindholm, O., & Arnekull, S. (1990). Experience of a computerised monitoring system for Landslides. In Geotechnical Instrumentation in practice, purpose, performance and interpretation, proceeding of the geotechnical instrumentation in civil engineering projects (pp. 1–24). Institution of Civil Engineers, Thomas Telford.
Nsubuga, S., Tsakiri, M. & Georgiannou, V. A smart decision tool for the prediction of tunnel crown displacements. Appl Geomat 13 (Suppl 1), 77–91 (2021). https://doi.org/10.1007/s12518-020-00304-9.
Peck, R. B. (1969a). Advantages and limitations of the observational method in applied soil mechanics. Geotechnique, 19(2), 171–187. https://doi.org/10.1680/geot.1969.19.2.171
Peck, R. B. (1969b). Deep excavation and tunneling in soft ground. State-of-the-art report. In Proceedings of the 7th international conference on soil mechanics and foundation engineering, Mexico, pp. 225–290.
Poulous, H. G., Carter, J. P., & Small, J. C. (2001). Foundationa and retaining structures – Research and practice. In Proceedings of the 15th international conference on soil mechanics and geotechnical engineering, Istanbul, Vol. 4. pp. 2527–2606.
Stark, T. D., & Choi, H. (2008). Slope inclinometers for landslides. Landslides, 5(3), 339–350. https://doi.org/10.1007/s10346-008-0126-3
Sudhakar, K., Sekar, B. H. V., & Naik, S. R. (2022). Surge shaft instrumentation and monitoring in Himalayan hydroelectric projects. In A. K. Verma et al. (Eds.), Proceedings of geotechnical challenges in mining, tunneling and underground infrastructures. ICGMTU 2021 (Lecture notes in civil engineering) (Vol. 228). Springer. https://doi.org/10.1007/978-981-16-9770-8_15
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2023 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this chapter
Cite this chapter
Bo, M.W., Barrett, J. (2023). Monitoring, Data Processing, Data Verification and Presentation. In: Geotechnical Instrumentation and Applications. Springer, Cham. https://doi.org/10.1007/978-3-031-34275-2_6
Download citation
DOI: https://doi.org/10.1007/978-3-031-34275-2_6
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-031-34274-5
Online ISBN: 978-3-031-34275-2
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)