Skip to main content

Working on the Iteration

  • Chapter
  • First Online:
Effective Team Management with VSTS and TFS

Abstract

In the previous two chapters, we discussed how to set up the project, populate the backlog, define the delivery cadence, create teams, plan for the team process, groom the backlog, prioritize the backlog items, size the requirements, and plan the iteration. We even discussed getting things in place—such as a solutions structure, build and deployment pipelines, and testing environments—in a pre-iteration time period. Doing all of this prior to the first iteration enables your team to focus more singlemindedly on implementing backlog items once you kick off project work. In previous chapters, we also discussed the challenges faced by both ideal-sized and large teams during this initial planning stage and how you and your team can use VSTS/TFS features effectively to overcome these challenges.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 16.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Chaminda Chandrasekara, Sanjaya Yapa

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Chandrasekara, C., Yapa, S. (2018). Working on the Iteration. In: Effective Team Management with VSTS and TFS. Apress, Berkeley, CA. https://doi.org/10.1007/978-1-4842-3558-4_3

Download citation

Publish with us

Policies and ethics