Abstract

Efforts of the lean construction could prove to be highly worthwhile for the South African construction sector. Evidently exposed continuous poor performance of projects exhibit that the concept of lean thinking would push the construction industry’s pursuit to advance quality and efficiency. While numerous countries internationally gained large benefits by adopting Lean Construction (LC) concepts, there still seems to be inadequate application of lean in South African construction industry, over the last two decades. A number of structural and cultural barriers appear to be militating against the successful implementation of lean construction. By not recognizing the factors that contribute to the successful application of LC, organizations will not be able to know what improvement efforts need to be made, where these efforts should be focused, or which efforts could obtain best results. For this reason, this study sought to identify and assess the possible barriers to the successful implementation of LC in South Africa. Grounded on a systematic literature review, followed by semi-structured interviews with Lean experts in the country, a number of barriers were acknowledged as significant barriers. Further investigation discovered that policy changes and cultural change are some of the barriers exposed as significant. The results of this study could be employed to help researchers, practitioners and companies in South African construction industry to focus their attention and resources on the significant issues, crucial to support the successful implementation of LC.

Keywords

Lean Challenges Barriers Implementation 

References

  1. 1.
    Abdullah, S., Abdul-Razak, A., Abubakar, A., Mohammad, I.: Towards producing best practice in the Malaysian construction industry: the barriers in implementing the Lean Construction Approach. Faulty of Engineering and Geoinformation science, Universiti Teknologi, Malaysia (2009)Google Scholar
  2. 2.
    Alarcón, L.F., Diethelm, S., Rojo, O.: Collaborative implementation of lean planning systems in Chilean construction companies. In: Tenth Annual Conference of the International Group for Lean Construction (IGLC-10), August, Brazil, pp. 1–11 (2002)Google Scholar
  3. 3.
    Alinaitwe, H.M.: Prioritising lean construction barriers in Uganda’s construction industry. J. Constr. Dev. Countries 14, 15–30 (2009)Google Scholar
  4. 4.
    Alsehaimi, A., Tzortzopoulos Fazenda, P., Koskela, L.: Improving construction management practice with the Last Planner System: a case study. Eng. Constr. Architect. Manage. 21, 51–64 (2014)CrossRefGoogle Scholar
  5. 5.
    Asri, M., Naim, M.A., Nawi, M., Nasrun, M.: Actualizing lean construction: barriers toward the implementation. Adv. Environ. Biol. 9, 172–174 (2015)Google Scholar
  6. 6.
    Ayarkwa, J., Agyekum, K., Adinyira, E., Osei-Asibey, D.: Barriers to successful implementation of lean construction in the Ghanaian building industry (2012)Google Scholar
  7. 7.
    Aziz, R.F., Hafez, S.M.: Applying lean thinking in construction and performance improvement. Alexandria Eng. J. 52, 679–695 (2013)CrossRefGoogle Scholar
  8. 8.
    Babalola, O., Ibem, E.O., Ezema, I.C.: Implementation of lean practices in the construction industry: a systematic review. Build. Environ. 148, 34–43 (2019)CrossRefGoogle Scholar
  9. 9.
    Bajjou, M., Chafi, A., Ennadi, A., El Hammoumi, M.: The practical relationships between lean construction tools and sustainable development: a literature review. J. Eng. Sci. Technol. Rev. 10, 170–177 (2017)CrossRefGoogle Scholar
  10. 10.
    Ballard, G.: The lean project delivery system: an update. Lean Constr. J. 1–19 (2008)Google Scholar
  11. 11.
    Ballard, G., Howell, G.: Lean project management. Build. Res. Inf. 31, 119–133 (2003)CrossRefGoogle Scholar
  12. 12.
