Skip to main content

Proactive Strategies for Soccer League Timetabling

  • Conference paper
  • First Online:
Operations Research Proceedings 2019

Part of the book series: Operations Research Proceedings ((ORP))

  • 1490 Accesses

Abstract

Due to unexpected events (e.g. bad weather conditions), soccer league schedules cannot always be played as announced before the start of the season. This paper aims to mitigate the impact of uncertainty on the quality of soccer league schedules. Breaks and cancellations are selected as two quality measures. Three proactive policies are proposed to deal with postponed matches. These policies determine where to insert so-called catch-up rounds as buffers in the schedule, to which postponed matches can be rescheduled.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Kendall, G., Knust, S., Ribeiro, C.C., Urrutia, S.: Scheduling in sports: An annotated bibliography. Comput. Oper. Res. 37, 1–9 (2010)

    Google Scholar 

  2. Rasmussen, R.V.: Scheduling a triple round robin tournament for the best Danish soccer league. Eur. J. Oper. Res. 185, 795–810 (2008)

    Google Scholar 

  3. Lambrechts, O., Demeulemeester, E., Herroelen, W.: Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities. J. Sched. 11, 121–136 (2008)

    Google Scholar 

  4. Van de Vonder, S., Demeulemeester, E., Herroelen, W.: Proactive heuristic procedures for robust project scheduling: An experimental analysis. Eur. J. Oper. Res. 189, 723–733 (2008)

    Google Scholar 

  5. Lu, Z., Xi, L.: A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time. Eur. J. Oper. Res. 207, 1327–1340 (2010)

    Google Scholar 

  6. Seidscher, A., Minner, S.: A Semi-Markov decision problem for proactive and reactive transshipments between multiple warehouses. Eur. J. Oper. Res. 230, 42–52 (2013)

    Google Scholar 

  7. Herroelen, W., Leus, R.: Project scheduling under uncertainty: Survey and research potentials. Eur. J. Oper. Res. 165, 289–306 (2005)

    Google Scholar 

  8. Goossens, D.R., Spieksma, F.C.: Soccer schedules in Europe: an overview. J. Sched. 15, 641–651 (2012)

    Google Scholar 

  9. Goossens, D., Spieksma, F.: Scheduling the Belgian soccer league. Interfaces 39, 109–118 (2009)

    Google Scholar 

  10. De Werra, D.: Scheduling in sports. In: Hansen, P. (ed.) Studies on Graphs and Discrete Programming, pp. 381–395. North-Holland, Amsterdam (1981)

    Google Scholar 

  11. Drexl, A., Knust, S.: Sports league scheduling: graph-and resource-based models. Omega 35(5), 465–71 (2007)

    Google Scholar 

  12. Forrest, D., Simmons, R.: New issues in attendance demand: The case of the English football league. J. Sports Econ. 7, 247–266 (2006)

    Google Scholar 

  13. Talla Nobibon, F., Goossens, D.: Are soccer schedules robust? In: 4th International Conference on Mathematics in Sport, pp. 120–134. Leuven (2013)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 The Editor(s) (if applicable) and The Author(s), under exclusive license to Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Yi, X., Goossens, D. (2020). Proactive Strategies for Soccer League Timetabling. In: Neufeld, J.S., Buscher, U., Lasch, R., Möst, D., Schönberger, J. (eds) Operations Research Proceedings 2019. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-030-48439-2_68

Download citation

Publish with us

Policies and ethics