Many construction projects end with cost overrun, delay and defects. These undesirable outcomes are particularly disheartening with mega projects. The construction industry has been seeking ways to improve project performance and inter alia, incentive schemes have been used widely as one of the means to induce extra efforts from contracting organisations. In 2007, the Hong Kong Government announced the construction of ten mega projects. Notwithstanding these mega projects have all incorporated certain forms of incentive, delay, substantial cost overruns and quality issues have been reported. The authors observed the following pattern of use of construction incentivization (CI): (i) Most of the CI have targets set on time, cost, quality, and safety, (ii) No clear pattern of how CI are developed, (iii) ‘Carrots’ are used far more often than ‘sticks’, (iv) The use of CI is far more common in public projects than private projects, (v) Most targets are quantitative, and (vi) Choice of CI is rather incidental. Apparently, there are two major shortcomings of the prevailing CI arrangements. First, CI is anchored on motivation theories that are mostly related to individuals; Second, the targets are outcome based and mainly tied with developers’ goals. This outcome-based approach is useful for tasks of high programmability with outcome that can be accurately projected. However, construction tasks, especially those that need innovation, are typically of low programmability with loose outcome predictability. To overcome these shortcomings, this primer suggests that incentivization should aim for effort greater than mere competence and go beyond carrot and stick should be used. It is advocated that integrative incentive should be used and have five functions: (1) Goal Commitment; (2) Expectation Alignment; (3) Information Exchangeability; (4) Risk Efficiency; and (5) Relationship Investment.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Abu-Hijleh, S. F., & Ibbs, C. W. (1989a). Schedule-based construction incentives. Journal of Construction Engineering and Management, 115(3), 430–443.https://doi.org/10.1061/(ASCE)0733-9364(1989)115:3(430)
Acquah, A., Nsiah, T. K., Antie, E. N. A., & Otoo, B. (2021). Literature review on theories of motivation. EPRA International Journal of Economic and Business Review, 9(5), 25–29.
Adams, J. S. (1963). Toward an understanding of inequity. Journal of Abnormal and Social Psychology, 67(5), 422–436. https://doi.org/10.1093/past/96.1.22
Adams, J. S. (1965). Inequity in social exchange. Advances in Experimental Social Psychology, 2, 267–299.
Adams, J. S., & Freedman, S. (1976). Equity theory revisited: Comments and annotated bibliography. Advances in Experimental Social Psychology, 9(C), 43–90. https://doi.org/10.1016/S0065-2601(08)60058-1
Arditi, D., & Yasamis, F. (1998). Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), 361–373. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:5(361)
Back, W. E., Grau, D., & Mejia-Aguilar, G. (2013). Effectiveness evaluation of contract incentives on project performance. International Journal of Construction Education and Research, 9(4), 288–306. https://doi.org/10.1080/15578771.2012.729551
Bandura, A. (1978). The self system in reciprocal determinism. In American Psychologist (Vol. 33, Issue 4, pp. 344–358). https://doi.org/10.1037/0003-066X.33.4.344
Bandura, A. (1982). Self-efficacy mechanism in human agency. American Psychologist, 37(2), 122–147.
Bandura, A. (1993). Perceived self-efficacy-in-cognitive-development-and-functioning. Educational Psychologist, 28(2), 117–148.
Baron, D. P. (1995). Integrated strategy: Market and nonmarket components. California Management Review, 37(2), 47–65.
Bayliss, R., Cheung, S. O., Suen, H. C. H., & Wong, S. P. (2004). Effective partnering tools in construction: A case study on MTRC TKE contract 604 in Hong Kong. International Journal of Project Management, 22(3), 253–263. https://doi.org/10.1016/S0263-7863(03)00069-3
Bootzin, R. R., Epstein, D., & Wood, J. M. (1991). Stimulus control instructions. In Case studies in insomnia (pp. 19–28). Springer.
Boukendour, S., & Hughes, W. (2014). Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), 279–289. https://doi.org/10.1080/01446193.2013.875215
Bresnen, M., & Marshall, N. (2000). Motivation, commitment and the use of incentives in partnerships and alliances. Construction Management and Economics, 18(5), 587–598. https://doi.org/10.1080/014461900407392
Carter, M., & Armenakis, A. (2013). Transformative leadership, relationship quality, an employee performance during continuous incremental organizational change. Journal of Organizational Behavior, 34(7), 942–958.
Chan, D. W. M., Lam, P. T. I., Chan, A. P. C., Wong, J. M. W., & Author, C. (2010). Achieving better performance through target cost contracts—The tale of an underground railway station modification project. Performance Measurement and Management in Facilities Management, 28(5/6), 261–277.
Cheung, S. O., & Chan, K. Y. (2014). Construction Innovations in Hong Kong: A catalogue. City University of Hong Kong.
Cheung, S. O., Wong, W. K., Yiu, T. W., & Pang, H. Y. (2011). Developing a trust inventory for construction contracting. International Journal of Project Management, 29(2), 184–196. https://doi.org/10.1016/j.ijproman.2010.02.007
Cheung, S. O., Yiu, T. W., & Lam, M. C. (2013). Interweaving trust and communication with project performance. Journal of Construction Engineering and Management, 139(8), 941–950. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000681
Cheung, S. O., Wong, W. K., Yiu, T. W., & Pang, H. Y. (2014). Construction dispute research. Springer. https://doi.org/10.1007/978-3-319-04429-3
Cheung, S. O., Zhu, L., & Lee, K. W. (2018). Incentivization and interdependency in construction contracting. Journal of Management in Engineering, 34(3), 1–13. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000601
Eisenhardt, K. M. (1985). Control: Organizational and economic approaches. Management Science, 31(2), 134–149.
Eisenhardt, K. M. (1988). Agency and institutional theory explanations: The case of retail sales compensation. The Academy of Management Journal, 31(3), 488–511.
Flyvbjerg, B. (2017). The oxford handbook of megaproject management. Oxford University Press. https://doi.org/10.1084/jem.20050882
Gibbs, M., Merchant, K., Van Der Stede, W., & Vargus, M. (2009). Performance measure properties and incentive system design. Industrial Relations, 48(2), 237–264.
Gneezy, U., Meier, S., & Rey-Biel, P. (2011). When and why incentives (don’t) work to modify behavior. Journal of Economic Perspectives, 25(4), 191–210. https://doi.org/10.1257/jep.25.4.191
Herten, H. J., & Peeters, W. A. R. (1986). Incentive contracting as a project management tool. In Herten H. J., Peeters W. A. R. (Vol. 4, Issue 1, pp. 34–39). https://doi.org/10.1016/0263-7863(86)90060-8
Hetemi, E., Gemünden, H. G., & Meré, J. O. (2020). Embeddedness and actors’ behaviors in large-scale project life cycle: lessons learned from a high-speed rail project in Spain. Journal of Management in Engineering, 36(6), 05020014. https://doi.org/10.1061/(asce)me.1943-5479.0000849
Herzberg, F. I. (1966). Work and the Nature of Man.
Herzberg, F. I. (1970). Avoiding pain in the organization. Industry Week. Dec, 7.
Herzberg, F. I. (1974). The wise old Turk. Harvard Business Review, 54(5), 70–80.
Holmstrom, B. (1979). Moral hazard and observability. The Bell Journal of Economics, 10(1), 74. https://doi.org/10.2307/3003320
Hong Kong Development Bureau. (2018). Construction 2.0: Time to change.
Ibbs, C. W. (1991). Innovative contract incentive features for construction. Construction Management & Economics, 9, 157–169.
Kauhanen, A., & Napari, S. (2012). Performance measurement and incentive plans. Industrial Relations, 51(3), 645–669.
Korlen, S., Essen, A., Lindgren, P., Amer-Wahlin, I., & von Thiele Schwarz, U. (2017). Managerial strategies to make incentives meaningful and motivating. Journal of Health Organization and Management, 31(2), 126–141.
Kwawu, W., & Laryea, S. (2014). Incentive contracting in construction. In Proceedings 29th Annual Association of Researchers in Construction Management Conference, ARCOM 2013, September, pp 729–738.
Lindenberg, S. (2000). It takes both trust and lack of mistrust: The workings of cooperation and relational signaling in contractual relationships. Journal of Management and Governance, 4(1–2), 11–33. https://doi.org/10.1023/A:1009985720365
Locke, E. A., & Latham, G. P. (1990). A theory of goal setting & task performance. Prentice-Hall, Inc.
Locke, E. A., Latham, G. P., & Erez, M. (1988). The determinants of goal commitment. Academy of Management Review, 13(1), 23–39. https://doi.org/10.5465/AMR.1988.4306771
Macneil, I. R. (1974). A Primer of contract planning.
Maslow, A., & Lewis, K. J. (1987). Maslow’s hierarchy of needs. Salenger Incorporated, 14(17), 987–990.
Meng, X., & Gallagher, B. (2012a). The impact of incentive mechanisms on project performance. International Journal of Project Management, 30, 352–362.
Meng, X., & Gallagher, B. (2012b). The impact of incentive mechanisms on project performance. International Journal of Project Management, 30(3), 352–362. https://doi.org/10.1016/j.ijproman.2011.08.006
Murdock, K., The, S., Journal, R., Winter, N., & Murdock, K. (2002). Intrinsic motivation and optimal incentive contracts. The RAND Journal of Economics, 33(4), 650–671.
Oliver, C. (1990). Determinants of interorganizational relationships: Integration and future directions published by: Academy of management linked references are available on JSTOR for this article: Determinants of interorganizational relationships: Integration and Futu. Academy of Management Review, 15(2), 241–265.
Oliver, R. L. (1974). Expectancy theory predictions of salesmen’s performance. Journal of Marketing Research, 11(3), 243–253.