    Ballard, G., Reiser, P.: The St. Olaf College Fieldhouse Project: a case study in designing to target cost. In: 12th Annual Conference of the International Group for Lean Construction, pp. 234–249 (2004)Google Scholar
  13. 13.
    Barnett-Page, E., Thomas, J.: Methods for the synthesis of qualitative research: a critical review. BMC Med. Res. Methodol. 9, 59 (2009)CrossRefGoogle Scholar
  14. 14.
    Bashir, A.M., Suresh, S., Proverbs, D.G., Gameson, R.: Barriers towards the sustainable implementation of lean construction in the United Kingdom construction organisations. In: ARCOM Doctoral Workshop, p. 1 (2010)Google Scholar
  15. 15.
    Brady, D.A., Tzortzopoulos, P., Rooke, J.: An examination of the barriers to last planner implementation (2011)Google Scholar
  16. 16.
    Cano, S., Delgado, J., Botero, L., Rubiano, O.: Barriers and success factors in lean construction implementation: survey in pilot context. In: Annual Conference of the International Group for Lean Construction (2015)Google Scholar
  17. 17.
    Cherrafi, A., Elfezazi, S., Garza-Reyes, J.A., Benhida, K., Mokhlis, A.: Barriers in green lean implementation: a combined systematic literature review and interpretive structural modelling approach. Prod. Plan. Control 28, 829–842 (2017)CrossRefGoogle Scholar
  18. 18.
    Choudhry, R.M., Hinze, J.W., Arshad, M., Gabriel, H.F.: Subcontracting practices in the construction industry of Pakistan. J. Constr. Eng. Manage. 138, 1353–1359 (2012)CrossRefGoogle Scholar
  19. 19.
    Cudney, E., Elrod, C.: Incorporating lean concepts into supply chain management. Int. J. Six Sigma Competitive Advantage 6, 12–30 (2010)CrossRefGoogle Scholar
  20. 20.
    Denyer, D., Tranfield, D.: Producing a Systematic Review. The Sage Handbook of Organizational Research Methods, pp. 671–689 (2009)Google Scholar
  21. 21.
    Dulaimi, M.F., Tanamas, C.: The principles and applications of lean construction in Singapore. In: 9th International Group for Lean Construction (2001)Google Scholar
  22. 22.
    Elazouni, A.M., Metwally, F.G.: D-SUB: decision support system for subcontracting construction works. J. Constr. Eng. Manage. 126, 191–200 (2000)CrossRefGoogle Scholar
  23. 23.
    Forbes, L.H., Ahmed, S.: Adapting lean construction methods for developing nations. In: Second LACCEI International Latin America and Carribean Conference for Engineering and Technology (LACCEI 2004), Challenges and Opportunities for Engineering Education, Research and Development, pp. 2–4 (2004)Google Scholar
  24. 24.
    Hamzeh, F., Kallassy, J., Lahoud, M., Azar, R.: The first extensive implementation of lean and LPS in Lebanon: results and reflections. In: Proceedings of the 24th Annual Conference of the International Group for Lean Construction, Boston, USA (2016)Google Scholar
  25. 25.
    Howell, G., Ballard, G.: Implementing lean construction: understanding and action. Proceedings of 6th Annual Conference of the International Group for Lean Construction (1998)Google Scholar
  26. 26.
    Jara, C., Alarcón, L.F., Mourgues, C.: Accelerating interactions in project design through extreme collaboration and commitment management–a case study. Proceedings of 17th Annual Conference of the International Group for Lean Construction (IGLC-17) (2009)Google Scholar
  27. 27.
    Johansen, E., Glimmerveen, H., Vrijhoef, R.: understanding lean construction and how it penetrates the industry: a comparison of the dissemination of lean within the UK and the Netherlands. In: Proceedings of 10th Annual Conference of the International Group for Lean Construction, Gramado, Brazil, pp. 6–8 (2002)Google Scholar
  28. 28.
    Johansen, E., Walter, L.: Lean construction: prospects for the German construction industry. Lean Constr. J. 3, 19–32 (2007)Google Scholar
  29. 29.
    Jørgensen, B., Emmitt, S.: Investigating the integration of design and construction from a “lean” perspective. Constr. Innov. 9, 225–240 (2009)CrossRefGoogle Scholar
  30. 30.
