Abstract
The steelmaking-continuous casting (SCC) is a bottleneck process in the steel production. Due to elevated product variety and environmental restrictions on the steelmaking industry, efficient operation of the SCC has become more crucial. This paper considers an SCC scheduling problem to minimize the weighted sum of total waiting time, total earliness, and total tardiness while satisfying the maximum waiting time and the continuous casting constraints. We propose a generic mixed integer linear programming (MILP) model that can express various SCC scheduling requirements. Using the MILP model, we develop an iterated greedy matheuristic inspired by the iterated greedy method. An initial SCC schedule is constructed by solving small MILP models one after another. Then, it is improved by solving a series of small MILP models representing the destruction and construction of the prior schedule. Through a numerical experiment, we show that the proposed algorithm can obtain efficient solutions in a short time and outperforms an NSGA-II algorithm for most test cases of practical size.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Cui, H., Luo, X., Wang, Y.: Scheduling of steelmaking-continuous casting process using deflected surrogate Lagrangian relaxation approach and DC algorithm. Comput. Ind. Eng. 140, 106271 (2020)
Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput. 6(2), 182–197 (2002)
Dutta, S.K., Chokshi, Y.B.: Secondary steelmaking. In: Basic Concepts of Iron and Steel Making, pp. 497–536. Springer, Singapore (2020). https://doi.org/10.1007/978-981-15-2437-0_17
GarcÃa-Menéndez, D., Morán-Palacios, H., Ortega-Fernández, F., DÃaz-Piloñeta, M.: Scheduling in continuous steelmaking casting: a systematic review. ISIJ Int. 60(6), 1097–1107 (2020)
Long, J., Zheng, Z., Gao, X., Pardalos, P.M.: A hybrid multi-objective evolutionary algorithm based on NSGA-II for practical scheduling with release times in steel plants. J. Oper. Res. Soc. 67(9), 1184–1199 (2016). https://doi.org/10.1057/jors.2016.17
Missbauer, H., Hauber, W., Stadler, W.: A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry. Int. J. Prod. Res. 47(15), 4147–4172 (2009)
Pan, Q.K.: An effective co-evolutionary artificial bee colony algorithm for steelmaking-continuous casting scheduling. Eur. J. Oper. Res. 250(3), 702–714 (2016)
Ruiz, R., Stützle, T.: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. Eur. J. Oper. Res. 177(3), 2033–2049 (2007)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2021 IFIP International Federation for Information Processing
About this paper
Cite this paper
Hong, J., Lee, K., Lee, K., Moon, K. (2021). An Iterated Greedy Matheuristic for Scheduling in Steelmaking-Continuous Casting Process. In: Dolgui, A., Bernard, A., Lemoine, D., von Cieminski, G., Romero, D. (eds) Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems. APMS 2021. IFIP Advances in Information and Communication Technology, vol 630. Springer, Cham. https://doi.org/10.1007/978-3-030-85874-2_7
Download citation
DOI: https://doi.org/10.1007/978-3-030-85874-2_7
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-85873-5
Online ISBN: 978-3-030-85874-2
eBook Packages: Computer ScienceComputer Science (R0)