Abstract
Optimization of hydroelectric power production is often executed for river systems consisting of several powerplants and reservoirs located in the same region. For hydropower stations located along the same river, the release from upstream reservoirs ends up as inflows to downstream stations. Calculating marginal cost for a string of powerplants with limited reservoir capacity between them, requires a new approach compared to heuristically calculating marginal cost for single plants in well-regulated hydrological systems. A new method, using marginal cost curves for individual powerplants to generate an overall marginal cost curve for interlinked power stations has been developed. Results based on a real-world case study demonstrate the advantage of the proposed method in terms of solution quality, in addition to significant insight into how optimal load distribution should be executed in daily operations.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Fosso, O.B., Belsnes, M.M.: Short-term hydro scheduling in a liberalized power system. In: Proceedings of 2004 International Conference on Power System Technology - POWERCON, vols. 1 and 2, pp. 1321–1326 (2004)
Mo, B., Gjelsvik, A., Grundt, A.: Integrated risk management of hydropower scheduling and contract management. IEEE Trans. Power Syst. 16, 216–221 (2001)
Hveding, V.: Digital simulation techniques in power system planning. Econ. Plan. 8(1), 118–139 (1968)
Forsund, F.: Hydropower Economics, 2nd edn. International Series in Operations Research & Management Science), vol. 112, pp. 71–76. Springer US, Boston (2015)
Hamann, A., Hug, G., Rosinski, S.: Real-time optimization of the mid-columbia hydropower system. IEEE Trans. Power Syst. 32(1), 157–165 (2017)
Nilsson, O., Sjelvgren, D.: Mixed-integer programming applied to Short term planning of a hydro-thermal system. IEEE Trans. Power Syst. 11(1), 281–286 (1996)
Aasgard, E.K., Andersen, G.S., Fleten, S.E., et al.: Evaluating a stochastic-programming-based bidding model for a multireservoir system. IEEE Trans. Power Syst. 29(4), 1748–1757 (2014)
Skjelbred, H.I., Kong, J., Larsen, T.J., Kristiansen, F.: Operational use of marginal cost curves for hydropower plants as decision support in real-time balancing markets. In: 2017 14th International Conference on the European Energy Market (EEM), pp. 1–6 (2017). ISSN 2165-4093
Wolfgang, O., Haugstad, A., Mo, B., Gjelsvik, A., Wangensteen, I., Doorman, G.: Hydro reservoir handling in Norway before and after deregulation. Energy 34(10), 1642–1651 (2009)
Brovold, S.H., Skar, C., Fosso, O.B.: Implementing hydropower scheduling in a european expansion planning model. Energy Procedia 58, 117–122 (2014)
Gjelsvik, A., Mo, B., Haugstad, A.: Long- and medium-term operations planning and stochastic modelling in hydro-dominated power systems based on stochastic dual dynamic programming. In: Handbook of Power Systems I, pp. 33–56, Springer, Heidelberg (2010)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this paper
Cite this paper
Riddervold, H.O., Skjelbred, H.I., Kong, J., Elvetun, O.L., Korpås, M. (2019). Optimal Pricing of Production Changes in Cascaded River Systems with Limited Storage. In: Helseth, A. (eds) Proceedings of the 6th International Workshop on Hydro Scheduling in Competitive Electricity Markets. HSCM 2018. Springer, Cham. https://doi.org/10.1007/978-3-030-03311-8_7
Download citation
DOI: https://doi.org/10.1007/978-3-030-03311-8_7
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-03310-1
Online ISBN: 978-3-030-03311-8
eBook Packages: EnergyEnergy (R0)