    Kim, D., Park, H.-S.: Innovative construction management method: Assessment of lean construction implementation. KSCE J. Civ. Eng. 10, 381–388 (2006)CrossRefGoogle Scholar
  31. 31.
    Kitchenham, B., Charters, S.: Guidelines for performing systematic literature reviews in software engineering (2007)Google Scholar
  32. 32.
    Koskela, L.: Application of the New Production Philosophy to Construction, Stanford University Stanford (1992)Google Scholar
  33. 33.
    Koskela, L.: An exploration towards a production theory and its application to construction, VTT Technical Research Centre of Finland (2000)Google Scholar
  34. 34.
    Krafcik, J.F.: Triumph of the lean production system. MIT Sloan Manage. Rev. 30, 41 (1988)Google Scholar
  35. 35.
    Miller, C.J., Packham, G.A., Thomas, B.C.: Harmonization between main contractors and subcontractors: a prerequisite for lean construction? J. Constr. Res. 3, 67–82 (2002)CrossRefGoogle Scholar
  36. 36.
    Millet, J.: A blueprint for modern infrastructure delivery: why things go wrong and how to put it right. Mace Insights Report (2019)Google Scholar
  37. 37.
    Mossman, A.: Why isn’t the UK construction industry going lean with gusto? Lean Constr. J. 1–19 (2009)Google Scholar
  38. 38.
    Movaghar, E.M.: Identifying the Barriers of Implementing Lean Construction Principals in Developing Countries. Middle East Technical University (2016)Google Scholar
  39. 39.
    Nahmens, I., Ikuma, L.H.: An empirical examination of the relationship between lean construction and safety in the industrialized housing industry. Lean Constr. J. 1–19 (2009)Google Scholar
  40. 40.
    Nguyen, V.-H., Chang, L.-M.: Work structuring and the feasibility of application to construction projects in Vietnam. World Acad. Sci. Eng. Technol. Int. Sci. Index 62, 662–670 (2012)Google Scholar
  41. 41.
    Nicolini, D., Tomkins, C., Holti, R., Oldman, A., Smalley, M.: Can target costing and whole life costing be applied in the construction industry?: evidence from two case studies. Br. J. Manage. 11, 303–324 (2000)CrossRefGoogle Scholar
  42. 42.
    Olatunji, J.: Lean-in-Nigerian construction: state, barriers, strategies and “Go to-Gemba” approach. In: Proceedings 16th Annual Conference of the International Group for Lean Construction, Manchester, UK (2008)Google Scholar
  43. 43.
    Oviedo-Haito, R.J., Jiménez, J., Cardoso, F.F., Pellicer, E.: Survival factors for subcontractors in economic downturns. J. Constr. Eng. Manage. 140, 04013056 (2013)CrossRefGoogle Scholar
  44. 44.
    Sarhan, S., Fox, A.: Barriers to implementing lean construction in the UK construction industry. Built Hum. Environ. Rev. 1–19 (2013)Google Scholar
  45. 45.
    Shang, G., Sui Pheng, L.: Barriers to lean implementation in the construction industry in China. J. Technol. Manage. China 9, 155–173 (2014)CrossRefGoogle Scholar
  46. 46.
    Stewart, R.A., Mohamed, S., Marosszeky, M.: An empirical investigation into the link between information technology implementation barriers and coping strategies in the Australian construction industry. Constr. Innov. 4, 155–171 (2004)CrossRefGoogle Scholar
  47. 47.
    Tam, V.W., Shen, L., Kong, J.S.: Impacts of multi-layer chain subcontracting on project management performance. Int. J. Project Manage. 29, 108–116 (2011)CrossRefGoogle Scholar
  48. 48.
    Tezel, A., Nielsen, Y.: Lean construction conformance among construction contractors in Turkey. J. Manage. Eng. 29, 236–250 (2012)CrossRefGoogle Scholar

Copyright information

© Springer Nature Switzerland AG 2020

Authors and Affiliations

  • Thabiso Monyane
    • 1
    • 2
    Email author
  • Fidelis Emuze
    • 1
  • Bankole Awuzie
    • 1
  • Gerrit Crafford
    • 2
  1. 1.Department of Built EnvironmentCentral University of Technology, FSBloemfonteinSouth Africa
  2. 2.Department of Quantity SurveyingNelson Mandela UniversityPort ElizabethSouth Africa

Personalised recommendations