Advertisement

Building System and Construction Documents

  • Anil Ahuja
Chapter

Abstract

Building system designers will usually be given preliminary architectural drawings as a first step. These drawings permit the designers to arrive at the preliminary scope of the work, roughly estimate the requirements, and determine in a preliminary way the location of equipment and the methods of heating/ventilating and cooling and types of lighting. In this stage of the design, such items as primary and secondary distribution systems and major items of equipment will be decided. The early requirements for types of machinery to be installed will be determined.

Keywords

Ductile Iron Cathodic Protection Power Supply System Building System Major Item 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Science+Business Media Dordrecht 1997

Authors and Affiliations

  • Anil Ahuja
    • 1
  1. 1.Building Systems, Mechanical and ElectricalThe Austin CompanyDes PlainsUSA

Personalised recommendations