Abstract
While executing the project activities, it is often possible to reduce the duration of some of the activities leading to a reduction in the project makespan at the expense of additional costs. The resulting time/cost trade-off problem has been widely studied in the literature and is the focus of this Chapter. Direct and overhead/indirect project cost items are discussed, different time cost functions are introduced and used to define time-cost trade-off problems. In this context, project crashing, activity modes and multi-mode project scheduling are introduced. To solve the trade-off problems, we formulate mathematical models for well-known continuous and discrete time/cost trade-off problems.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Akkan, C., Drexl, A., & Kimms, A. (2005). Network decomposition-based benchmark results for the discrete time/cost trade-off problem. European Journal of Operational Research, 165(2), 339–358.
Badiru, A. B., & Pulat, S. P. (1995). Comprehensive project management. Upper Saddle River: Prentice Hall.
Chen, P. H., & Weng, H. (2009). A two-phase GA model for resource-constrained project scheduling. Automation in Construction, 18(4), 485–498.
De, P., Dunne, E. J., Ghosh, J. B., & Wells, C. E. (1995). The discrete time-cost tradeoff problem revisited. European Journal of Operational Research, 81(2), 225–238.
Demeulemeester, E. L., Herroelen, W. S., & Elmaghraby, S. E. (1996). Optimal procedures for the discrete time/cost trade-off problem in project networks. European Journal of Operational Research, 88(1), 50–68.
Demeulemeester, E., De Reyck, B., Foubert, B., Herroelen, W., & Vanhoucke, A. M. (1998). New computational results on the discrete time/cost trade-off problem in project networks. Journal of the Operational Research Society, 49(11), 1153–1163.
Elmaghraby, S. E. E., & Kamburowski, J. (1992). The analysis of activity networks under generalized precedence relations (GPRs). Management Science, 38(9), 1245–1263.
Hazır, Ö., Haouari, M., & Erel, E. (2010a). Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version. Computers and Operations Research, 37(4), 649–655.
Hazır, Ö., Haouari, M., & Erel, E. (2010b). Robust scheduling and robustness measures for the discrete time/cost trade-off problem. European Journal of Operational Research, 207(2), 633–643.
Içmeli, O., Erengüç, S. S., & Zappe, C. J. (1993). Project scheduling problems: A survey. International Journal of Operations and Production Management, 13(11), 80–91.
Klastorin, T. (2004). Project management: Tools and trade-offs. Hoboken: Wiley.
Larson, E. W., & Gray, C. F. (2018). Project management: The managerial approach (7th ed.). Irwin: McGraw-Hill.
Park, C. S. (2007). Contemporary engineering economics (4th ed.). Pearson Prentice Hall: Pearson Education.
Vanhoucke, M., & Debels, D. (2007). The discrete time/cost trade-off problem: Extensions and heuristic procedures. Journal of Scheduling, 10(4), 311–326.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2021 Springer Nature Switzerland AG
About this chapter
Cite this chapter
Ulusoy, G., Hazır, Ö. (2021). The Time/Cost Trade-off Problems. In: An Introduction to Project Modeling and Planning. Springer Texts in Business and Economics. Springer, Cham. https://doi.org/10.1007/978-3-030-61423-2_5
Download citation
DOI: https://doi.org/10.1007/978-3-030-61423-2_5
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-61422-5
Online ISBN: 978-3-030-61423-2
eBook Packages: Business and ManagementBusiness and Management (R0)