Skip to main content

Optimisation of Hydraulic Design of Uri-II Dam Spillway, Jammu and Kashmir

  • Chapter
  • First Online:
River Hydraulics

Part of the book series: Water Science and Technology Library ((WSTL,volume 110))

  • 383 Accesses

Abstract

Optimisation of hydraulic design of spillway involves verification of designs of various components of spillway which includes crest profile of spillway and bottom profile of breast wall, adequacy of spillway spans to pass the design flood, the sufficiency of divide walls and training walls, location of trunnion of gates, assessing the performance of energy dissipator, assessing the scour downstream of ski-jump bucket, design of pre-formed plunge pool, location of head regulator/power intake structure and upstream and downstream protection subjected to design floodwaters. Hydraulic model studies play a key role in optimising the designs of various components of the spillway as mentioned above. Hydraulic design of spillway of Uri-II dam was optimised in CWPRS, Pune, by conducting hydraulic model studies. Uri-II H.E.Project was envisaged as a run-of-the-river scheme on the River Jhelum in Uri Tehsil of Baramulla District of Jammu and Kashmir. It has a power generation capacity of 240 MW (4 units of 60 MW each) utilising a gross head of about 130 m. The project consists of a 52 m high and 173 m long concrete gravity dam with a 4.27 km long headrace tunnel (8.4 m diameter), a restricted orifice-type surge shaft (25 m diameter), two 5 m diameter steel-lined penstocks, four 3.5 m diameter bifurcated steel-lined penstocks, an underground powerhouse and a horseshoe shaped tailrace tunnel 3.77 km in length. The spillway is designed to pass design outflow flood of 4850 m3/s at FRL El. 1241 m and also to flush the sediment deposited in the reservoir into the river downstream. A breast wall spillway has been proposed with four low-level orifices of size 9 m wide × 11.4 m high (originally 12 m high) with crest level at El. 1217 m. The ski-jump bucket is provided for energy dissipation with invert at El. 1210.19 m and lip at El. 1213 m. The project was completed and all four units were commissioned and the 4th unit in July 2014. Hydraulic model studies enabled optimisation of various components of spillway by optimising the size of spillway spans and design of natural plunge pool and suggesting downstream hill slopes protection. Optimised hydraulic design was made by assessing the discharging capacity of the spillway, validating crest profile with pressures on the spillway surface, the performance of energy dissipation arrangement for the entire range of discharges, flow conditions in the reservoir upstream of the spillway and head regulator, flow conditions downstream of the spillway and head regulator and requirement of a natural plunge pool with expected scour levels. This paper provides detailed information on the hydraulic model studies carried out on the spillway and energy dissipator of Uri-II dam spillway, Jammu and Kashmir.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 149.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 199.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 199.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • BIS 11223 (1985) Guidelines for fixing spillway capacity

    Google Scholar 

  • Bureau of Indian Standards (1985) Criteria for Hydraulic design of bucket type energy dissipators. IS: 7365–1985, 2nd revision

    Google Scholar 

  • Chee SP, Kung T (1973) Stream geometry of water jet basins. In: Proceedings of hydraulics conference, Canadian society of civil engineers

    Google Scholar 

  • CWPRS Technical Report No. 4210 (2005) Hydraulic Model Studies for Uri dam spillway, Stage-II, Jammu and Kashmir

    Google Scholar 

  • CWPRS Technical Report No. 4265 (2005) Additional hydraulic model studies for scour downstream of Uri-II H. E.Project, Jammu and Kashmir

    Google Scholar 

  • Damle PM, Venkatraman CP, Desai SC (1966) Evaluation of Scour below Ski-jump Buckets of Spillways. In: Proceedings of CWPRS Golden Jubilee Symposium, Pune, India, vol I, pp 154–163

    Google Scholar 

  • http://www.nhpcindia.com/projects

  • https://www.hccindia.com/markets/hydro-power

  • https://www.mapsofindia.com/maps/dams/uri-hydroelectric-dam.html

  • Khatsuria RM (1992) State of art on computation, prediction and analysis of scour in rocky beds downstream of ski jump spillways. CWPRS Memorandum

    Google Scholar 

  • Khatsuria RM (2013) Predicting scour below ski jump spillways—Damle equation. Hydrotopics

    Google Scholar 

  • Martins RBF (1975) Scouring of rocky river beds by free jet spillways. Water Power Dam Construct 27(4):1975

    Google Scholar 

  • Naghikhani A, Noori R, Sheikhian H, Ghiasi B (2015) Estimating scour hole dimensions of ski jump downstream of dams using granular computing model. J Hydraulics 9(3):45–60

    Google Scholar 

  • Shixia W (1987) Scouing of river beds below sluices and dams—Design of Hydraulic structures. In: Proceedings of the international symposium on design of hydraulic structures, Colorado State University, USA, August, 1987, pp 295–304

    Google Scholar 

  • Veronese A (1937) Erosion de fond en aval d’une decharge, IAHR meeting for hydraulic works, Berlin

    Google Scholar 

Download references

Acknowledgements

The authors are grateful to Director, CWPRS, for his encouragement and support in writing the technical paper. The authors are grateful to the Design/Project Engineers of NHPC for awarding the work of conducting hydraulic model studies to CWPRS and providing valuable inputs/suggestions during the course of the studies. The help of all CWPRS staff in conducting the studies is gratefully acknowledged.

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2022 The Author(s), under exclusive license to Springer Nature Switzerland AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Ramarao, V.S., Bhajantri, M.R. (2022). Optimisation of Hydraulic Design of Uri-II Dam Spillway, Jammu and Kashmir. In: Jha, R., Singh, V.P., Singh, V., Roy, L.B., Thendiyath, R. (eds) River Hydraulics. Water Science and Technology Library, vol 110. Springer, Cham. https://doi.org/10.1007/978-3-030-81768-8_14

Download citation

Publish with us

Policies and ethics