Skip to main content

Sustainable Project Delivery of Public Procurement Projects: Contractor Selection Procedure

  • Conference paper
  • First Online:
The Construction Industry in the Fourth Industrial Revolution (CIDB 2019)

Abstract

Selecting a competent contractor is a yardstick for sustainable project delivery. It ensures the project is completed within time, cost and quality standard. This study assesses the procedure of Nigeria’s public procurement Act of 2007 and identifies the frequency of use of prequalification criteria. The research is both exploratory and quantitative in nature. The population for the quantitative study was public clients and consulting organization. Stratified random sampling technique was used. The sample size was calculated using Cochran formula. A total of 300 questionnaires were distributed using Cochran formula to generate the sample size. From the sample size calculated, 196 were from consulting firms and 31 from public clients’ organization. Statistical Package for Social Science (SPSS) 21st version was used to analyse the data using frequency, percentage, relative importance index (RII) and t-test. There was an agreement between public clients’ and consultant organisation on the frequency of use of contractors’ prequalification criteria. In conclusion, it is important to consider the method of procurement, size of the project and complexity of the project to ensure the optimum balance of experience, positive references, working chemistry and teamwork.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Idiake, J.E., Shittu, A.A., Anunobi, A.I., Akanmu, W.P.: A comparative analysis of Traditional and Design & Build method of procurement in the Nigerian construction Industry. Int. J. Constr. Eng. Manage. 4(1), 1–12 (2015)

    Google Scholar 

  2. Khodadadi, S.A.T., Kumar, B.D.: Contractor selection with risk assessment by using AHP Fuzzy method. Int. J. Adv. Eng. Technol. 5(2), 311–318 (2013)

    Google Scholar 

  3. Udensi, C.U.: Problems in the implementation of due process. In: Proceedings of the 35th Annual General Meeting/Conference of Nigeria Institute of Building (NIOB) at Abia State, 10th–14th August 2005 (2005)

    Google Scholar 

  4. Wong, C.H., Holt, G.D.: Developing a contractor classification model using a multivariate discriminant analysis approach. RICS Found. Res. Pap. Ser. 4(20), 1–23 (2004)

    Google Scholar 

  5. Salama, M., El Aziz, H.A., El Sawah, H., El Samadony, A.: Investigating the criteria for contractors’ selection and bid evaluation in Egypt. In: Boyd, D. (ed.) Proceeding 22nd Annual ARCOM Conference, 4–6 September 2006, Birmingham, UK, Association of Researchers in Construction Management, pp. 531–540 (2006)

    Google Scholar 

  6. Awal, S.M.: Contractor Selection in Ghana. Unplished postgraduate thesis at Kwame Nkrumah University, Department of Building, Accra, Ghana (2010)

    Google Scholar 

  7. Holt, G.D.: Which contractor selection methodology? Int. J. Project Manage. 16(3), 153–164 (1998)

    Article  Google Scholar 

  8. Wong, C.H., Nicholas, J., Holt, G.D.: Using multivariate techniques for developing contractor classification models. Eng. Constr. Architect. Manage. 10(2), 99–116 (2003)

    Article  Google Scholar 

  9. Topeu, Y.I.: A decision model proposal for construction contractor selection in Turkey. Build. Environ. 39, 469–481 (2004)

    Article  Google Scholar 

  10. Zavadskas, E.K., Vilutiene, T., Turskis, Z., Tamosaitiene, J.: Contractor selection for construction works by applying SAW – G and Topsis Grey techniques. J. Bus. Econ. Manage. 11(1), 34–55 (2010)

    Article  Google Scholar 

  11. Ng, S.T., Smith, N.J., Skitmore, Martin: A case based reasoning model for contractor prequalification. Int. J. Constr. Inf. Technol. 6(10), 47–61 (1998)

    Google Scholar 

  12. Xiao, H.: An analysis of the selection of project contractor in the construction management process. Int. J. Bus. Manage. 6(3), 184–189 (2011)

    Google Scholar 

  13. Cristobal, J.R.S.: Contractor selection using multi criteria decision making methods. J. Constr. Eng. Manage. 138(6), 751–758 (2012)

    Article  Google Scholar 

  14. Hatush, Z., Skitmore, M.: Contractor selection using multi - criteria utility theory: an additive model. Build. Environ. 33(2–3), 105–115 (1998)

    Article  Google Scholar 

  15. Lagos Population (2018). http://populationof2018.com. Accessed 28 Feb 2019

  16. Aderemi, A.E., Oyeyemi, B.F.: Legal redress for losses sustained through building collapse in Nigeria, BF, pp. 1–17 (2006)

    Google Scholar 

  17. Campbell, J.: Africa’s new biggest city: Lagos, Nigeria (2012). http://www.TheAtlantic.Com/international/. Accessed 9 Oct 2014

  18. Adelekan, I.: Private sector investment decisions in building and construction: increasing, managing and transferring risks; case study of Lagos, Nigeria. Background paper prepared for the Global assessment report on disaster risk reduction, Geneva, Switzerland (2013)

    Google Scholar 

  19. Asika, N.: Research Methodology in the Behavioural Sciences. Longman Nigeria Plc, Lagos (2002)

    Google Scholar 

  20. Field, A.: Discovering Statistics Using SPSS. Sage Publication Ltd, London (2009)

    MATH  Google Scholar 

  21. Mangitung, D.M., Emsley, M.W.: Decision criteria for periodic prequalification in the UK construction industry. In: Proceedings of the RICS foundation construction and building research conference, Nottingham Trent University, 5–6 September, pp. 1–13 (2002)

    Google Scholar 

  22. Ajayi, O.M.: Multi-criteria decision making model for contractor selection for construction projects in Nigeria. In: West Africa Built Environment Research (WABER) Conference, 27–28 July, Accra, Ghana, pp. 74–81 (2010)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Oluwaseyi Ajayi .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Akanmu, J., Ajayi, O., Akinsiku, O. (2020). Sustainable Project Delivery of Public Procurement Projects: Contractor Selection Procedure. In: Aigbavboa, C., Thwala, W. (eds) The Construction Industry in the Fourth Industrial Revolution. CIDB 2019. Springer, Cham. https://doi.org/10.1007/978-3-030-26528-1_32

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-26528-1_32

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-26527-4

  • Online ISBN: 978-3-030-26528-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics