Skip to main content

Work Scheduling in Flexible Manufacturing Systems under Tool Availability Constraints

  • Chapter
Advances in Manufacturing Technology
  • 162 Accesses

Summary

Some of the planning problems in flexible manufacturing systems (FMS) are introduced and the impact of tooling considerations is observed. The effects of tool variety, product variety and product similarity on the frequency of two types of tool change, due to product variety and due to tool wear, are identified. It is shown that when variety is great, tooling availability constrains scheduling decisions.

The problem area is illustrated with reference to an example FMS, for which it is shown that tool capacity constrains scheduling decisions. The possibility of developing a part launch sequence which would minimize the need for tool changes is considered but was found ineffective. Dynamically selecting jobs from queues so as to minimize tool change is also found to be ineffective. A linear programming model5 is described, but it was found to require further evaluation.

A tooling post-processor for a simulation model is presented which computes the number of tool changes in any work schedule. For the FMS considered it is found that the number of tool changes due to product variety is small compared to those due to tool wear. It is concluded that the assumptions underlying some of the FMS planning problems must be reconsidered in view of this result.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Stecke K E (1981) Production Planning Problems for Flexible Manufacturing Systems, PhD Dissertation, Purdue University, West Lafayette, USA.

    Google Scholar 

  2. Stecke, K E & Solberg J J (1981) Loading and control policies for a flexible manufacturing system. International Journal of Production Research, 19, No. 5, pp481–490.

    Article  Google Scholar 

  3. Carrie AS & Adhami E (1983) Introducing an FMS by simulation. Proceedings of 2nd International Conference on Flexible Manufacturing Systems, London, October, IFS Publications, Bedford.

    Google Scholar 

  4. Carrie A S, Adhami E, Stephens A & Murdoch I C (1984) Introducing a flexible manufacturing system. International Journal of Production Research, 22, No. 6, pp 907–914.

    Article  Google Scholar 

  5. Menon U & O’Grady P J (1984) A flexible multiobjective production planning framework for automated manufacturing systems. Engineering Costs and Production Economics.

    Google Scholar 

  6. Carrie A S & Petsopoulos A C (1985) Operation sequencing in an FMS. Robotica, 1.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

P. F. McGoldrick

Rights and permissions

Reprints and permissions

Copyright information

© 1986 Springer Science+Business Media New York

About this chapter

Cite this chapter

Carrie, A.S., Perera, D.T.S. (1986). Work Scheduling in Flexible Manufacturing Systems under Tool Availability Constraints. In: McGoldrick, P.F. (eds) Advances in Manufacturing Technology. Springer, Boston, MA. https://doi.org/10.1007/978-1-4757-1355-8_1

Download citation

  • DOI: https://doi.org/10.1007/978-1-4757-1355-8_1

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-1-4757-1357-2

  • Online ISBN: 978-1-4757-1355-8

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics