Keywords

1 Introduction

The buildings and construction sector accounted for 36% of final energy use and 39% of energy and process-related carbon dioxide (CO2) emissions in 2018 [1]. In order to meet sustainability goals and mitigate climate change, energy systems must be more effective [2]. The visualisation of energy systems’ performance can enhance the user’s understanding of the system and, therefore, their decision-making relating to them [3]. Buildings consist of several energy systems, such as the heating, ventilation, and air conditioning (HVAC) systems, lighting systems and electric motors, out of which heating, space cooling, water heating, and lighting accounted for nearly 70% of site energy consumption [4]. The integration of Building Information Modelling (BIM) and Augmented Reality (AR) provides the construction industry with many benefits, such as checking building designs [5, 6]. Although BIM models contain the energy systems information, the possibilities for visualising and analysing building energy system performance and behaviour by integrating BIM and AR have not been sufficiently explored.

2 Method

To explore the possibility of visualising digital data of energy systems and to understand the current limitations associated with the usage of BIM and AR for energy system visualisation, a BIM model was generated and visualised in AR using the process illustrated in Fig. 11.1.

Fig. 11.1
figure 1

BIM modelling and visualisation in AR schematic flowchart

2.1 Generation of a BIM Model

For the purposes of experimentation, a BIM model of a room at Teesside University with mechanical, electrical and plumbing (MEP) data was created, as shown in Fig. 11.2. An oval-shaped room was selected as atypical and particularly challenging for the traditional computer aided design software [7]. Therefore, the 3D model of the selected room was first automatically generated using a 3D camera (Matterport Pro 2) and Matterport app. SketchUp Pro was used to design and add MEP data and information to the model. The 3D model of the meeting room in OBJ format was imported and scaled 1:1 to avoid any issues that could arise related to scaling. A layer was then added for the room model, and MEP data were drawn and textured using three different layers and colours. The electrical lighting components are represented in red, the HVAC systems in grey and the piping system in green. Textual information was added near appropriate elements of the building to give further technical details of the systems.

Fig. 11.2
figure 2

Room mesh model with MEP components

2.2 Visualisation in AR

The generated model of the room was superimposed to the actual physical building using freely available software 3D Viewer Beta and visualised in Augmented Reality equipment Microsoft HoloLens 1–Developers Edition. The AR device’s spatial mapping system generates a map of meshes that represent the physical space, which enables the placement of the digital model into the physical environment [8]. Using the 3D Viewer Beta AR software, the model was superimposed by trial and error. Since the software does not have a prescribed way of superimposing objects, the model was superimposed using arbitrary reference points. The appearance of physical systems found in the building was analysed to understand the possible uses of AR and current limitations in visualising energy systems.

3 Results

The room was visualised in AR using two different approaches: with and without the MEP systems added to the model. It was possible to successfully open the model using both approaches on AR software and interact with such models in the AR environment. The interaction and response times of the model were slow due to the large number of mesh elements it needed to process with the curved shape of the room. The different components of the room, such as the doors, windows and room furniture were visible; therefore, the different sections, such as the walls and ceiling, could be recognised. Although the model’s texture was imported from SketchUp which showed colouring, the colour visualised in AR was plain white. There was a clear quality difference between the model in OBJ format and the model in the AR environment in FBX format. However, the model did show the actual geometry of the components, as presented in Fig. 11.3.

Fig. 11.3
figure 3

Model visualisation in AR environment

The MEP data were visible, and the system’s components appeared to be on top of the ceiling. The electrical component added to the model logically matched the room lighting. The mechanical ventilation system was also positioned in a way so that it met the room ventilation cap and made its way out, passing through the ceiling and wall cavity. The water pipe, added as the plumbing system of the building, was also visible and located at the correct position. The written information about the different MEP systems and room components was visible and readable. Although the colour was not as assigned and presented in Fig. 11.2, the geometry was visible as modelled and positioned.

4 Discussion

4.1 Visualisation Procedure

The visualisation procedure depends on various factors, such as the software used to create the BIM model, type of AR equipment and AR software being used. For this experiment, the BIM model created as described in Fig. 11.1 consisted of limited information, whereas having a more detailed BIM model could provide a better insight. The type of AR equipment used also had a significant impact on the AR experience. Mixed Reality (MR) headsets move with the user’s head and do not limit the user from using their hands. In contrast, handheld AR equipment must be adequately positioned with the user’s hands, potentially obstructing any simultaneous maintenance activities. The range of options available when interacting with BIM in an AR environment depends on the AR software being used. As a freely available software with limited features was used in the current study, it was not possible to view the texture or colour of the components in the model. Using this technique can be time-consuming and requires effort to achieve any level of accuracy in superimposing the model. This technique is not always feasible and can introduce alignment errors between the model and physical systems. Because the rotation and movement of the model in AR environment are completed by manipulating a sliding scale without defined values rather than with exact ratios, inaccuracies are common. For the model to be superimposed onto the physical building, the model needs to be aligned both horizontally and vertically using reference points and positioned on a horizontal flat surface before scaling can facilitate the superimposing process.

4.2 Current Limitations

A walk-through analysis of the model revealed that when the user moves through the space, the device loads only a particular section of the model within the user’s field of view. Due to this loading process, inaccuracies in placement of model components were noticed during walk-throughs. For example, Fig. 11.4 shows the shifted position of the vertical pipes when viewed from different viewpoints in the room. Such imprecise positioning can result in the misinterpretation of building information.

Fig. 11.4
figure 4

Floating graphics

Additional limitation is related to the type of data that could be viewed in AR, constrained to the geometrical design and pre-set information of the energy systems. The behaviour and performance of the system could not be identified or analysed in AR using the described approach. The presented approach is limited to visualisation of the static information of energy systems found in the BIM model. Not having the ability to visualise near real-time system information and the surrounding environmental information limits the possible uses of such visualisation systems. With commercial usage of AR currently being under development, a limited variety of BIM-AR software is available, and none were identified as specialising in building energy system visualisation.

5 Conclusion

BIM models integrated with AR can be used to effectively visualise energy systems in a building, provided that the model contains the necessary and relevant information. The use of such a visualisation framework can allow for the analysis of building systems and the collection of necessary information found in the BIM model. BIM and AR’s possible usage is still limited due to lack of real-time information and imprecise positioning during walk-throughs, which will be the subject of future work. The inclusion of near real-time data in BIM-AR visualisation techniques may improve understanding of system operation. Such integration framework will be explored in the future.