Skip to main content

A Primer of Incentivization in Construction

  • Chapter
  • First Online:
Construction Incentivization

Abstract

Many construction projects end with cost overrun, delay and defects. These undesirable outcomes are particularly disheartening with mega projects. The construction industry has been seeking ways to improve project performance and inter alia, incentive schemes have been used widely as one of the means to induce extra efforts from contracting organisations. In 2007, the Hong Kong Government announced the construction of ten mega projects. Notwithstanding these mega projects have all incorporated certain forms of incentive, delay, substantial cost overruns and quality issues have been reported. The authors observed the following pattern of use of construction incentivization (CI): (i) Most of the CI have targets set on time, cost, quality, and safety, (ii) No clear pattern of how CI are developed, (iii) ‘Carrots’ are used far more often than ‘sticks’, (iv) The use of CI is far more common in public projects than private projects, (v) Most targets are quantitative, and (vi) Choice of CI is rather incidental. Apparently, there are two major shortcomings of the prevailing CI arrangements. First, CI is anchored on motivation theories that are mostly related to individuals; Second, the targets are outcome based and mainly tied with developers’ goals. This outcome-based approach is useful for tasks of high programmability with outcome that can be accurately projected. However, construction tasks, especially those that need innovation, are typically of low programmability with loose outcome predictability. To overcome these shortcomings, this primer suggests that incentivization should aim for effort greater than mere competence and go beyond carrot and stick should be used. It is advocated that integrative incentive should be used and have five functions: (1) Goal Commitment; (2) Expectation Alignment; (3) Information Exchangeability; (4) Risk Efficiency; and (5) Relationship Investment.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 119.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Free shipping worldwide - see info
Hardcover Book
USD 159.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Abu-Hijleh, S. F., & Ibbs, C. W. (1989a). Schedule-based construction incentives. Journal of Construction Engineering and Management, 115(3), 430–443.https://doi.org/10.1061/(ASCE)0733-9364(1989)115:3(430)

  • Acquah, A., Nsiah, T. K., Antie, E. N. A., & Otoo, B. (2021). Literature review on theories of motivation. EPRA International Journal of Economic and Business Review, 9(5), 25–29.

    Article  Google Scholar 

  • Adams, J. S. (1963). Toward an understanding of inequity. Journal of Abnormal and Social Psychology, 67(5), 422–436. https://doi.org/10.1093/past/96.1.22

    Article  Google Scholar 

  • Adams, J. S. (1965). Inequity in social exchange. Advances in Experimental Social Psychology, 2, 267–299.

    Article  Google Scholar 

  • Adams, J. S., & Freedman, S. (1976). Equity theory revisited: Comments and annotated bibliography. Advances in Experimental Social Psychology, 9(C), 43–90. https://doi.org/10.1016/S0065-2601(08)60058-1

  • Arditi, D., & Yasamis, F. (1998). Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), 361–373. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:5(361)

    Article  Google Scholar 

  • Back, W. E., Grau, D., & Mejia-Aguilar, G. (2013). Effectiveness evaluation of contract incentives on project performance. International Journal of Construction Education and Research, 9(4), 288–306. https://doi.org/10.1080/15578771.2012.729551

    Article  Google Scholar 

  • Bandura, A. (1978). The self system in reciprocal determinism. In American Psychologist (Vol. 33, Issue 4, pp. 344–358). https://doi.org/10.1037/0003-066X.33.4.344

  • Bandura, A. (1982). Self-efficacy mechanism in human agency. American Psychologist, 37(2), 122–147.

    Article  Google Scholar 

  • Bandura, A. (1993). Perceived self-efficacy-in-cognitive-development-and-functioning. Educational Psychologist, 28(2), 117–148.

    Article  Google Scholar 

  • Baron, D. P. (1995). Integrated strategy: Market and nonmarket components. California Management Review, 37(2), 47–65.

    Article  Google Scholar 

  • Bayliss, R., Cheung, S. O., Suen, H. C. H., & Wong, S. P. (2004). Effective partnering tools in construction: A case study on MTRC TKE contract 604 in Hong Kong. International Journal of Project Management, 22(3), 253–263. https://doi.org/10.1016/S0263-7863(03)00069-3

    Article  Google Scholar 

  • Bootzin, R. R., Epstein, D., & Wood, J. M. (1991). Stimulus control instructions. In Case studies in insomnia (pp. 19–28). Springer.

    Google Scholar 

  • Boukendour, S., & Hughes, W. (2014). Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), 279–289. https://doi.org/10.1080/01446193.2013.875215

    Article  Google Scholar 

  • Bresnen, M., & Marshall, N. (2000). Motivation, commitment and the use of incentives in partnerships and alliances. Construction Management and Economics, 18(5), 587–598. https://doi.org/10.1080/014461900407392

    Article  Google Scholar 

  • Carter, M., & Armenakis, A. (2013). Transformative leadership, relationship quality, an employee performance during continuous incremental organizational change. Journal of Organizational Behavior, 34(7), 942–958.

    Google Scholar 

  • Chan, D. W. M., Lam, P. T. I., Chan, A. P. C., Wong, J. M. W., & Author, C. (2010). Achieving better performance through target cost contracts—The tale of an underground railway station modification project. Performance Measurement and Management in Facilities Management, 28(5/6), 261–277.

    Google Scholar 

  • Cheung, S. O., & Chan, K. Y. (2014). Construction Innovations in Hong Kong: A catalogue. City University of Hong Kong.

    Google Scholar 

  • Cheung, S. O., Wong, W. K., Yiu, T. W., & Pang, H. Y. (2011). Developing a trust inventory for construction contracting. International Journal of Project Management, 29(2), 184–196. https://doi.org/10.1016/j.ijproman.2010.02.007

    Article  Google Scholar 

  • Cheung, S. O., Yiu, T. W., & Lam, M. C. (2013). Interweaving trust and communication with project performance. Journal of Construction Engineering and Management, 139(8), 941–950. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000681

    Article  Google Scholar 

  • Cheung, S. O., Wong, W. K., Yiu, T. W., & Pang, H. Y. (2014). Construction dispute research. Springer. https://doi.org/10.1007/978-3-319-04429-3

    Book  Google Scholar 

  • Cheung, S. O., Zhu, L., & Lee, K. W. (2018). Incentivization and interdependency in construction contracting. Journal of Management in Engineering, 34(3), 1–13. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000601

    Article  Google Scholar 

  • Eisenhardt, K. M. (1985). Control: Organizational and economic approaches. Management Science, 31(2), 134–149.

    Article  Google Scholar 

  • Eisenhardt, K. M. (1988). Agency and institutional theory explanations: The case of retail sales compensation. The Academy of Management Journal, 31(3), 488–511.

    Google Scholar 

  • Flyvbjerg, B. (2017). The oxford handbook of megaproject management. Oxford University Press. https://doi.org/10.1084/jem.20050882

    Article  Google Scholar 

  • Gibbs, M., Merchant, K., Van Der Stede, W., & Vargus, M. (2009). Performance measure properties and incentive system design. Industrial Relations, 48(2), 237–264.

    Article  Google Scholar 

  • Gneezy, U., Meier, S., & Rey-Biel, P. (2011). When and why incentives (don’t) work to modify behavior. Journal of Economic Perspectives, 25(4), 191–210. https://doi.org/10.1257/jep.25.4.191

    Article  Google Scholar 

  • Herten, H. J., & Peeters, W. A. R. (1986). Incentive contracting as a project management tool. In Herten H. J., Peeters W. A. R. (Vol. 4, Issue 1, pp. 34–39). https://doi.org/10.1016/0263-7863(86)90060-8

  • Hetemi, E., Gemünden, H. G., & Meré, J. O. (2020). Embeddedness and actors’ behaviors in large-scale project life cycle: lessons learned from a high-speed rail project in Spain. Journal of Management in Engineering, 36(6), 05020014. https://doi.org/10.1061/(asce)me.1943-5479.0000849

    Article  Google Scholar 

  • Herzberg, F. I. (1966). Work and the Nature of Man.

    Google Scholar 

  • Herzberg, F. I. (1970). Avoiding pain in the organization. Industry Week. Dec, 7.

    Google Scholar 

  • Herzberg, F. I. (1974). The wise old Turk. Harvard Business Review, 54(5), 70–80.

    Google Scholar 

  • Holmstrom, B. (1979). Moral hazard and observability. The Bell Journal of Economics, 10(1), 74. https://doi.org/10.2307/3003320

    Article  Google Scholar 

  • Hong Kong Development Bureau. (2018). Construction 2.0: Time to change.

    Google Scholar 

  • Ibbs, C. W. (1991). Innovative contract incentive features for construction. Construction Management & Economics, 9, 157–169.

    Article  Google Scholar 

  • Kauhanen, A., & Napari, S. (2012). Performance measurement and incentive plans. Industrial Relations, 51(3), 645–669.

    Article  Google Scholar 

  • Korlen, S., Essen, A., Lindgren, P., Amer-Wahlin, I., & von Thiele Schwarz, U. (2017). Managerial strategies to make incentives meaningful and motivating. Journal of Health Organization and Management, 31(2), 126–141.

    Google Scholar 

  • Kwawu, W., & Laryea, S. (2014). Incentive contracting in construction. In Proceedings 29th Annual Association of Researchers in Construction Management Conference, ARCOM 2013, September, pp 729–738.

    Google Scholar 

  • Lindenberg, S. (2000). It takes both trust and lack of mistrust: The workings of cooperation and relational signaling in contractual relationships. Journal of Management and Governance, 4(1–2), 11–33. https://doi.org/10.1023/A:1009985720365

    Article  Google Scholar 

  • Locke, E. A., & Latham, G. P. (1990). A theory of goal setting & task performance. Prentice-Hall, Inc.

    Google Scholar 

  • Locke, E. A., Latham, G. P., & Erez, M. (1988). The determinants of goal commitment. Academy of Management Review, 13(1), 23–39. https://doi.org/10.5465/AMR.1988.4306771

    Article  Google Scholar 

  • Macneil, I. R. (1974). A Primer of contract planning.

    Google Scholar 

  • Maslow, A., & Lewis, K. J. (1987). Maslow’s hierarchy of needs. Salenger Incorporated, 14(17), 987–990.

    Google Scholar 

  • Meng, X., & Gallagher, B. (2012a). The impact of incentive mechanisms on project performance. International Journal of Project Management, 30, 352–362.

    Article  Google Scholar 

  • Meng, X., & Gallagher, B. (2012b). The impact of incentive mechanisms on project performance. International Journal of Project Management, 30(3), 352–362. https://doi.org/10.1016/j.ijproman.2011.08.006

    Article  Google Scholar 

  • Murdock, K., The, S., Journal, R., Winter, N., & Murdock, K. (2002). Intrinsic motivation and optimal incentive contracts. The RAND Journal of Economics, 33(4), 650–671.

    Article  Google Scholar 

  • Oliver, C. (1990). Determinants of interorganizational relationships: Integration and future directions published by: Academy of management linked references are available on JSTOR for this article: Determinants of interorganizational relationships: Integration and Futu. Academy of Management Review, 15(2), 241–265.

    Article  Google Scholar 

  • Oliver, R. L. (1974). Expectancy theory predictions of salesmen’s performance. Journal of Marketing Research, 11(3), 243–253.

    Article  Google Scholar 

  • Pang, H. Y., Cheung, S. O., Choi, M. C., & Chu, S. Y. (2015). Opportunism in construction contracting: Minefield and manifestation. International Journal of Project Organisation and Management, 7(1). https://doi.org/10.1504/IJPOM.2015.068004

  • Pardee, R. L. (1990). Motivation Theories of Maslow, Herzberg, McGregor & McClelland. A Literature Review of Selected Theories Dealing with Job Satisfaction and Motivation. Business, Feb , 24.

    Google Scholar 

  • Perry, J. G., Barnes, M., Chan, J. H. L., Chan, D. W. M., Lam, P. T. I., Chan, A. P. C., Chan, J. H. L., Chan, D. W. M., Chan, A. P. C., & Lam, P. T. I. (2000). Target cost contracts: An analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(2), 202–208.

    Article  Google Scholar 

  • Richmond-Coggan, D. (2001). Construction contract incentive schemes: Lessons from experience.

    Google Scholar 

  • Rose, T., & Manley, K. (2011). Motivation toward financial incentive goals on construction projects. Journal of Business Research, 64(7), 765–773. https://doi.org/10.1016/j.jbusres.2010.07.003

    Article  Google Scholar 

  • Savio, R., De Melo, S., Granja, A. D., & Ballard, G. (2013). Collaboration to extend target costing to non-multi-party contracted projects: Evidence from literature. Contract and Cost Management, January 2016, 237–246.

    Google Scholar 

  • Saka, N., Olanipekun, A. O., & Omotayo, T. (2021). Reward and compensation incentives for enhancing green building construction. Environmental and Sustainability Indicators, 11, 100138.

    Article  Google Scholar 

  • Sims, B. (2002). How successful safety incentive programs reduce injuries without injury hiding. Safety Health Management, (8 May 2002).

    Google Scholar 

  • Sparer, E. H., & Dennerlein, J. T. (2013). Determining safety inspection thresholds for employee incentives programs on construction sites. Safety Science, 51(1), 77–84.

    Article  Google Scholar 

  • Surapto, M., Bakkar, H. L. M., Mooi, H. G., & Hertogh, M. (2016). How do contract types and incentives matter to project performance? International Journal of Project Management, 34, 1071–1087.

    Article  Google Scholar 

  • Wang, G., Lu, H., Hu, W., Gao, X., & Pishdad-Bozorgi, P. (2020). Understanding behavioral logic of information and communication technology adoption in small- and medium-sized construction enterprises: Empirical study from China. Journal of Management in Engineering, 36(6), 1–11. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000843

    Article  Google Scholar 

  • Wang, W., Chen, Y., & Zhang, S. (2018). Contractual complexity in construction projects: Conceptualization, operationalization, and validation. Project Management Journal, 49(3), 46–61.

    Article  Google Scholar 

  • Wigfield, A., & Eccles, J. S. (2002). Expectancy-value theory of achievement motivation. Journal of Asynchronous Learning Network, 6(1), 68–81. https://doi.org/10.1006/ceps.1999.1015

    Article  Google Scholar 

  • Williamson, O. E. (1985). The economic institutions of capitalism. In China Social Sciences Publishing House Chengcheng Books Ltd. https://doi.org/10.5465/AMR.1987.4308003

    Article  Google Scholar 

  • Wong, W. K., Cheung, S. O., Yiu, T. W., & Pang, H. Y. (2008). A framework for trust in construction contracting. International Journal of Project Management, 26(8), 821–829. https://doi.org/10.1016/j.ijproman.2007.11.004

    Article  Google Scholar 

  • Yeow, P. H. P., & Goomas, D. T. (2014). Outcome-and-behavior-based safety incentive program to reduce accidents: A case study of a fluid manufacturing plant. Safety Science, 70, 429–437. https://doi.org/10.1016/j.ssci.2014.07.016

    Article  Google Scholar 

  • Zhu, L., & Cheung, S. O. (2018). The implementation of incentive schemes in construction. In 11th International Cost Engineering Council (ICEC)World Congress & the 22nd Annual Pacific Association of Quantity Surveyors Conference in 2018, pp. 1–9.

    Google Scholar 

  • Zhu, L., & Cheung, S. O. (2021). Towards an Equity-based analysis of construction incentivization. Journal of Construction Engineering and Management.

    Google Scholar 

  • Zhu, L., Cheung, S. O., Gao, X., Li, Q., & Liu, G. (2020). Success DNA of a record-breaking megaproject. Journal of Construction Engineering and Management, 146(8), 05020009. https://doi.org/10.1061/(asce)co.1943-7862.0001878

    Article  Google Scholar 

  • Zuppa, D., Olbina, S., & Issa, R. (2016). Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(2), 211–236. https://doi.org/10.1108/ECAM-05-2015-0081

    Article  Google Scholar 

Download references

Acknowledgements

The work described in this chapter was fully supported by a HKRGC General Research Fund (project number 11202722).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sai On Cheung .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2023 The Author(s), under exclusive license to Springer Nature Switzerland AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Cheung, S.O., Zhu, L. (2023). A Primer of Incentivization in Construction. In: Cheung, S.O., Zhu, L. (eds) Construction Incentivization. Digital Innovations in Architecture, Engineering and Construction. Springer, Cham. https://doi.org/10.1007/978-3-031-28959-0_1

Download citation

  • DOI: https://doi.org/10.1007/978-3-031-28959-0_1

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-031-28958-3

  • Online ISBN: 978-3-031-28959-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics