The process of managing energy complexes involves organizing the interaction of various structures with different organizational and legal status. In this case, the usual methods of administrative influence, as a rule, do not work, since the objects of management may not have a common system of subordination, and then you have to use economic levers, one of which is the incentive mechanisms. The problems of synthesis of optimal systems of group stimulation are considered. There is a project of n works. A plan has been defined for reducing the duration of the program, according to which the magnitude of the reduction of its duration is determined for each project. The cost of reducing the duration linearly depends on the magnitude of the reduction. The incentive system is designed to offset these costs. In this case, using the well-known set of incentive systems, new, more complex incentive systems can be obtained, which is why these elementary incentive systems are called basic ones. In the system of group incentives, all projects are divided into m groups, and each group has its own incentive system. Two possible incentive systems for groups are considered: unified linear and unified hopping. The task is to determine the division of projects into groups and select the incentive system for each group so that the total fund for cost compensation is minimal. The methods for solving the tasks are proposed. A further generalization of the problem is considered, when the set of works included in one group can be arbitrary. For this case, a heuristic rule is proposed, on the basis of which the solution algorithm is constructed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Novikov, D.A.: Incentive in Organizational Systems. SINTEG, Moscow (2003)
Novikov, D.A., Tsvetkov, A.V.: Incentive Mechanisms in Multi-element Organizational Systems. Apostrophe, Moscow (2000)
Vasilyeva, O.N., Zaskanov, V.V., Ivanov, D.Yu., Novikov, D.A.: Models and Methods of Material Incentives (Theory and Practice). KomKniga, Moscow (2006)
Yu, A.D.: The task of scheduling the work of teams of specialists. Sci. Pract. J. Econ. Manag. Syst. 4.3(30), 304–311 (2018)
Yu, A.D., Amelina, K.E.: Tasks of scheduling by criterion of maximization of the total weighed volume of the performed works. Control Syst. Inf. Technol. Sci. Tech. J. 4(74), 20–26 (2018)
Barkalov, S.A., Kurochka, P.N.: Model for determining the term of execution of sub-conflicting works. In: Proceedings of 2017 Tenth International Conference on Management of Large-Scale System Development (MLSD), 8109598 (2017)
Kravets, O.J., Podvalny, E.S., Barkalov, S.A.: Quality assessment of a multistage process in the case of continuous response functions from resource influences. Autom. Remote Control 76(3), 500–506 (2015)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this paper
Cite this paper
Barkalov, S., Burkov, V., Kurochka, P. (2019). Designing Systems of Group Stimulation in the Management of Energy Complex Objects. In: Murgul, V., Pasetti, M. (eds) International Scientific Conference Energy Management of Municipal Facilities and Sustainable Energy Technologies EMMFT 2018. EMMFT-2018 2018. Advances in Intelligent Systems and Computing, vol 983. Springer, Cham. https://doi.org/10.1007/978-3-030-19868-8_6
Download citation
DOI: https://doi.org/10.1007/978-3-030-19868-8_6
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-19867-1
Online ISBN: 978-3-030-19868-8
eBook Packages: Intelligent Technologies and RoboticsIntelligent Technologies and Robotics (R0)