The performance of labour is one of the factors that contribute to the success of the construction project. Labour productivity alone has been ascribed the sole measure of poor project performance without an examination of factors giving rise to this claim. Furthermore, there is limited research that examines the primary factors affecting labour productivity in the context of South African construction industry. This study examines the contextual factors affecting labour productivity on construction projects and whether there are key factors that impact on labour productivity on construction projects. The aim of this study will be achieved through a review of literature pertinent to contextual factors impacting labour productivity on construction projects. Additionally, a distribution of a questionnaire survey to construction companies listed on the cidb Register of Contractors in the grades 2–6. It emerged from the study of extant literature that delays in delivery of material, inspection delays from engineers, change orders from designers/consultants, lack of experience amongst workers and mismanagement of resources on site, critically and negatively impact on labour productivity on construction projects. This examination of contextual factors that affect labour productivity provides necessary information for use by construction organisations in implementing measures to properly address issues pertaining to poor labour productivity on construction projects. Based on these findings, the study recommends that construction organisations create a database that clusters contextual factors per region/location of the project. This is to ensure that the critical factors such as inadequate supervision and remuneration disputes that impact on the performance of labour are addressed, while those that are out of the organisation’s control such as shortage of materials and industrial action are planned for at the pre-construction phase of the project. Further studies that investigate the contextual factors impacting on labour productivity, using empirical data is recommended.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Barbosa, F., Woetzel, J., Mischke, J., Ribeirinho, M.J., Sridhar, M., Parsons, M., et al.: Reinventing Construction: A Route to Higher Productivity. McKinsey Global Institute, New York (2017)

    Google Scholar 

  2. Dzadaza, B., Crafford, G.: Artisan’s perceptions of factors affecting construction labour productivity on building sites. In: Fourth NMMU Construction Management Conference proceedings, Port Elizabeth, South Africa, pp. 335–344, 30th November–1st December 2015

    Google Scholar 

  3. Soekiman, A., Pribadi, K.S., Soemardi, B.W., Wirahadikusumah, R.D.: Factors relating to labour productivity affecting the project schedule performance in Indonesia. Procedia Eng. 14, 865–873 (2011)

    Article  Google Scholar 

  4. Baloyi, L., Bekker, M.: Causes of construction cost and time overruns: the 2010 FIFA world cup stadia in South Africa. Acta Structilia 18(1), 51–67 (2011)

    Google Scholar 

  5. Alinaitwe, H., Mwakali, J., Hansson, B.: Labour productivity in the building industry. In: Understanding the Construction Business and Companies in the New Millennium, pp. 210–220 (2005)

    Google Scholar 

  6. Durdyev, S., Mbachu, J.: On-site labour productivity of New Zealand construction industry: key constraints and improvement measures. Constr. Econ. Build. 11(3), 18–33 (2011)

    Article  Google Scholar 

  7. OECD: Measuring Productivity - Measurement of Aggregate and Industry-Level Productivity Growth - OECD Manual Organisation of Economic Cooperation and Development, Paris (2001)

    Google Scholar 

  8. Tran, V., Tookey, J.: Labour productivity in the New Zealand construction industry: a thorough investigation. Australas. J. Constr. Econ. Build. 11(1), 41–60 (2011)

    Google Scholar 

  9. Moselhi, O., Khan, Z.: Significance ranking of parameters impacting construction labour productivity. Constr. Innov. 12(3), 272–296 (2012)

    Article  Google Scholar 

  10. Yi, W., Chan, A.P.C.: Critical review of labour productivity research in construction journals. J. Manag. Eng. 30(2), 214–225 (2014)

    Article  Google Scholar 

  11. cidb: Labour & Work Conditions in the South African Construction Industry - Status and Recommendations (2015)

    Google Scholar 

  12. cidb: Construction Monitor, Employment Q3 (2017). http://www.cidb.org.za/publications/Documents/Construction%20Monitor%20-%20October%202015.pdf

  13. Abdul-Rahman, H., Berawi, M.A., Berawi, A.R., Mohamed, O.: Delay mitigation in the Malaysian construction industry. J. Constr. Eng. Manag. 132(2), 125–133 (2006)

    Article  Google Scholar 

  14. Merrifield, A.: The Role of the Construction Industry in the Delivery of Infrastructure Mandate for Change 1994–1999. HSRC Publishers, Pretoria (1999)

    Google Scholar 

  15. Ofori, G., Hindle, R., Hugo, F.: Improving the construction industry of South Africa: a strategy. Habitat Int. 20(2), 203–220 (1996)

    Article  Google Scholar 

  16. Jang, H., Kim, K., Kim, J., Kim, J.: Labour productivity model for reinforced concrete construction projects. Constr. Innov. 1(1), 92–113 (2011)

    Article  Google Scholar 

  17. Juga, A.J., Hens, N., Osman, N., Aerts, M.: A flexible method to model HIV serodiscordance among couples in Mozambique. PLoS ONE 12(3), e0172959 (2017)

    Article  Google Scholar 

  18. Park, H.-S.: Conceptual framework of construction productivity estimate. J. Civ. Eng. 10(5), 311–317 (2006)

    Google Scholar 

  19. Hughes, R., Thorpe, D.: A review of enabling factors in the construction industry in an Australian environment. Constr. Innov. 14(2), 210–228 (2014)

    Article  Google Scholar 

  20. Enshassi, A., Mohamed, S., Mustafa, Z.A., Mayer, P.E.: Factors affecting labour productivity in building projects in the Gaza Strip. J. Civ. Eng. Manag. 13(4), 245–254 (2007)

    Article  Google Scholar 

  21. Kadir, M.R.A., Lee, W.P., Jafaar, M.S., Sapuan, S.M., Ali, A.A.A.: Factors affecting construction labour productivity for Malaysian residential projects. Struct. Surv. 23(1), 42–54 (2005)

    Article  Google Scholar 

  22. Mawdesley, M.J., AL-Jibouri, S.: Modelling construction project productivity using systems dynamics approach. Int. J. Prod. Perform. Manag. 59(1), 18–38 (2009)

    Article  Google Scholar 

  23. Xia, B., Chan, A.B.C.: Measuring complexity for building projects: a Delphi study. Eng. Constr. Archit. Manag. 19(1), 7–24 (2012)

    Article  Google Scholar 

  24. Alinaitwe, H.M., Mwakali, J.A., Hansson, B.: Factors affecting the productivity of building craftsmen - studies of Uganda. J. Civ. Eng. Manag. 13(3), 169–176 (2007)

    Article  Google Scholar 

  25. Ulubeyli, S., Kazaz, A., Er, B.: Planning engineers’ estimates on labor productivity: theory and practice. Procedia – Soc. Behav. Sci. 119, 12–19 (2014)

    Article  Google Scholar 

  26. Fugar, F.D., Agyakwah-Baah, A.B.: Delays in building construction projects in Ghana. Constr. Econ. Build. 10(2), 103–116 (2010)

    Google Scholar 

  27. Jarkas, A.M.: Factors influencing labour productivity in Bahrain’s construction industry. Int. J. Constr. Manag. 15(1), 94–108 (2015)

    Google Scholar 

  28. Doloi, H.: Analysing the novated design and construct contract from client’s, design team’s and contractor’s perspective. Constr. Manag. Econ. 26, 1181–1196 (2008)

    Article  Google Scholar 

  29. Kaming, P.F., Olomolaiye, P.O., Holt, G.D., Harris, F.C.: Factors influencing craftsmen’s productivity in Indonesia. Int. J. Project Manage. 15(1), 21–30 (1997)

    Article  Google Scholar 

Download references

Acknowledgements

This study was in part financed by the National Research Foundation (NRF). Additionally, the opinions expressed in this paper and the derived conclusions are those of the authors and not attributed to NRF.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mochelo Lefoka .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Lefoka, M., Windapo, A. (2020). An Examination of Contextual Factors that Cause Variations in Labour Productivity. In: Aigbavboa, C., Thwala, W. (eds) The Construction Industry in the Fourth Industrial Revolution. CIDB 2019. Springer, Cham. https://doi.org/10.1007/978-3-030-26528-1_35

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-26528-1_35

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-26527-4

  • Online ISBN: 978-3-030-26528-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics