Advertisement

QC Field Testing

  • James J. O’Brien

Abstract

The quality control (QC) Program usually includes field testing. Traditionally, test requirements are described in the specification wherever (and whenever) the design engineer (or architect) chooses. It is recommended that the quality assurance (QA) procedures call for an index of all test requirements (or the requirements themselves) to be listed in Division 1 of the specifications (01400 Quality Control). If this has not been done during the design phase, the QC group must set up an inspection plan.

Keywords

Storage Tank Ductile Iron Test Requirement Inspection Plan Batch Plant 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Science+Business Media New York 1989

Authors and Affiliations

  • James J. O’Brien

There are no affiliations available

Personalised recommendations