Abstract
The proposed methodology can be used to more accurately analyze and predict project results. The methodology is based on the interaction of the method of evaluating the project’s timing and budget - PERT and the method of constructing a multivariate forecast of the dynamics of the external environment - the decision tree. The combination of these methods excludes their shortcomings separately. Thus, the proposed methodology visualizes the development of the project in a graphic way and includes a probabilistic assessment of the project scenarios. The relevance of the work is due to the fact that many projects are currently being implemented in various spheres of human life, but not all projects achieve their goals, including IT projects. According to The Standish Group, around the world last year $ 750 billion was spent on software development and implementation projects, and only 36% of projects were completed successfully, while 48% were only partially successful, i.e. went beyond budget or on time, and the remaining 16% failed. As a result, $ 120 billion was spent on failed projects of $ 750 billion.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Kachalov, R.M.: Management of economic risk: theoretical foundations and applications: monograph. Nestor-Istoriya, St. Petersburg, 248 p. (2012)
Risk analysis of an investment project. Risk Management, no. 3. pp. 18–20 (2002)
Chernov, V.B.: Risk analysis of an integrated investment project. Risk Management, no. 3. pp. 56–64 (2003)
Smolyak, S.A.: Assessment of the effectiveness of investment projects in conditions of risk and uncertainty. Theory of the Expected Effect, Nauka, 182 p. (2002)
Lepeshkina, M.N.: Methodological aspects of risk assessment. Management in Russia and Abroad, no. 6, pp. 88–98 (2001)
Sorokina, O.V.: Simulation modeling as a method of optimizing investment risks. In: Traditions, Innovations and Investments of a Modern Market Economy: Materials International Conference on Kazan, Part 2, pp. 351–355. Academy of Management “TISBI”, Kazan (2004)
Sekerin, A.B., Selyutin, V.D., Stroyev, S.P.: A fuzzy-plural model for managing the risk of economic insolvency of a manufacturing enterprise. Risk Management, no. 2, pp. 28–35 (2008)
Studenikina, S.A., Zaslavskaya, S.E.: The use of mathematical models in risk management. Modern problems of textile and light industry: abstracts of the Interuniversity. Scientific Conference Part 2, RosZITLP, 160 p. (2004)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Romanskaya, A., Berdnikov, A. (2020). Project Risk Management Methodology. In: Nechyporuk, M., Pavlikov, V., Kritskiy, D. (eds) Integrated Computer Technologies in Mechanical Engineering. Advances in Intelligent Systems and Computing, vol 1113. Springer, Cham. https://doi.org/10.1007/978-3-030-37618-5_36
Download citation
DOI: https://doi.org/10.1007/978-3-030-37618-5_36
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-37617-8
Online ISBN: 978-3-030-37618-5
eBook Packages: EngineeringEngineering (R0)