Pang, H. Y., Cheung, S. O., Choi, M. C., & Chu, S. Y. (2015). Opportunism in construction contracting: Minefield and manifestation. International Journal of Project Organisation and Management, 7(1). https://doi.org/10.1504/IJPOM.2015.068004
Pardee, R. L. (1990). Motivation Theories of Maslow, Herzberg, McGregor & McClelland. A Literature Review of Selected Theories Dealing with Job Satisfaction and Motivation. Business, Feb , 24.
Perry, J. G., Barnes, M., Chan, J. H. L., Chan, D. W. M., Lam, P. T. I., Chan, A. P. C., Chan, J. H. L., Chan, D. W. M., Chan, A. P. C., & Lam, P. T. I. (2000). Target cost contracts: An analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(2), 202–208.
Richmond-Coggan, D. (2001). Construction contract incentive schemes: Lessons from experience.
Rose, T., & Manley, K. (2011). Motivation toward financial incentive goals on construction projects. Journal of Business Research, 64(7), 765–773. https://doi.org/10.1016/j.jbusres.2010.07.003
Savio, R., De Melo, S., Granja, A. D., & Ballard, G. (2013). Collaboration to extend target costing to non-multi-party contracted projects: Evidence from literature. Contract and Cost Management, January 2016, 237–246.
Saka, N., Olanipekun, A. O., & Omotayo, T. (2021). Reward and compensation incentives for enhancing green building construction. Environmental and Sustainability Indicators, 11, 100138.
Sims, B. (2002). How successful safety incentive programs reduce injuries without injury hiding. Safety Health Management, (8 May 2002).
Sparer, E. H., & Dennerlein, J. T. (2013). Determining safety inspection thresholds for employee incentives programs on construction sites. Safety Science, 51(1), 77–84.
Surapto, M., Bakkar, H. L. M., Mooi, H. G., & Hertogh, M. (2016). How do contract types and incentives matter to project performance? International Journal of Project Management, 34, 1071–1087.
Wang, G., Lu, H., Hu, W., Gao, X., & Pishdad-Bozorgi, P. (2020). Understanding behavioral logic of information and communication technology adoption in small- and medium-sized construction enterprises: Empirical study from China. Journal of Management in Engineering, 36(6), 1–11. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000843
Wang, W., Chen, Y., & Zhang, S. (2018). Contractual complexity in construction projects: Conceptualization, operationalization, and validation. Project Management Journal, 49(3), 46–61.
Wigfield, A., & Eccles, J. S. (2002). Expectancy-value theory of achievement motivation. Journal of Asynchronous Learning Network, 6(1), 68–81. https://doi.org/10.1006/ceps.1999.1015
Williamson, O. E. (1985). The economic institutions of capitalism. In China Social Sciences Publishing House Chengcheng Books Ltd. https://doi.org/10.5465/AMR.1987.4308003
Wong, W. K., Cheung, S. O., Yiu, T. W., & Pang, H. Y. (2008). A framework for trust in construction contracting. International Journal of Project Management, 26(8), 821–829. https://doi.org/10.1016/j.ijproman.2007.11.004
Yeow, P. H. P., & Goomas, D. T. (2014). Outcome-and-behavior-based safety incentive program to reduce accidents: A case study of a fluid manufacturing plant. Safety Science, 70, 429–437. https://doi.org/10.1016/j.ssci.2014.07.016
Zhu, L., & Cheung, S. O. (2018). The implementation of incentive schemes in construction. In 11th International Cost Engineering Council (ICEC)World Congress & the 22nd Annual Pacific Association of Quantity Surveyors Conference in 2018, pp. 1–9.
Zhu, L., & Cheung, S. O. (2021). Towards an Equity-based analysis of construction incentivization. Journal of Construction Engineering and Management.
Zhu, L., Cheung, S. O., Gao, X., Li, Q., & Liu, G. (2020). Success DNA of a record-breaking megaproject. Journal of Construction Engineering and Management, 146(8), 05020009. https://doi.org/10.1061/(asce)co.1943-7862.0001878
Zuppa, D., Olbina, S., & Issa, R. (2016). Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(2), 211–236. https://doi.org/10.1108/ECAM-05-2015-0081
Acknowledgements
The work described in this chapter was fully supported by a HKRGC General Research Fund (project number 11202722).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2023 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this chapter
Cite this chapter
Cheung, S.O., Zhu, L. (2023). A Primer of Incentivization in Construction. In: Cheung, S.O., Zhu, L. (eds) Construction Incentivization. Digital Innovations in Architecture, Engineering and Construction. Springer, Cham. https://doi.org/10.1007/978-3-031-28959-0_1
Download citation
DOI: https://doi.org/10.1007/978-3-031-28959-0_1
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-031-28958-3
Online ISBN: 978-3-031-28959-0
eBook Packages: EngineeringEngineering (R0)