Skip to main content

Description of SBG Assembling and Casting-Penang Bridge

  • Chapter
  • First Online:
Precast Segmental Box Girders

Abstract

This chapter presents a brief description on precast segmental box girders technology of the longest South-East Asia Bridge in Penang, Malaysia followed by the construction process in terms of SBG Casting, SBG Transporting, and SBG Erecting. It highlights the importance of performing experimental static load test in construction of segmental bridges before it can be opened to the public. This chapter also notes the comparison between the period of assembly of the bridge superstructure to the cast-in-place construction.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. J. Clarke, in Quality of Segmental Box Girder—Solving Issues During Construction. 2nd International Seminar on the Design and Construction of the Second Penang Bridge. (Jambatan Kedua Ptd. Ltd., Sunway Putra Hotel, Kuala Lumpur, Malaysia, 2012)

    Google Scholar 

  2. A. Forouzani, Penang Second Crossing Package 2: Box Girder Decks. Technical Paper 4. (Jambatan Kedua Ptd. Ltd, Malaysia, 2011)

    Google Scholar 

  3. P.D. Kanapathy, in Project Planning for SBG Production and Launching Works. 2nd International Seminar on the Design and Construction of the Second Penang Bridge. (Jambatan Kedua Ptd. Ltd., Sunway Putra Hotel, Kuala Lumpur, Malaysia, 2012)

    Google Scholar 

  4. K. Kumar, K. Varghese, K.S. Nathan, K. Ananthanarayanan, in Automated Geometry Control of Precast Segmental Bridges. The 25th International Symposium on Automation and Robotics in Construction, vol. 26. (2008)

    Google Scholar 

  5. B. Levintov, Construction equipment for concrete box girder bridges. Concr. Int. 17(2), 43–47 (1995)

    Google Scholar 

  6. M.I. Taib, PB2X Construction Challenges—Second Penang Bridge. The Ingenieur. (Board of Engineers, Malaysia, 2013)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Fadzli Mohamed Nazri .

Rights and permissions

Reprints and permissions

Copyright information

© 2019 The Author(s), under exclusive license to Springer Nature Switzerland AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Mohamed Nazri, F., Mohd Yusof, M., Kassem, M. (2019). Description of SBG Assembling and Casting-Penang Bridge. In: Precast Segmental Box Girders. SpringerBriefs in Applied Sciences and Technology. Springer, Cham. https://doi.org/10.1007/978-3-030-11984-3_1

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-11984-3_1

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-11983-6

  • Online ISBN: 978-3-030-11984-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics