Abstract
Project feasibility analysis is a key process in organizations to predict the success of projects in the future. This process becomes complex because it involves multiple criteria, which are evaluated in uncertain environments. This paper presents a model to perform the feasibility analysis of investment projects in uncertain environments using soft computing techniques. The model includes technical, economic, social and commercial criteria and the methods for its calculation. Traditional economic criteria are extended by introducing triangular fuzzy numbers, which provides greater flexibility and certainty in predicting economic feasibility. The 2-tuple linguistic representation model is used in the qualitative evaluation of the criteria and the calculation of the final results. The model output is the feasibility analysis of the projects, integrating the results of all the evaluated criteria without loss of information, which provides greater interpretability for decision making. The case study and experiments conducted demonstrate that the model is applicable in real environments and that its ability to predict feasibility is greater than that of other proposals.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Mesároš, P., Mandičák, T., Behúnová, A.: Use of BIM technology and impact on productivity in construction project management. Wirel. Netw. 1–8 (2020)
Pérez, I., Piñero, P.Y., García-Vacacela, R., Bello, R., Santos, O., Vázquez, M.: Extensions to linguistic summaries indicators based on neutrosophic theory, applications in project management decisions. Infinite Study (2018)
Zulueta, Y., Rodríguez, R., Bello, R., Martínez, L.: A hesitant heterogeneous approach for environmental impact significance assessment. J. Environ. Inf. 29(2), 74–87 (2017)
Soler, J.A., Delgado, F.M., Sanjuán, A.M., García, M.N.: Modelos para evaluar la sostenibilidad de las organizaciones. Estudios Gerenciales 63–73 (2018)
Dave, B., Buda, A., Nurminen, A., Främling, K.: A framework for integrating BIM and IoT through open standards. Autom. Constr. 95, 35–45 (2018)
ICB.: Swiss individual competence baseline: Version 4.0: Beschreibung der individuellen Kompetenz im Management von Programmen gemäss IPMA (2016)
PMI.: The standard for Project Management and a guide to the Project Management Body of Knowledge, 7th Edition. Project Management Institute, ISBN: 978-1-62825-664-2 370 (2021)
SEI.: CMMI for Development v1.3, SEI CMMI Production, CMU/SEI-2010-TR-034, Technical report, Software Engineering Institute (2010)
Zandhuis, A., Stellingwerf, R.: ISO 21500: Guidance on Project Management; a Pocket Guide: Van Haren (2013)
Al–Subhi, S.H., Mahdi, G.S., Alava, M.V., Pérez, M.P., Vázquez, M.L.: Operador media potencia pesada lingüística y su aplicación en la toma de decisiones. Int. J. Innov. Appl. Stud. 22(1), 38–43 (2017)
Zulueta-Veliz, Y., García-Cabrera, L.: A choquet integral–based approach to multiattribute decision–making with correlated periods. Granular Computing 3(3), 245–256 (2018)
Kaufmann, A., Aluja, J.G., Pirla, J.M.: Introducción a la teoría de los subconjuntos borrosos a la gestión de las empresas: Milladoiro (1986)
Felix, G., Nápoles, G., Falcon, R., Froelich, W., Vanhoof, K., Bello, R.: A review on methods and software for fuzzy cognitive maps. Artif. Intell. Rev. 52(3), 1707–1737 (2019)
Cruz, A.D., Hidalgo, K.M., Medina, M.Q.: Evaluación de factibilidad de proyectos de inversión. Revista Caribeña de Ciencias Sociales (2014)
Ochoa, E.A.: Investigación y Desarrollo, un Método Comparativo de su Valuación. Paper presented at the Sixth LACCEI International Latin American and Caribbean Conference for Engineering and Technology Honduras (2008)
Little, I., Mirrlees, J.A., Mirrlees, J.A.: Estudio social del costo beneficio en la industria de países en desarrollomanual de evaluación de proyectos (1973)
ONU.: Manual para la preparación de Estudios de Viabilidad Industrial. Naciones Unidas, Nueva York (1978)
Dubs de Moya, R.: El proyecto factible: una modalidad de investigación. Sapiens. Revista Universitaria de Investigación, 3(2) (2002)
Milanesi, G.S.: Un modelo de opciones reales fuzzy y funciones de utilidad isoelásticas para valorar I&D en mercados incompletos. Estocástica: finanzas y riesgo, 8(2), 205–232 (2018)
Miranda, J.J.: Gestión de proyectos: identificación, formulación, evaluación financiera–económica–social–ambiental: MMEditores (2005)
Pollack., J.F.: Back propagation is sensitive to initial conditions 860–867 (1991)
Rodríguez, T.C., Montibeller, G., Oliveira, M.D., Costa, C.A.: Modelling multicriteria value interactions with reasoning maps. Eur. J. Oper. Res. 258(3), 1054–1071 (2017)
Kengpol, A., O’Brien, C.: The development of a decision support tool for the selection of advanced technology to achieve rapid product development. Int. J. Prod. Econ. 69(2), 177–191 (2001)
Abreu, M.P.: Modelo para el análisis de factibilidad de proyectos de software en entornos de incertidumbre (Tesis doctoral), Universidad de las Ciencias Informáticas. La Habana, Cuba (2017)
Torres, S.: Modelo de evaluación de competencias a partir de evidencias durante la gestión de proyectos (Tesis doctoral), Universidad de las Ciencias Informáticas La Habana, Cuba (2015)
Abreu, M.P., Rodríguez, C.R., García-Vacacela, R., Piñero, P.Y.: Economic feasibility of projects using triangular fuzzy numbers. In IWAIPR 2018, pp. 288–298. Springer, Cham (2018)
Herrera F., Martínez L., Sánchez P.J.: Managing non-homogeneous information in group decision making. Eur. J. Oper. Res. 166(1), 115–132 (2005)
Herrera, F., Martinez, L.: A 2–tuple fuzzy linguistic representation model for computing with words. IEEE Trans. Fuzzy Syst. 8(6), 746–752 (2000)
Castro, M.D.: Método de evaluación de proyectos para decidir su aceptación. (Maestría) Grupo de Investigaciones en Gestión de Proyectos, Universidad de las Ciencias Informáticas La Habana (2010)
Piñero, P.Y., Pérez, I., Rivero, C., Rojas, C., Sosa, R., Torres, S.: Repositorio de datos para investigaciones en gestión de proyectos. Rev. Cuba. Cienc. Informáticas 13(1), 176–191 (2019)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this chapter
Cite this chapter
Peña Abreu, M., Rodríguez Rodríguez, C.R., Piñero Pérez, P.Y., García García, Y. (2022). New Methods for Feasibility Analysis of Investment Projects in Uncertain Environments. In: Piñero Pérez, P.Y., Bello Pérez, R.E., Kacprzyk, J. (eds) Artificial Intelligence in Project Management and Making Decisions. UCIENCIA 2021. Studies in Computational Intelligence, vol 1035. Springer, Cham. https://doi.org/10.1007/978-3-030-97269-1_8
Download citation
DOI: https://doi.org/10.1007/978-3-030-97269-1_8
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-97268-4
Online ISBN: 978-3-030-97269-1
eBook Packages: Intelligent Technologies and RoboticsIntelligent Technologies and Robotics (R0)