Abstract
In this chapter, simple models where only two latent variables intervene are described, in which the main objective is to find the relationship between them, as well as their dependence level. In addition, only three simple models from two variables are presented, therefore, some tables are developed including a summary that allows observing all the relationships from each of the bivariate latent variables, where the independent variable, the dependent variable, the beta value for each relationship, the p-value, and the R-square value as a measure of the explained variance are illustrated. Also, a series of industrial implications and conclusions are reported.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Ahmad MF, Zakuan N, Jusoh A, Takala J (2012) Relationship of TQM and business performance with mediators of SPC, lean production and TPM. Procedia Soc Behav Sci 65:186–191. https://doi.org/10.1016/j.sbspro.2012.11.109
Ahmadzadeh F, Bengtsson M (2017) Using evidential reasoning approach for prioritization of maintenance-related waste caused by human factors—a case study. Int J Adv Manufact Technol 90(9):2761–2775. https://doi.org/10.1007/s00170-016-9377-7
Akroyd D, Legg J, Jackowski MB, Adams RD (2009) The impact of selected organizational variables and managerial leadership on radiation therapists’ organizational commitment. Radiography 15(2):113–120. https://doi.org/10.1016/j.radi.2008.05.004
Alfonso JG, Mara M (2016) Rewards for continuous training: a learning organisation perspective. Ind Commercial Train 48(5):257–264. https://doi.org/10.1108/ICT-11-2015-0076
Alipour FH (2011) The relationship between organizational climate and communication skills of managers of the Iranian physical education organization. Procedia Soc Behav Sci 30:421–428. https://doi.org/10.1016/j.sbspro.2011.10.083
Anand A, Singhal S, Panwar S, Singh O (2018) Optimal price and warranty length for profit determination: an evaluation based on preventive maintenance. In: Kapur PK, Kumar U, Verma AK (eds) Quality, IT and business operations: modeling and optimization. Springer, Singapore, pp 265–277
Aravindan P, Punniyamoorthy M (2002) Justification of advanced manufacturing technologies (AMT). Int J Adv Manufact Technol 19(2):151–156. https://doi.org/10.1007/s001700200008
Attri R, Grover S, Dev N, Kumar D (2013) Analysis of barriers of total productive maintenance (TPM). Int J Syst Assur Eng Manage 4(4):365–377. https://doi.org/10.1007/s13198-012-0122-9
Azizi A (2015) Evaluation improvement of production productivity performance using statistical process control, overall equipment efficiency, and autonomous maintenance. Procedia Manufact 2:186–190. https://doi.org/10.1016/j.promfg.2015.07.032
Borkowski S, Czajkowska A, Stasiak-Betlejewska R, Borade AB (2014) Application of TPM indicators for analyzing work time of machines used in the pressure die casting. J Ind Eng Int 10(2):55. https://doi.org/10.1007/s40092-014-0055-9
Bourke J, Roper S (2016) AMT adoption and innovation: an investigation of dynamic and complementary effects. Technovation 55–56:42–55. https://doi.org/10.1016/j.technovation.2016.05.003
Cardoso RdR, Pinheiro de Lima E, Gouvea da Costa SE (2012) Identifying organizational requirements for the implementation of advanced manufacturing technologies (AMT). J Manufact Syst 31(3):367–378. http://dx.doi.org/10.1016/j.jmsy.2012.04.003
Choe J-M (2004) Impact of management accounting information and AMT on organizational performance. J Inf Technol 19(3):203–214. https://doi.org/10.1057/palgrave.jit.2000013
Collins H, Gordon C, Terra JC (2006) Chapter 9—The culture and change dimension. In: Collins H, Gordon C, Terra JC (eds) Winning at collaboration commerce. Butterworth-Heinemann, Boston, pp 157–181
Cua KO, McKone KE, Schroeder RG (2001) Relationships between implementation of TQM, JIT, and TPM and manufacturing performance. J Oper Manage 19(6):675–694. https://doi.org/10.1016/S0272-6963(01)00066-3
Dangayach GS, Deshmukh SG (2000) Manufacturing strategy: experiences from select Indian organizations. J Manufact Syst 19(2):134–148. https://doi.org/10.1016/S0278-6125(00)80006-0
Davila A, Elvira MM (2012) Humanistic leadership: lessons from Latin America. J World Bus 47(4):548–554. https://doi.org/10.1016/j.jwb.2012.01.008
Deering S, Johnston LC, Colacchio K (2011) Multidisciplinary teamwork and communication training. Semin Perinatol 35(2):89–96. https://doi.org/10.1053/j.semperi.2011.01.009
Eti MC, Ogaji SOT, Probert SD (2006a) Development and implementation of preventive-maintenance practices in Nigerian industries. Appl Energy 83(10):1163–1179. https://doi.org/10.1016/j.apenergy.2006.01.001
Eti MC, Ogaji SOT, Probert SD (2006b) Impact of corporate culture on plant maintenance in the Nigerian electric-power industry. Appl Energy 83(4):299–310. https://doi.org/10.1016/j.apenergy.2005.03.002
Eti MC, Ogaji SOT, Probert SD (2006c) Reducing the cost of preventive maintenance (PM) through adopting a proactive reliability-focused culture. Appl Energy 83(11):1235–1248. https://doi.org/10.1016/j.apenergy.2006.01.002
Fandel G, Trockel J (2016) Investment and lot size planning in a supply chain: coordinating a just-in-time-delivery with a Harris- or a Wagner/Whitin-solution. J Bus Econ 86(1):173–195. https://doi.org/10.1007/s11573-015-0800-6
Fulton M, Hon B (2010) Managing advanced manufacturing technology (AMT) implementation in manufacturing SMEs. Int J Prod Perform Manage 59(4):351–371. https://doi.org/10.1108/17410401011038900
Fumagalli L, Macchi M, Giacomin A (2017) Orchestration of preventive maintenance interventions. IFAC-PapersOnLine 50(1):13976–13981. https://doi.org/10.1016/j.ifacol.2017.08.2417
Gong Y, Law KS, Chang S, Xin KR (2009) Human resources management and firm performance: the differential role of managerial affective and continuance commitment. J Appl Psychol 94(1):263–275. https://doi.org/10.1037/a0013116
Gosavi A (2006) A risk-sensitive approach to total productive maintenance. Automatica 42(8):1321–1330. https://doi.org/10.1016/j.automatica.2006.02.006
Grout JR, Christy DP (1999) A model of supplier responses to just-in-time delivery requirements. Group Decis Negot 8(2):139–156. https://doi.org/10.1023/a:1008634008759
Guariente P, Antoniolli I, Ferreira LP, Pereira T, Silva FJG (2017) Implementing autonomous maintenance in an automotive components manufacturer. Procedia Manufact 13:1128–1134. https://doi.org/10.1016/j.promfg.2017.09.174
Hana P (2010) Human reliability in maintenance task. Front Mech Eng China 5(2):184–188. https://doi.org/10.1007/s11465-010-0002-4
Hipkin IB, De Cock C (2000) TQM and BPR: lessons for maintenance management. Omega 28(3):277–292. https://doi.org/10.1016/S0305-0483(99)00043-2
Hohan AI, Olaru M, Pirnea IC (2015) Assessment and continuous improvement of information security based on TQM and business excellence principles. Procedia Econ Finance 32:352–359. https://doi.org/10.1016/S2212-5671(15)01404-5
Kachalov N, Kornienko A, Kvesko R, Nikitina Y, Kvesko S, Bukharina Z (2015) Integrated nature of professional competence. Procedia Soc Behav Sci 206:459–463. https://doi.org/10.1016/j.sbspro.2015.10.083
Kamath NH, Rodrigues LLR (2016) Simultaneous consideration of TQM and TPM influence on production performance: a case study on multicolor offset machine using SD Model. Perspect Sci 8:16–18. https://doi.org/10.1016/j.pisc.2016.01.005
Kelly A (2006) 13—Total productive maintenance: its uses and limitations. In: Kelly A (ed) Plant maintenance management set. Butterworth-Heinemann, Oxford, pp 247–265
Kim CS, Djamaludin I, Murthy DNP (2004) Warranty and discrete preventive maintenance. Reliab Eng Syst Saf 84(3):301–309. https://doi.org/10.1016/j.ress.2003.12.001
Koc T, Bozdag E (2009) The impact of AMT practices on firm performance in manufacturing SMEs. Robot Comput-Integr Manufact 25(2):303–313. https://doi.org/10.1016/j.rcim.2007.12.004
Konecny PA, Thun J-H (2011) Do it separately or simultaneously—an empirical analysis of a conjoint implementation of TQM and TPM on plant performance. Int J Prod Econ 133(2):496–507. https://doi.org/10.1016/j.ijpe.2010.12.009
Laureani A, Antony J (2017) Leadership characteristics for lean six sigma. Total Qual Manage Bus Excellence 28(3/4):405–426. https://doi.org/10.1080/14783363.2015.1090291
McCarthy D, Rich N (2015) Chapter Two—The lean TPM master plan. In: Lean TPM, 2nd edn. Butterworth-Heinemann, Oxford, pp 27–54
McKone KE, Weiss EN (2000) Analysis of investments in autonomous maintenance activities. IIE Trans 32(9):849–859. https://doi.org/10.1023/a:1007647329259
Moradkhani A, Haghifam MR, Abedi SM (2015) Risk-based maintenance scheduling in the presence of reward penalty scheme. Electric Power Syst Res 121:126–133. https://doi.org/10.1016/j.epsr.2014.12.006
Morales Méndez JD, Rodriguez RS (2017) Total productive maintenance (TPM) as a tool for improving productivity: a case study of application in the bottleneck of an auto-parts machining line. Int J Adv Manufact Technol 92(1):1013–1026. https://doi.org/10.1007/s00170-017-0052-4
Morlock F, Dorka T, Meier H (2014) Concept for a performance measurement method for the organization of the IPS2 delivery. Procedia CIRP 16:56–61. https://doi.org/10.1016/j.procir.2014.03.003
Mwanza BG, Mbohwa C (2015) Design of a total productive maintenance model for effective implementation: case study of a chemical manufacturing company. Procedia Manufact 4:461–470. https://doi.org/10.1016/j.promfg.2015.11.063
Nouri Gharahasanlou A, Ataei M, Khalokakaie R, Barabadi A, Einian V (2017) Risk based maintenance strategy: a quantitative approach based on time-to-failure model. Int J Syst Assur Eng Manage. https://doi.org/10.1007/s13198-017-0607-7
Okoh P, Haugen S (2015) Improving the robustness and resilience properties of maintenance. Process Saf Environ Prot 94:212–226. https://doi.org/10.1016/j.psep.2014.06.014
Pang S, Jia Y, Liu X, Deng Y (2016) Study on simulation modeling and evaluation of equipment maintenance. J Shanghai Jiaotong Univ (Sci) 21(5):594–599. https://doi.org/10.1007/s12204-016-1768-2
Pascale L, Mainea M, Patic PC, Duta L (2012) Mathematical decision model to improve TPM indicators. IFAC Proc Vol 45(6):934–939. https://doi.org/10.3182/20120523-3-RO-2023.00303
Pinjala SK, Pintelon L, Vereecke A (2006) An empirical investigation on the relationship between business and maintenance strategies. Int J Prod Econ 104(1):214–229. https://doi.org/10.1016/j.ijpe.2004.12.024
Prabhuswamy MS, Ravikumar KP, Nagesh P (2013) Implementation of Kaizen techniques in TPM. IUP J Mech Eng 6(3):38
Realyvásquez-Vargas A, Maldonado-Macías AA, García-Alcaraz JL, Alvarado-Iniesta A (2014) Expert System development using fuzzy if–then rules for ergonomic compatibility of AMT for lean environments. In: García-Alcaraz JL, Maldonado-Macías AA, Cortes-Robles G (eds) Lean manufacturing in the developing world: methodology, case studies and trends from Latin America. Springer International Publishing, Cham, pp 347–369
Rico R, Cohen SG (2005) Effects of task interdependence and type of communication on performance in virtual teams. J Manag Psychol 20(3/4):261–274. https://doi.org/10.1108/02683940510589046
Rodrigues M, Hatakeyama K (2006) Analysis of the fall of TPM in companies. J Mater Process Technol 179(1):276–279. https://doi.org/10.1016/j.jmatprotec.2006.03.102
Sabet E, Adams E, Yazdani B (2016) Quality management in heavy duty manufacturing industry: TQM vs. six sigma. Total Qual Manage Bus Excellence 27(1/2):215–225. https://doi.org/10.1080/14783363.2014.972626
Samaranayake P, Laosirihongthong T (2016) Configuration of supply chain integration and delivery performance: unitary structure model and fuzzy approach. J Modell Manage 11(1):43–74. https://doi.org/10.1108/JM2-01-2014-0005
Sani SIA, Mohammed AH, Misnan MS, Awang M (2012) Determinant factors in development of maintenance culture in managing public asset and facilities. Procedia Soc Behav Sci 65:827–832. https://doi.org/10.1016/j.sbspro.2012.11.206
Seth D, Tripathi D (2006) A critical study of TQM and TPM approaches on business performance of Indian manufacturing industry. Total Qual Manage Bus Excellence 17(7):811–824. https://doi.org/10.1080/14783360600595203
Shen CC (2015) Discussion on key successful factors of TPM in enterprises. J Appl Res Technol 13(3):425–427. https://doi.org/10.1016/j.jart.2015.05.002
Shrivastava D, Kulkarni MS, Vrat P (2016) Integrated design of preventive maintenance and quality control policy parameters with CUSUM chart. Int J Adv Manufact Technol 82(9):2101–2112. https://doi.org/10.1007/s00170-015-7502-7
Singh R, Gohil AM, Shah DB, Desai S (2013) Total productive maintenance (TPM) implementation in a machine shop: a case study. Procedia Eng 51:592–599. https://doi.org/10.1016/j.proeng.2013.01.084
Spanos YE, Voudouris I (2009) Antecedents and trajectories of AMT adoption: the case of Greek manufacturing SMEs. Res Policy 38(1):144–155. https://doi.org/10.1016/j.respol.2008.09.006
Thomas AJ, Jones GR, Vidales P (2006) An integrated approach to TPM and six sigma development in the castings industry. In: Intelligent production machines and systems. Elsevier Science Ltd., Oxford, pp 620–625
Tjosvold D, Tjosvold M (2015) Leadership for teamwork, teamwork for leadership. Building the team organization: how to open minds, resolve conflict, and ensure cooperation. Palgrave Macmillan UK, London, pp 65–79
Tong DYK, Rasiah D, Tong XF, Lai KP (2015) Leadership empowerment behaviour on safety officer and safety teamwork in manufacturing industry. Saf Sci 72:190–198. https://doi.org/10.1016/j.ssci.2014.09.009
Willmott P, McCarthy D (2001a) 2—Assessing the true costs and benefits of TPM. In: Total productivity maintenance, 2nd edn. Butterworth-Heinemann, Oxford, pp 17–22
Willmott P, McCarthy D (2001b) 6—Applying the TPM improvement plan. In: Total productivity maintenance, 2nd edn. Butterworth-Heinemann, Oxford, pp 116–144
Willmott P, McCarthy D (2001c) 9—TPM for equipment designers and suppliers. In: Total productivity maintenance, 2nd edn. Butterworth-Heinemann, Oxford, pp 181–192
Wu B, Seddon JJM (1994) An anthropocentric approach to knowledge-based preventive maintenance. J Intell Manufact 5(6):389–397. https://doi.org/10.1007/bf00123658
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this chapter
Cite this chapter
Díaz-Reza, J.R., García-Alcaraz, J.L., Martínez-Loya, V. (2019). Simple Models. In: Impact Analysis of Total Productive Maintenance. Springer, Cham. https://doi.org/10.1007/978-3-030-01725-5_9
Download citation
DOI: https://doi.org/10.1007/978-3-030-01725-5_9
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-01724-8
Online ISBN: 978-3-030-01725-5
eBook Packages: EngineeringEngineering (R0)