Coordinated Replenishments

  • Sven Axsäter
Part of the International Series in Operations Research & Management Science book series (ISOR, volume 26)


In Chapter 3 it was assumed that different items in an inventory could be controlled independently. We shall now leave this assumption and consider situations where there is a need to coordinate orders for different items. We shall still, as in Chapter 3, assume that the items are stocked at a single location. Multi-stage inventory systems are dealt with in Chapter 5. As in Chapter 3, we here consider traditional inventory costs and constraints, i.e., holding costs, ordering or setup costs, and backorder costs or service constraints.


Cycle Time Basic Period Safety Stock Cyclic Schedule Reorder Point 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.


Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.


  1. Axsäter, S. 1980. Economic Order Quantities and Variations in Production Load, International Journal of Production Research, 18, 359–365.CrossRefGoogle Scholar
  2. Axsäter, S. 1984. Lower Bounds for the Economic Lot Scheduling Problem Using Aggregation, European Journal of Operational Research, 17, 201–206.CrossRefGoogle Scholar
  3. Axsäter, S. 1986. Evaluation of Lot-Sizing Techniques, International Journal of Production Research, 24, 51–57.CrossRefGoogle Scholar
  4. Axsäter, S. 1987. An Extension of the Extended Basic Period Approach for Economic Lot Scheduling Problems, Journal of Optimization Theory and Applications, 52, 179–189.CrossRefGoogle Scholar
  5. Balintfy, J. L. 1964. On a Basic Class of Multi-Item Inventory Problems, Management Science, 10, 287–297.CrossRefGoogle Scholar
  6. Bertrand, J. W. M. 1985. Multiproduct Optimal Batch Sizes with In-Process Inventories and Multiwork Centers, HE Transactions, 17, 157–163.Google Scholar
  7. Billington, P. J., J. O. McClain, and L. J. Thomas. 1983. Capacity-Constrained MRP Systems, Management Science, 29, 1126–1141.CrossRefGoogle Scholar
  8. Bomberger, E. A. 1966. Dynamic Programming Approach to a Lot Size Scheduling Problem, Management Science, 12, 778–784.CrossRefGoogle Scholar
  9. Bowman, R. A., and J. A. Muckstadt. 1993. Stochastic Analysis of Cyclic Schedules, Operations Research, 41, 947–958.CrossRefGoogle Scholar
  10. Bowman, R. A., and J. A. Muckstadt. 1995. Production Control of Cyclic Schedules with Demand and Process Variability, Production and Operations Management, 4, 145–162.CrossRefGoogle Scholar
  11. Dobson, G. 1987. The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes, Operations Research, 35, 764–771.CrossRefGoogle Scholar
  12. Doll, C. L., and D. C. Whybark. 1973. An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem, Management Science, 20, 50–55.CrossRefGoogle Scholar
  13. Elmaghraby, S. E. 1978. The Economic Lot Scheduling Problem (ELSP): Review and Extensions, Management Science, 24, 587–598.CrossRefGoogle Scholar
  14. Eppen, G. D., and R. K. Martin. 1987. Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Reduction, Operations Research, 35, 832–848.CrossRefGoogle Scholar
  15. Federgruen, A., H. Groenevelt, and H. Tijms. 1984. Coordinated Replenishments in a Multi-item Inventory System with Compound Poisson Demands, Management Science, 30, 344–357.CrossRefGoogle Scholar
  16. Federgruen, A., and Z. Katalan. 1996a. The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times, Management Science, 42, 783–796.CrossRefGoogle Scholar
  17. Federgruen, A., and Z. Katalan. 1996b. The Impact of Setup Times on the Performance of Multi-Class Service and Production Systems, Operations Research, 44,989–1001.CrossRefGoogle Scholar
  18. Gallego, G., and I. Moon. 1992. The Effect of Externalizing Setups in The Economic Lot Scheduling Problem, Operations Research, 40, 614–619.CrossRefGoogle Scholar
  19. Gallego, G., and R. Roundy. 1992. The Economic Lot Scheduling Problem with Finite Back-order Costs, Naval Research Logistics, 39, 729–739.CrossRefGoogle Scholar
  20. Goyal, S. K., and A. T. Satir. 1989. Joint Replenishment Inventory Control: Deterministic and Stochastic Models, European Journal of Operational Research, 38, 2–13.CrossRefGoogle Scholar
  21. Hsu, W. 1983. On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine, Management Science, 29, 93–105.CrossRefGoogle Scholar
  22. Jackson, P., W. Maxwell, and J. A. Muckstadt. 1985. The Joint Replenishment Problem with a Powers-of-Two Restriction, HE Transactions, 17, 25–32.Google Scholar
  23. Karmarkar, U. S. 1987. Lot Sizes, Lead Times and In-Process Inventories, Management Science, 33, 409–418.CrossRefGoogle Scholar
  24. Karmarkar, U. S. 1993. Manufacturing Lead Times, Order Release and Capacity Loading, in S. C. Graves et al. Eds. Handbooks in OR & MS Vol 4, North Holland Amsterdam, 287–329.Google Scholar
  25. Manne, A. S. 1958. Programming of Economic Lot Sizes, Management Science, 4, 115–135.CrossRefGoogle Scholar
  26. Muckstadt, J. A., and R. Roundy. 1993. Analysis of Multistage Production Systems, in S. C. Graves et al. Eds. Handbooks in OR & MS Vol. 4, North Holland Amsterdam, 59–131.Google Scholar
  27. Renberg, B., and R. Planche. 1967. Un Modele Pour La Gestion Simultanee Des n Articles D’un Stock, Revue Francaise d’Informatique et de Recherche Operationelle, 6, 47–59.Google Scholar
  28. Roundy, R. 1985. 98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems, Management Science, 31,1416–1430.CrossRefGoogle Scholar
  29. Roundy, R. 1986. 98%-Effective Lot-Sizing Rule for a Multi-Product Multi-Stage Production/Inventory System, Mathematics of Operations Research, 11, 699–729.CrossRefGoogle Scholar
  30. Roundy, R. 1989. Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems, Management Science, 35, 1433–1442.CrossRefGoogle Scholar
  31. Shapiro, J. F. 1993. Mathematical Programming Models and Methods for Production Planning and Scheduling, in S. C. Graves et al. Eds. Handbooks in OR & MS Vol. 4, North Holland Amsterdam, 371–443.Google Scholar
  32. Silver, E. A. 1981. Establishing Reorder Points in the (S, c, s) Coordinated Control System under Compound Poisson Demand, International Journal of Production Research, 9, 743–750.CrossRefGoogle Scholar
  33. Silver, E. A., D. Pyke, and R. Peterson. 1998. Inventory Management and Production Planning and Scheduling, 3rd edition, Wiley, New York.Google Scholar
  34. Viswanathan, S. 1997. Periodic Review (s, S) Policies for Joint Replenishment Inventory Systems, Management Science, 43, 1447–1454.CrossRefGoogle Scholar
  35. Vollman, T. E., W. L. Berry, and D. C. Whybark. 1997. Manufacturing Planning and Control Systems, 4th edition, Irwin, Boston.Google Scholar
  36. Wildeman, R. E., J. B. G. Frenk, and R. Dekker. 1997. An Efficient Optimal Solution Method for the Joint Replenishment Problem, European Journal of Operational Research, 99, 433–444.CrossRefGoogle Scholar
  37. Zipkin, P. H. 1986. Models for Design and Control of Stochastic, Multi-Item Batch Production Systems, Operations Research, 34, 91–104.CrossRefGoogle Scholar
  38. Zipkin, P. H. 1991. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem, Operations Research, 39, 56–63.CrossRefGoogle Scholar

Copyright information

© Springer Science+Business Media New York 2000

Authors and Affiliations

  • Sven Axsäter

There are no affiliations available

Personalised recommendations